ML20128E222

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-245/92-28,50-336/92-30 & 50-423/92-27 on Stated Dates.No Violations Noted. Engineering & Technical Support to Plant of Good Quality
ML20128E222
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 02/02/1993
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20128E225 List:
References
NUDOCS 9302100349
Download: ML20128E222 (2)


See also: IR 05000245/1992028

Text

l

K h-

-'

c

i

,

'

FEB

21993

Docket Nos. 50-245

50-336

50-423

Mr. John F. Opeka

Executive Vice President - Nuclear

Northeast Nuclear Energy Company

P. O. Box 270

Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT:

COMBINED INSPECTION REPORT NOS 50-245/92-28,50-336/92-30

AND 50-423/92-27

This letter transmits the report resulting from the announced safety inspection conducted by

Mr. R. J. Paolino and other NRC inspectors on November 2-6,1992 and November 16-

20,1992 at the Northeast Nuclear Energy Company's Corporate Offices in East Berlin,

Connecticut. The preliminary findings were discussed with Mr. R. M. Kacich and other

members of your staff at the conclusion of the inspection.- Areas examined during this .

1

'

inspection are described in the enclosed report. Within these areas, the inspection focused on

-

issues important to public health and safety, and consisted of performance observation of

engineering support for various activities related to plant modifications, licensee event

reports, non-conformances reports, and quality assurance audits.

- :

The inspector concluded that overall, the engineering and technical support to the plant was-

of good quality and adequate in supporting plant activities.

- Within the scope of this inspection, no violations were observed.'

,

No reply to this letter is required. Your cooperation with~ us in this matter is appreciated.

.

Sincerely,

l

l

,

i'

L

Jacque P. Durr, Chief

L

Engineering Branch-

Division of Reactor Safety

Enclosure:

NRC Region I Combined Inspection Report Nos. 50-245/92-28, 50-336/92-30

'

and 50-423/92-27.

9302100349.930202

PDR

ADOCK 05000245'

G

PDR

(

s

_

- - .

_

_

_

'

,-

FEB

2 1993

.

Mr. John F. Opeka

2

,

cc w/ encl:

W. D. Romberg, Vice President-Nuclear Operations

S. E. Scace, Nuclear Station Director

H. F. Haynes, Nuclear Unit Director-Unit 1

i

-J. S. Keenan, Nuclear Unit Director-Unit 2

'

I

C. H. Clement, Nuclear Unit Director-Unit 3

R. M. Kacich, Director, Nuclear Licensing

D. O. Nordquist, Director of quality Services

Gerald Garfield, Esquire

-

Nicholas Reynolds, Esquire

,

K. Abraham, PAO (2)

Public Document Room (PDR)

.

Local Public Document Room (LPDR)

'

Nuclear Safety Information Center (NSIC)

NRC Resident inspector

State of Connecticut SLO Designee

bec w/ encl:

Region 1 Docket Room (with concurrences)

.

R. Blough, DRP

,

L. Doerflein, DRP

I

W. Raymond, SRI- Haddam Neck

P. Swetland, SRI- hiillstone

.

V. McCree, OEDO

D. Jaffe, PM- NRR

'

G. Vissing, PM- NRR

V, Rooney, PM-NRR

.

R, Barkley, DRP

'

DRS SALP Coordinator

i

.

.

A

O

RI:DRS

RI:

Rbt

nf

Durr

P

I/2t/93

/t5793

2/.2/92

OFFICIAL RECORD COPY

'

A:MILLSTON.RP