T VERMONT YANKEE NUCLEAR ' POWER CORPORATION FVY 85-61 RD 5. Box 169. Ferry Road, Brattleboro, VT 05301 REPLY TO
- f. g ENGINEERING OFFICE 1671 WORCESTER ROAD FRAMINGHAM. MASS ACHUSETTS 01701 TELEPHO*eE 677-472 8100 July 1, 1985 U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Office of Nuclear Reactor Regulation Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing
Reference:
a)
License No. DPR-28 (Docket No. 50-271) b)
Letter, USNRC to All Operating Reactors, Generic Letter 82-33, Supplement 1 to NUREO 0737 - Requirements for Emergency Response Capability, dated 12/17/82 c)
Letter, VYNPC to USNRC, FVY 83-85, dated 8/4/83 d)
Letter, USNRC to VYNPC, NVY 84-128, dated 6/12/04 e)
Letter, VYNPC to USNRC, FVY 84-64, dated 6/19.84 f)
Letter, USNRC to VYNPC, NVY 84-223, dated 1D/11/84 g)
Letter, USNRC to VYNPC, NVY 85-124, dated 6/7/85
Dear Sir:
Subject:
Vermont Yankee Detailed Control Room Design Review Summary Report (DCRDR)
By letter dated October 11, 1984 (Reference f)), Vermont Yankee was required to submit a summary report for the Detailed Control Room Design Review (DCRDR), in accordance with the Drder Confirming Licensee Commitments on Emergency Response Capability, dated June 12, 1984 (Reference d)]. The Vermont Yankee Detailed Control Room Design Review Summary Report is herein provided as to this letter.
This report provides a list of the Human Engineering Discrepancies (HED's) identified, the modifications planned to address these discrepancies and the schedule for implementation of those modifi-cations.
In addition, it describes any variations in the conduct of the DCRDR from the program plan provided in our transmittal of June 19, 1984 [ Reference e)].
The report of your staff's /pril 1-4, 1985 In-Progress Audit of Vermont Yankee's DCRDR (Reference g)] was not received in time to be incorporated in the enclosed summary report. The In-Progress Audit results are currently under review. We do note that the task analysis enhancement effort discussed during g7050321850702 00 F
ADOCK 05000271
\\ ;0 PDR O
s VERMONT YANKEE NUCLEAR POWEH COMPORATION U.S. Nuclear Regulatory Commission July 1, 1985 Page 2 i
the audit exit interview has been initiated by our contractors, General Physics, with completion scheduled for the end of the year. These efforts will be fac-tored into the schedules provided in the summary report. A supplemental submit-tal addressing these enhanced and revised schedules will be provided by September 1985.
We trust that the enclosed summary report is deemed acceptable; however, should you have any questions or require additional information concerning this subject, please contact us.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION Ai n
?
Warren P.
urphy
(/
Vice President and Manager of Operations
/dm i