ML20128C992
| ML20128C992 | |
| Person / Time | |
|---|---|
| Site: | 07001100 |
| Issue date: | 05/16/1985 |
| From: | Lichtenberger ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
| To: | Crowe W NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| 25333, NUDOCS 8507030731 | |
| Download: ML20128C992 (3) | |
Text
{{#Wiki_filter:-- -
- ae.&hjer I
r, ('occ-{ ' y f -A .nM 4)Ng ,10-ll00 conneusnom mussuunnsmo m ~ License SNM-1067 'e s Docket 70-1100 \\ 1 May 16, 1985 / [i, N t s t r-l'g% / -3 U. S. Nuclear Regulatory Commission ~ 3' Washington, DC 20555 t 9. g c % %:Y @ \\ Y Attention: Mr. W. T. Crowe, Acting Chief Uranium Fuel Licensing Branch g Division of Fuel Cycle & Material Safety, NMSS 'A
Subject:
SNM-1067
Dear Mr. Crowe:
The following page change has been made to the subject license to reflect the addition of a new FA-3 air filtration system for the pellet grinding / rod loading area in the Building 17 pellet shop. The new FA-3 system will replace the existing FA-3 system which has been in position since Building 17 was constructed in 1968. The new system will meet all existing license requirements as well as the requirements of 10 CFR 20, Appendix B, for air being discharged to an unrestricted area. Please note that we intend to install this system during our annual vacation shutdown which is scheduled to occur in the period July 29 - August 11, 1985. Delete Page Add Page 1.3-5, Rev. 2, Dated April 6, 1982 1.3-5, Rev. 3, Dated May 16, 1985 This amendment is considered to be an administrative t:me change and the license fee, as required by 10 CFR 170.31, has been sent directly to the license fee management branch under separate cover. Very truly yours, a ol th 8 W G ED H. V. Lichtenberger 2 J[Jg 19 [
- 7) h h
Vice President, Nuclear Fuel L. O [ y O O M Nuclear Power Systems 44 g3 cocyllrm 2 y O f#f 2' o Ap plica at....................
- p 3, M HVL/RES/ sac 1 C h:ch..o..Q.3 5.M.
V i"5 c,
- ma m.c Fa COU;,
- ;rJ.[, G dd.
h Enclosure ~ hk -. Y. J..Sf Y 1/. . k...... .c... _. Su /tt.~ 8 Power Systems 1000 Prospect Hill Road (203) 688-1911 Combustion Engineenng, Inc. Post Office Box 500 Telex: 99297 8507030731 850516 PDR ADOCK 07001100 C PDR
k " 0- /)V g C2. 5.3 <5 3 // s .e...- ,,. - } 9.- L, 6 .m ,n;>..- / { 5,, r/>' gx, _(p(. 7. 9:D g,, g3. u- ,,r,?a ~ -/ ....a / 1., (..
- d" '
.g,\\y ' ~ ' ,,,,e 2., s', A s,' s* .s e ,c' p / %,,.< r " - g.J( js,/ y- ~ w.. / / ./ / ./ ,s' / /.-n... en h*
,. ~ w 3.2.3 Ventilation Requirements Nuclear Fuel Manufacturing Ventilation in the Manuf acturing facility (Building #17) is provided by four separate exhaust systems as described herein: FA-1 Powder Preparation and Pressing - This system has a capacity of 12,100 CFM and incorporates prefilters and a double bank of 12 absolute filters, each 99.97% efficient at 0.3 microns. The air exhaust f rom this system which is either returned to the unclad fuel area or released from the plant is sampled 100% of the time and analyzed each day. FA-2 Furnace H2 Burnoff - This system has a capacity of 1340 CFM and incorporates prefilters and a single bank of 4 absolute fil ters, each 99.97% ef ficient at 0.3 microns. The air exhaust from this system. is released from the plant and sampled 100% of the time and analyzed each day. FA-3 Pellet Grinding and Rod Loading - This system has a capacity of 17,500 CFM and incorporates prefilters and a double bank of 16 absolute filters, each 99.97% efficient at 0.3 microns. The air exhaust from this system is released from the plant and sampled 100% of the time and 3 analyzed each day. FA-4 Recycle Powder' Area - This system has a capacity of 6000 [ CFM and incorporates prefilters and a double bank of 6 absolute filters, each 99.97% efficient at 0.3 microns. The air exhaust f rom this system is released f rom the plant and sampled 100% of the time and analyzed each License No. SNM-1067, Docket 70-1100 Rev.3 Date: 5/16/85 Page: I.3-5}}