ML20128D626

From kanterella
Jump to navigation Jump to search
Automatic Reactor Trips & ESFAS (DG Start & Loading,Afw Start & Feedwater Isolation & Auxiliary Bldg Isolation) & Entry in LCO 3.0.3 When Both High Head SI Pumps Taken Out of Service
ML20128D626
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/01/1993
From: Fenech R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20128D629 List:
References
NUDOCS 9302100190
Download: ML20128D626 (2)


Text


- - _ -.

'g e

i

.~

' tenrmwn VauefAvttmty. Post 0%ce fMx 2000 Soddy-Dasy. Tent:cuee 37379 2003 Robert A. Fonech Vte Presdent Segacyah Nuclear Plant February 1, 1993 U.S. Nuclear Regulatory Commission ATTNt Document Control Desk Washington, D.C. 20555 Gentlemen:

TENNESSEE VALLEY AUTi!0RITY - SEQUOYAll NUCLEAR PLANT UNITS 1 AND 2 -- DOCKET NOS. 50-327 AND 50-328 - FACILITY OPERATING LICENSES DPR-77 AND DPR LICENSEE EVENT REPORT (LER) 50-327/92027 The enclosed LER provides details concerning automatic. reactor trips and engineered' safety feature actuations (diesel generator start-and-loading, auxiliary f eedwater start and f eedwater isolation,' and auxiliary building isolation) and an entry into Limiting condition for Operation 3.0.3 when-both Unit 2 high head safety-injection pumps were taken out of_ service.

This event is being reported in accordance with 10 CFR 50.73(a)(2)(iv) as a condition that resulted in the automatic actuation of engineered-safety features, including the reactor protection system. 10 CFR-50'.73(a)(2)(i)-

as-an operation prohibited by technical specifications, and 10 CFR 50.73(a)(2)(v) as an event that could have prevented fulfillment of a safety system.

Sincerely, QQ f.

A, Robert A. Fenech I

Enclosure cc:

See page 2 08001g 9302100190 930201

.l

~ gDR1 ADOCK0500ga

/

y

Oc e

U.S. Nuclear Regulatory Commission Page 2 February 1, 1993 cc (Enclosure):

INFO Records Center institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339-3064 Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White F11nt, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Mr. b. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-0199

- e

__ _ - _ _ - _ _ _ _ _ _ _ _