Informs Licensee of Reactor & Senior Reactor Operator Licensing Exam Scheduled for Wk of 930524
ML20128D009
Person / Time
Site: Beaver Valley
Issue date: 02/01/1993
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sieber J
DUQUESNE LIGHT CO.
References
NUDOCS 9302100020
Download: ML20128D009 (3)


Text

c5 FEB 1 1933 Docket No. 50-412 Mr. J. D. Sieber Senior Vice President Chief Nuclear Officer Duquesne Ught Company Post Office Box 4 Shippir.gport, Pennsylvania 15077

Dear Mr. Sieber:

SUIUECT:

REACTOR AND SENIOR REAUiOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation between Mr. T. Burns and Mr. D. Silk, anangements were made for the administration of licensing examinetions at Deaver Valley Unit 2.

T:ie written examinations and operating tests are scheduled for the week of May 24,1993. Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in NUREG-1021, ' Operator Licensing Examiner Standards,' (ES-201, Attachment 4) prior to the week of May 24,1993.

The use of Revision 7 'o NUREG-1021 (Rev. 7) for these examinations has been discussed with your staff. Pk wknowledge that Duquesne Ligut Company agrees to conduct these examinations in acc(

ce with Rev. 7 by letter prior to the initiation of the examination TCVicW.

l To prepare the examinations and meet the above schniule, it will be necessary for your staff to furnish the reference materials identified in Attachment 2 of ES 201 by March 22,1993.

Any delay in receiving approved and indexed reference material or the submittal of inadequate or incomplete reference material may result in the examination being rescheduled.

The NRC will prepare and administer the written examinations in accordance with ES-401 and ES-402 of NUREG 1021. In order to conduct the requested examinations, it will bc necessary for your staff to provide adequate space and accommodations on the date noted above. The NRC's guidelines for administering the written examinations are described in ES-402, Attachmen'.1.

The NRC will prepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021. In order to conduct the requested operating tests, it will be

~ mary for your staff to make the simulation facility available on the dates noted above.

OFFICIAL RECORD COPY G:BV252493 l

9302100020 933201 l

+-

l F~ 'i 0

s DR ADOCK 05000412 PDR

Mr. J. D. Sieber 2

FEB 1 1933 Your staff should retala the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are nnal.

ES-402, Attachment 2, and ES 302, Attachment 1, contain a number of NRC poli:ics and guidelines that will be in effcet while the written examination and operating tests are being administered.

Your staff should submit preliminary senior reactor operator license applications and waiver requests at least 30 days before the nrst exarnination date so that the NRC wi'l be able to review the applications and the medical certifications and evaluate any requested waivers, if the applications are not received at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying that all training has beer completed should be submitted at least 14 days before the first examination date.

This request is covered by Office of Management and Budget Clearance Number 3150-0101 which expires October 31,1995. The estimated averagc burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, includes gaihering, xeroxing, and mailing the required material. Send comments about this burden estimate or any other aspect of this collection of information, including suagestions for reducing this burden, to the Records and Rep 1s Management Branch, MNih7714, Division of Information Support Services Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Wahington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Ofnce of Information and Regulatory Affairs, NEOB-3019, Office of Management and Budget, Washington, D.C. 20503.

Thank you for your consideration in this mattw. Mr. Burns has been advised of the NRC guidelines and policies addressed in this letter. If you have any questions on the evaluation process, please contact me at (215) 337 5211.

Sincerely, Nh'hq/ gyg e*

seu f h D$s%Qg O

Glenn W. Meyer, Chief PWR Section Operations Branch Division of Reactor Safety OFFICIAL RECORD COPY G:BV252493

Mr. J. D. Sicher 3

Ir0 ih9 cc:

G. S. Thomas, Vice Presidem, Nuclear Services N. R. Tonet, Manager, Nuclear Safety T. P. Noonan, General Manager, Nuclear Operations K. D. Grada, Manager Quality Service Unit H. R. Caldwc!!, General Superintendent, Nuclear Operations i

T. W. Bums. Director, Nuclear Training j

Public Document Room (PDR) local Public Document Room (LPDR)

Nuclear Safe,y Information Center (NSIC)

NRC Resident inspector Commonwealth of Pennsylvania State of Ohio bec:

Region I Docket Room (with concurrences)