Provides Revised Schedule for Implementation of Procedure EPP 01-2.1, Emergency Classification, Per Weaknesses Noted in Insp Rept 50-482/92-13.Procedure Will Be Revised No Later than 930108
ML20128E407
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 12/03/1992
From: Hagan R
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NA-92-0125, NA-92-125, NUDOCS 9212080080
Download: ML20128E407 (2)


Text

1 l

t WQLF CREEK NUCLEAR OPERATPG CORPORATION notmi c n.m.n Vre bwbni Nmiear Aasutana December 3, 1992 I

NA 92-0125 s

U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Hall Station F1-137 Washington, D. C.

20$$$

Reference:

1) Letter WM 92 0135 dated August 21, 1992 from B. D. Withers, WCNOC, to NRC
2) Letter HA 92-0095 dated October 29, 1992 from R. C. Hagan, VCNOC, to NRC

Subject:

Docket No. 50-482:

Revised Schedule for Implementation _

of Revised Emergency Action Levels (EALs) Procedure Gentlemen:

This letter provides a revised schedule for the implementation of procedure EPP 01-2.1

' Emergency Classification".

Procedure EPP 01-2,1 will be revised no later than January 8, 1993.

Reference 1 provided Wolf Creek Nuclear Operating _ Corporation's (WCNOC) response to weakness 482/9213-01 which committed to revising procedure EPP 01-2.1 by Detober 30, 1992 and implementing the procedure within thirty days of NRC approval.

Reference 2 submitted procedure EPP 01-2.1 for review.

However, since the revision did-not constitute a

reduction in-the offectiveness of the Radiological Emergency Response Plan, Reference 2 indicated the procedure would be released within thirty days of the date the letter. Subsequent to the submittal of the revised procedure, concents were verbally received from Dr. D.

B. Spitzberg of your office indicating the need for further changes.

Additionally, an event at the - Callaway Nuclear Plant has identified the need to further revise the procedure to address'a loss of-annunciators.

Based upon these factors, additional. time is.requir(, to revise-and implement the procedure.

This change in commitment was discussed with Dr.

D.~B. Spitzberg, NRC and Mr.

G. A. Pick, Senior Resident Inspector, NRC on November 25, 1992.

- 0 ~i c.~; 5 G 9212000000 921203 PDH ADOCK 0S00 2

f-co ne.it,ne,,,,,,em.xs<<ess,enone <3ic)3s4 aaat

)

_p

NA 92-0125 Page 2 of 2 If you have any questions concerning this matter, please contact me at (316) 364 8831 Ext. 4553 or Hr. Kevin J. Moles of my staff at extension 4565.

Very truly yours, g

m

(,

Robert C. Itagan Vice President Nuclear Assurance RCll/jad ces A. T. Ilowell (llRC)

J. L. Hilhoan (NRC)

G. A. Pick (Y510; W. D. Reckley s'NRC)

D. 11. Spitzberg (NRC) l 1

l l

l l

l l'-.

l

.