o Tennessee Vaney Auttmty. Psst OQce boi 2000 SneJy Da sy. Tenressee 37379 P000 Robert A. Fenech V.ca Prevdent. Sequoyah Nuclear Piant February 4, 1993 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C. 20555 Geni;lemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NdCLEAR PLANT (SQN) - DETAILED CONTROL ROOM )ESIGN REVIEW (DCRDR) IMPLEMENTATION STATUS REPORT (TAC NO. $1203/51204)
References:
1.
TVA letter to NRC dated May 7, 1992.
2.
TVA letter to NRC dated November 26, 1086, "Sequoyah Nuclear Plant - Detai N Control Room Design Review" The purpose of this letter is to inform NRC of the DCRDR implementation status and results of the Category 3 human engineering deficiencies (HEDs) evaluation for the SQN'DCRDR effort.
Implementation status reporting was conaitted to by Reference 1.
There are 272 Category 3 (uonsafety significant) HEDs identified in Reference 2.
Two additional Category 3 HEDs have been added because.of Category 2 downgrades, as documented in Reference 1..
The following is a breakdown of the resolution of.these items:
124 resolutions complete and implemented 14 implementation planned for Cycle l6 refueling outages 29 required no corrective action (Reference 2) 107 require no corrective action (current evaluation)
The current evaluation decisions were based on operating exporience and plant changes made since the-original HED evaluations. The resolution of-these 107 Category 3.(nonsafety significant) HEDs is no longer cost effective'and will not be~ implemented.
The 'HEDs affected by tilis decision are listed in the enclosure.
1 080g 0 g
d 9ao21ooao2,aoaor
[O DR' ADOCK 05000327
\\-
g fon
4 U.S. Nuclear Regulatory Commission Page 2 February 4, 1993 TVA has resolved the safety significant (Category 1 and 2) DCRDR HEDs.
TVA will resolve more than one half of the nonsafet> significant (Category 3) HEDS originally identified by the DCRDR effort by the end of the Cycle 6 refueling outages. When implemented, these actions, along with the Category 3 HED cancellations documented in this letter and Reference 2, will complete the DCRDR effort for SQN.
Pleace direct questions concerning this issue to K. C. Weller at (615) 843-7527.
Sincerely, kbYY YM Robert A. Fenech Enclosure cc (Enclosure):
Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commisnion One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-0199
- i ENCLOSURE g
NONSAFETY SIGNIFICANT CATEGORY 3 HUMAN ENGINEERING DEFICIENCIES (HED) BEING CANCELLED HED Nh liEILNai HED No.
0207 5147 8195 0214 5149 8196 0225 6009 8220 0227 6021 8221 0231 6027 8224 i
0238 7002 8234 0250 7006 8236 0286 7007 8240 0291 7009 8252 0299 7019 8260 0305 7021 9028 0310 7026 0321 7033 0333 7035 0354 7050
+
0371 7060 0378 7061 j
1027 7068 1028 7072 1034 7078 1095 7079 2005 7080 2007 7082 2012 7083 l
2016 7084 2025 7085 2028 7086 2033 7089 3014 7093 3074 7095 3083
'097-3239 7101 3241 7136
^
4020 7137 4031 8002 4056 8004 5005 8015 5009 8027 5023 8039
-5031 8050 5032 8063 5037 8077 5075 8081 5083 8090 5117 8163 5126 8167 5138 8169.
c
'5141 8170
.