ML20128E201

From kanterella
Jump to navigation Jump to search
Forwards Requalification Program Evaluation Rept 50-336/92-33OL-RQ Administered 921214-17.Fourteen Operators Passed Written walk-through & Simulator Portions of Exam. Requalification Program Assigned Rating of Satisfactory
ML20128E201
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/28/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20128E203 List:
References
NUDOCS 9302100342
Download: ML20128E201 (3)


See also: IR 05000336/1992033

Text

..-

m

,

q

o

JAN 2 81993

Docket No. 50-336

Mr. John F. Opeka

Executive Vice President - Nuclear

Northeast Nuclear Energy Company

P. O. Box 170

Hartford, Connecticut 061414270

Dear Mr. Opeka:

SUlUECT: REQUALIFICATION PROGRAM EVALUATION REPORT NO. 50 336/

92-33 (OL-RQ)

From December 14 - 17,1992, the NRC administered requalification examinations to five

employees of your company who operate the Millstone Unit 2 Plant. These examinations,

coupled with those administered from April 7 - 9,1992, in which nine operators were

examined, result in a total of fourteen operators examined by the NRC. All fourteen

operators passed the written, walk through, and simulator portions of the examination based

on NRC's grading of the examination. As a result of these evaluations, your requalification

program has been assigned an overall program rating of satisfactory in accordance with the

criteria of NUREG-1021 ES 601.

This evaluation addressed areas important to public health and safety and was conducted in

accordance with proposed Revision 7 to NUREG-1021, Operator Licensing Examiner

Standards, ES-601, " Administration of NRC Requalification Program Evaluations." The

evaluation had two purposes, evaluating the effectiveness of the licensed operator

requalification training progtum at maintaining the competency of licensed operators, and

examining the individual operators to determine if they would satisfy the regulatory

requirement of passing an NRC administered examination prior to license renewal. At the

conclusion of the examination, the results of the examination were discussed with Mr. Ruth,

Mr. Smith, and other members of your staff.

In addition to the examinations and subsequent training program evaluation, the NRC

performed an inspection of the Millstone Unit 2 requalification training program. The

purpose of this inspection was to determine whether or not there existed any training

deficiencies indicative of those identified after the previously conducted Millstone Unit I

unsatisfactory program evaluation. No significant similarities were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and

the enclosure will be placed in the NRC Public Document Room.

OFFICIAL RECORD COPY G:MS2RQ92.KDI

050C01

9302100342 930128

PDR

V

' ADOCK 05000336

PDR

I i

j

_. _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - - - - _ _ _ _ _ _ - - _ _ - - - _ - - a

-

..

..

Mr. John F. Opeka 2

Should you have any questions regarding this examination and inspection, please contact me

at 215-337 5291.

Sincerely, j

&[ghfisd hh4 i

'

(.,fkut/ ~

XG u

lee H. Bett hausen, Chlef

Operations Branch

Division of Reactor Safety

Enclosure: Examination Report No. 50-336/92-33 (OL-RQ)

w/ Attachments 1 and 2

~ Attachments:

1. Northeast Utilities letter MP-93-36 from S. E. Scace to

Dr. L. Bettenhausen, dated January !!,1993 -

2. Simulator Facility Report

cc w/ encl.;_w/o Attachments 1 and 2:

W. D. Romberg, Vice President, Nuclear Operations

J. S. Keenan, Nuclear Unit Director

R. M. Kacich, Director, Nuclear Licensing

D. O. Nordquist, Director of Quality Services

M. Wilson, Nuclear L' censing

Gerald Garfield, Esquire

Nicholas Reynolds, Esquire

NRC Resident Inspector

State of Connecticut, SLO

cc w/ encl. and Attachments 1 and 2:

S. E. Scace, Vice President, Millstone Station-

R. Spurr, Acting Supervisor, Training Department

Public Document Room (PDR)

local Public Document Room (LPDR) -

Nuclear Safety Information Center (NSIC)

OFFICIAL RECORD COPY G:MS2RQ92.KDI

i

~

>

.

I

..

Mr. John F. Opeka 3 l,

l

bec w/ encl.; w/o Attachments 1 and 2:

Region I Docket Room (with concurrences)

R. Gallo, Chief, OLB, NRR '

V. McCrec, OEDO

O. Vissing, PM, NRR

L. Bettenhausen, DRS

J. Joyner, DRSS

R. Blough, DRP

G. Meyer, DRS

L. Doerflein, DRP

W. Raymond, SRI, lladdam Neck .

'

P. Swetland, SRI, Millstone

R. Barkley, DRP

K. Ihnen, DRS

Mark Jones, NRC Consultant (EG&G)

OL Facility File

DRS Files (1)

bec w/ encl. and Attachments I and 2:

Master Exam File

.

RI:DRS RI:DRS g RI:DRS

Meyergrir

-

lhnen/dmg Betyt nha

M M '

  1. c

01/26/93 014 3 7 O 3

OFFICIAL RECORD COPY- - G:MS2RQ92.KD1

. _ _ _ _ _ . _ . _ _ _ _ . . .