ML20128D535
| ML20128D535 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 02/01/1993 |
| From: | Blough A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20128D540 | List: |
| References | |
| NUDOCS 9302100172 | |
| Download: ML20128D535 (3) | |
See also: IR 05000245/1992029
Text
(Q
t
,s -
FEB 011993
Docket Nos. 50-245; 50-336; 50-423
Mr. John F. Opeka
Executive Vice President-Nuclear
Northeast Nuclear Energy Company
P.O. Box 270
Hartford, Connecticut 06141-0270
Dear Mr. Opeka:
SUBJECT:
MILLSTONE COMBINED INSPECTION 50-245/92-29; 50-336/92-31;
50-423/92-28
This refers to the safety inspection conducted by Mr. P. Swetland and others of this office on
October 28,1992, through December 22,1992, at Millstone Station in Waterford, Connecticut.
The preliminary findings were discussed with Mr. S. S:: ace, the Unit Directors, and others of
your staff at the conclusion of the inspection. Areas examined during the inspection are
described in the enclosed report. Within these areas, the inspection focused on issues important
to public health and safety, and consisted of performance observations of ongoing activities,
independent verification of safety system status and design configuration, interviews with
personnel, and review of quality records.
During this inspection, we noted good performance in the implementation of design reviews and
'
testing of the Unit 2 heating, cooling, and ventilation systems, and in the preparation and conduct
of the Unit 2 refueling operations and steam generator post-weld heat treatment.
Your identification and proposed correction of the failure to conduct timely Unit I reactor vessel
surveillance capsule analyses were evaluated during this inspection. Likewise, your response to
the Unit I reactor trip caused by an operator failure to follow procedures during a surveillance
test was reviewed. We determined that your corrective actions were acceptable, and the events
had minor safety significance. Therefore,in accordance with Section VII.B of the Enforcement
Policy, enforcement discretion was exercised for these cases and no violations were cited.
During this' inspection period, the inspectors identified that certain requirements of your
_
administrative control procedures were not adequately implemented. These included: (1)
periodic review and reporting of temporary modifications installed for a prolonged period; (2)
safety evaluations for some scaffolding installations; and (3) revision of design documents
following completion of modifications such that required Final Safety Analysis Report updates
are submitted in a timely manner. In addition, the licensee failed to implement committed
corrective action following a' 1990 Unit 2 mispositioned valve event. As a result, another
inadvertent repositioning of a Unit 2 valve caused a momentary loss of shutdov a cooling during
3
080000
OFFICIAL REconD COPY
3
h
9302100172 930201
,
ADOCK 05000245
O
.
. _ _ _ _ _ _ _
... . ,
l
r
,
Northeast Nuclear Energy Company
2
this inspection. Three violations of NRC requirements concerning these problems are cited in
the enclosed Notice of Violation.
You are required to respond to the enclosed Notice of Violation and should follow the
instructions in the enclosed Notice when preparing your response. In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the enclosed Notice will be
placed in the NRC Public Document Room. The responses directed therein are not subject to
,
the clearance procedures of the Office of Management and Budget as required by the Paperwork
Reduction Act of 1980, Public Law No. 96.511.
We appreciate your cooperation.
Sincerely,
'Crh M T'~ W
jy iun2) WMn
A. Randolph Blough, Chief
Projects Branch No. 4
Division of Reactor Projects
Enclosure:
1.
2.
NRC Combined Inspection Report 50-245/92-29; 50-336/92-31; 50-
423/92-28
cc w/ encl:
W. D. Romberg, Vice President - Nuclear, Operations Services
S. E. Scace, Vice President, Millstone Nuclear Power Station
H. F. Haynes, Nuclear Unit Director, Unit 1
J. S. Keenan, Nuclear Unit Director, Unit 2
C. H. Clement, Nuclear Unit Director, Unit 3
R. M. Kacich, Director, Nuclear Licensing
D. O. Nordquist, Director of Quality Services
Gerald Garfield, Esquire
Nicholas Reynolds, Esquire
K. Abraham, PAO (2)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut SLO Designee
OFFwul RECORD COPY
. _ . - _ _ .
. - ~ .
_ _ _ _
-.. _._
_
..
_.
_
_
.
1 ,
,
t
t'
,
[
Northeast Nuclear Energy Company
3
1
bec w/ encl:'
<
i
Region I Docket Room (with concurrences)
J. Wiggins, DRP
J. Joyner, DRSS
-
J. Stolz, NRR/PD I-4 -
R. Blough, DRP
,
L. Doerflein; DRP
!
C. Anderson, DRS -
!
W. Raymond, SRI, Haddam Neck
- -
P. Swetland, SRI, Millstone
V. McCree, OEDO
J. Anderson, PM, NRR (see para 3.1)
,
'
DRS/EB SALP Coordinator
R. Barkley, DRP
bec w/ Report Cover Sheet and Executive Summary only:
C. Hehl, DRP
!
W. Hodges, DRS
R. Cooper, DRSS -
W. Lanning, DRS
,
L. Bettenhausen, DRS
l
D. Holody, EO
J. Durr, DRS
g
l
- RI:DRP -
RI:DRP
- RI:DRP
P.SWETLAND
L;DOERFLEIN
' A.BLOUGH
L
/ /92
/ /92
- / /92
,
[
]
.
.
,
_ __
..
.
. -