Corrects Chronology of Required Improvements Re Five Human Engineering Discrepancies from Control Room Design Review Final Rept & Suppl 1 to Final Rept
ML20128D536
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 05/24/1985
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Butler W
Office of Nuclear Reactor Regulation
References
CON-#143, CON-#285-143 NUDOCS 8505290107
Download: ML20128D536 (3)


Text

.

4 PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA, PA.19101 JOHN 5. KEMPER VIC E-PR ESID E NT tnsemas RehG ANO RESE ARCH May 24, 1985 Sf2 Mr. W. R. Butler Docket Nos: 50 M Licensing Branch No. 2 50-353 U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Limerick Generating Station Limerick Control Room Design Review

Reference:

1) Letter from J. S. Kemper to A. Schwencer dated June 25, 1984
2) Letter from J. S. Kemper to A. Schwencer dated July 17, 1984
3) Letter from J. S. Kemper to A. Schwencer dated November 2, 1984
4) Letter from J. S. Kemper to A. Schwencer dated March 21, 1985 File:

Gov't 1-1 (NRC)

Dear Mr. Butler:

Paragraph 3 of Attachment 4 to Facility Operating License NPF-27 requires that certain control room enhancements, including changes to standard control switch shapes, be completed prior to exceeding five percent of rated power.

This requirement is based upon information contained in Section 18 of the Safety Evaluation Report, Supplement 3 (SSER-3) as referenced by the License Condition.

The SSER, in turn is based upon commitments made by Philadelphia Electric Company in reference 1 and 2 which state that changes to some standard control switch shapes and colors will be made prior to exceeding five percent power.

In the reference, 4 letter PECo stated that this License Condition had been satisfied.

During a review of activities on the Limerick Control Room Design Review (CRDR) it was dir svered that some of these activities had not been completed at the time that the reference 4 letter ~was sent. The control room enhancements required to be completed prior to exceeding fiv'e percent power have now all been implemented and the purpose of this letter is to correct the chronology of the required improvements.

0gh 8505290107 850524 J

PDR ADOCK 05000352 p

PDR 5

C~

5 r;c The fiv'e Human Engineering Discrepancies (HEDs) from the'CRDR Final Report and Supplement #1 to the Final: Report (reference if

-1 and 3. respectively) _ which had not been corrected prior to the

-reference 4 letter were: HED #D2-05; HED #SD2-04: HED SD4-02; HED: #I5-03 (e); and HED #SI5-05.

The first four.HEDs involve coloring of control switches to improve the standardization ~ of the Limerick

control. room.

The. fifth HED, HED SI5-05, has been resolved by a

[

portable hand-held adapter.

As:of~this date the control switches have been re-painted and the adapter is _available to the operators.

Thus,. the Control Room Enhancement required by paragraph 3 of Attachment 4 to NPF-27 have now been completed.

L Q

t 4

M /Y

TJC/sjf/5238501

_ Copy to_: See Attached Service List

'J..T. Wiggins 9

5 9

s f

_h

' /

a.

I cc: -Judge Helen F. Hoyt Judge derry Harbour Judge Richard F. Cole-

. Troy B. Conner, Jr., Esq.

Ann P. Hodgdon, Esq.

Mr. Frank R. Rcrnano Mr. Robert L. Anthony

- Ms. Phyll is Zitzer -

Charles W. Elliot, Esq.

Zori G. Ferkin, Esq.

Mr. Thomas Gerusky.

Di rector, Penna.. Emergency Management Agency Angus R. Love, Esa.

. David Wersan, Esq.

Robert J. Sugarman, Esq.

Martha W. Bush, Esq.

' Spence W. Perry, Esq.

-Jay M. Gutterrez,.Esq.

Atomic Safety & Licensing Appeal Board Atomic Safety & Licensing Board Panel Docket &' Service Section Mr. James.Wiggins Mr. Timothy R. S. Campbell M

.