Annual Rept for 1992. Five Unscheduled Scrams Occurred During Reporting Period.Evacuation Horns Malfunctioned During Routine Semiannual Evacuation Drill
ML20128D030
Person / Time
Site: 05000134
Issue date: 12/31/1992
From: Bobek L
WORCESTER POLYTECHNIC INSTITUTE, WORCESTER, MA
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 9302100027
Download: ML20128D030 (2)


Text

,

t .' oi

.A'.

[.II l Nuclear Reactor Facility l

Jo 1001nstitute Road WOIRCESTEll

  • '"*rm A op2280 POLYTECllNIC (508) 831 5276 llli

} NS.TITUTh. (sosj 83i.5236 FAX (508) 8315M0 January 29, 1993 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re! Docket No. 50-134 License R-61

  • Annual Meport_for 1992

Dear Sir:

1 The operation of the WPI Reactor was routine during most of 1992.

A malfunction of the facility evacuation horns during a routine semi-annual evacuation drill in January prompted a report as required by the WPI Technical Specifications. The problem.Was promptly analyzed and corrected. There has been no recurrence.

A commercially made solid state log power and period amplifier was installed in February, replacing the original vacuum tube based amplifier. It has _been working properly. In June, an ultra-violet sterilizer was placed in line with the existing water domineralizer to eliminate algae growth. The system has worked adequately.

A log-N chart was removed . -in January. Analysis of the chart revealed the total power produced for the period May 1991 to December 1991 was 21.7 kW-hrs. The total power produced by the reactor as of January 1992 was 7585 ' kW-hrs. The total power produced by the-present fuel is 171-kW-brs.

Annual maintenance and inspections were completed'as.of. Sept' ember 1992. There were no unusual' findings.and measurements from all -

annually checked parameters were within normal ranges.

There were 5 unscheduled scrams'during the year. Of these, 3 were due to - electronic - noise in-the neutron measuring channels; _one resulted from moving the start-up source in proximity of a. neutron detector while sub-critical, one resulted from an operator trainee range switching error.

As of Decemberithere are -2 'SRos and 3 L Ros at the ~ facility.

~

In April, 'Mr. .. E.- Preble received-~an RO license. There are 4 students-in_ training.for'an RO exam scheduled in Aprilfl993.-

ARGO1 O 9302100027 921231-Ml I

PDR R:

ADOCK 05000134 PDR

@/4 -

D t- a

8 .

i I

l Page 2 i

Effluent releases have been well within 10CFR 20 limits. Gaseous Ar-41 has been released in trace amounts, measurable only when in operation above i kW.

The WPI Reactor continues to be used primarily for academic instruction, student projects, and occasional research.

Please contact me if further information is required.

l sincerely,

/

f~ T)I/fV 7 ,hg/(

Leo M. Bo ek, Director l