ML20128D222

From kanterella
Jump to navigation Jump to search
Forwards Applications for Six Listed Employees for Senior Operator Licenses.W/O Encl
ML20128D222
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/08/1974
From: Larson C
NORTHERN STATES POWER CO.
To: Collins P
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 9212070185
Download: ML20128D222 (2)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

f NORTHERN STATES POWER COMPANY Ibaticello Nxlear Generating Plant Fbnticello, Minnesota 55362 February 8, 1974 Mr. Paul F. Collins, Chief Operator Licensing Branch Directorate of Licensing U. S. Atoc.ic Energy Comission Kashington, D. C.

20545

Dear Pr. Collins:

Attached are the applications for senior operator licenses for six employees of Northern States IWer Ccupany at the Fbaticello Nuclear Generating Plant.

The applications are being mde in accordance with Title 10, Part 55, Section 55.10. Lach of the six analoyees presently holds an Operator's License. The six applicants are:

h'illiam F.11oelne Uf ?,( Plant Equipmat and OP 293E-1" Reactor Operator (PEGRO)

May 10, 1973 Julius H. Carstens s'l l Plant Equipment and OP 293S-18

~ Reactor Operator (PEGRD)

Fby 10, 1973 Lugene L. Lamey W 4 /-

Plant liui nent and OP 2937-1 t i Reactor Operator (PE4IO) thy 10,1973 thrvin W. Danca y q'.7 7 Plant Equipacnt and OP 3359 F.eactor Operator (PEGPO)

August 9, 1973

~

fonald O. Poistra ] V 2,/.

Lead Plant Equipmaat and OP 2946-1 Reactor Operator (LPESRO)

May 13, 1973 lbaglas A. Kiltscheck 3g, Reactor Operator Plant Equipment and OP 2940-1 "O

May 10, 1973

  • Licenses have same nu.aber.

The services of these men as licensed operators are mquired for the continued operation of the Ibaticello Nxlear Generating Plant located near hbnticello, Minnesota. The applications for senior operator licenses for the six c=ployees is mde on the basis of probable future need for their services as senior licensed operators.

Presently, in additica to the six senior operator licensed Shift Supervisors, we have only two additionni shift operators with senior operator licenser.

9212070185 740208 PDR ADOCK 05000263 V

PDR

F a.

Each of the six licensed applicants has remained actively engaged in plant and reactor operations aM has performed his duties aM respsibilities in a safe and ccm etant manner. Through self study aM with the woefit of the retrain-ing program, these men have maintained a thorough knowledge of the reactor and reactor control systems, instrunentation, and operatire procedures for remal and abnomal conditions.

It is my belief that each of the six applicantsis caprible and qualified to be a Licensed Senior Operator at the & nticello Nucisar j

Generating Plant.

Tentative arrangements have been made with Mr. Robert Campbell of the Operator Licensing Branch to have the senior operator =vamination given at the Monticello plant site on Harch 7, 1974.

If a&11tional inforrution is required for these applications, please contact the undersigned.

Yours very truly, C. E. Larsca Plant Nanager Monticello ibclear Generating Plant i

lbaticello, Minnesota 55362

]

C1/kik cc:

G 11 Neils File attachments 4

,cw..

-n

,w.-.,

gg.

,.g...,

-..,,,.,y,,.

,,g_,,,

-