ML20128E555
| ML20128E555 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 06/28/1985 |
| From: | Wilson R GENERAL PUBLIC UTILITIES CORP. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| References | |
| 5211-85-2121, NUDOCS 8507050371 | |
| Download: ML20128E555 (1) | |
Text
'
l M
GPU Nuclear Corporation RU lN E
loo lnterpace Parkway Parsippany, New Jersey 07054-1149 (201)263-6500 TELEX 136-482 Writer's Direct Dial Number:
i June 28, 1985 5211-85-2121 Office of Nuclear Regulatory Commission Attn:
J. F. Stolz, Chief Operating Reactor Branch No. 4 U.S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
Three Mile Island Nuclear Station Unit 1 (TMI-1)
Operating License DPR-50 Docket No. 50-289 EQ - Incore Thermocouple Cables / Connectors As discussed in JIO-84-TI-6 Rev. 2, attached to GPUN letter dated March 25, 1985, GPUN sponsored a test of the incore thermocouple cables and connectors from March 17, 1985 to April 4, 1985. The test was actually conducted by Bailey Controls Quality Test Lab; irradiation was performed at Georgia Institute of Technclogy;'
and the steam and chemical spray test was performed at the Nuclear Engineering Lab of Ohio State University. Using Test Report No. QR-0141-000 Rev. B dated 6/12/85 as a basis, GPUN now considers the incore thermocouple cable and connectors fully qualified to the 00R Guidelines in accordance with 10CFR50.49. GPUN EQ File EQ-TI-139 documents the qualification and is available for review in the GPUN central file.
Ther'efore, JIO-84-TI-6.is no longer required and is cancelled.
cincerel,
W-
. F. Wils n Vice President Technical Functions Ir/2042f cc:
R. Conte J. Thoma 0507050371 050A2G DR ADOCK 0500 9
g l
0
,. = -
,7 GPU Nuclear Corporation is a iubsidiary of General PutAc Utilities Corporation h