ML20128C955
| ML20128C955 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 11/20/1992 |
| From: | Doerflein L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 9212070077 | |
| Download: ML20128C955 (4) | |
Text
..
Il0V 2 0 19p r,
U.S. NUCLEAR REGULATORY COMMISSION REGION I No. 92172 NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:
Northeast Nuclear Energy Company Facility:
Millstone Nuclear Power Station, Unit 1 Docket No:
50-245 Time and Date; 10:00 a.m., December 3,1992 location:
Main Conference Room Region I, King of Prussia, PA Purpore:
Discussion of Licensed Operator Weaknesses During the 1992 Requalification Examination NRC Attendecs:
W.11odges, Director, Division of Reactor Safety (L)RS)
L. Bettenhausen, Chief, Operations Branch, DRS L. Doerflein, Chief, Reactor Projects Section 4A, Division of Reactor Projects (DRP)
R. Conte, Chief, Boiling Water Reactor Section (llWR), DRS D. Florek, Sr. Operations Engineer, DRS J. Williams, Sr. Operations Engineer, DRS J. Munro, Sr. Operations Engineer, NRR Licensee Attendees: W. Romberg, Vice President, Nuclear Operations Services S. Scace, Station Director
- 11. Ilaynes, Nuclear Unit Director.
M. Black, Director Nuclear Training P. Przekop, Manager Operations Unit 1 M. Brown, Project Manager Unit 1 Operator Training B. Ruth, Manager Operator Training R. Heidecker, Supervisor Unit 1 Operator Training M. Jensen, Assistant Superv,sor Unit 1 Operator Training M. Ross, Operations Assistant Note: This meeting is open to the public for observation only. Handicapped persons requiring assistance to attend or participate in the meeting should make their requests known to Larry -
Doerflein, Chief, Reactor Projects Section 4A, U.S. Nuclear Regulatory Commission Region 1, 475 Allendale Road, King cf Prussia.-PA,19406, Phone (215) 337-5378, no later than two business days prior to the meeting.
n 0@d Sbed W.
Prepared by:
L, T. Doerflein, Chief, RPS 4A pf MRE55!!P aFFICIAL RECORD COPY f
1
-~ ---
~.
HOV " 0 pn 3
Meeting No. 92172 2
i DISTRIBtITION (VI;i F Mall)
J. Taylor, Executive Director for Operations J. Snlezck, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)
H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)
C. Rossi, Director, Reactor inspection and Licensee Performance, NRR II. Grimes, Director, Division of Operating Reactor Support, NRR J.1.ieberman, Director, Office of Enforcement J. Goldberg, Office of General Counsel (OGC)
T. Murley, Director, Office of Nuclear Reactor Regulation W. Russell, Associate Director for inspection and Technical Assessment, NRR J. Partlow, Associate Director for Projects, NRR S. Varga, Director, Division of Reactor Projects I/11, NRR J. Calvo, Assistant Director for Region i Reactors, NRR S. Ilajwa, RPEB, NRR V. McCree, Regional Coordinator, OEDO N. Green, Jr., Policy Development and Technical Support Dranch J, Stolz, Director, Project Directorate 1-4, NRR D. Jaffe, NRR Project Manager, PD l 4, NRR P. Swetland, NRC Resident inspector T. Martin, Regional Administrator W. Kane, Deputy Regional Administrator Region l_llranch Chiefs Region I Section Chiefs K. Abraham, Public Affairs Of0cer, RI D. Serenci, Field Public Affairs Officer, RI M. Banerjee, State Liaison Of0cer, RI J. McGrath, State Agreements Of0cer, RI K. Smith, Regional Attorney, RI D. Hokx!y, Enforcement Of0cer, RI
- B. letts, Office of Investigations, RI Field Of0ce J.1.anning, DRP, R1 J. Douglas, DRM A, R1 t
OFFICIAL I1ECORD COPY
,q.
e..
-.,.,-...r.
,m..-
4...
_,,m.,-
m v
Il0V ': D 193g Meeting No. 92172 3
l Distribution:
Public Document Room (PDR) local Public Document Room (LPDR)
State of Connecticut Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DRSS Division Secretary, R1 DRMA Division Secretary, R1 Projects Branch No.1 Secretary, R1 Re;; ion 1 Receptionist i
t i:
0FFICIAL RECORD COPY y
--+.
,rw
.y,,,-...i--,. -
.,,w.-,,re-e.,,+
.,,..,<.r n
,w ww-cw-w-w-o-.
wnw+-
re ew-r-
r*-e w
f.
1mv o 0 },m
> ~
s Meeting No.92-172 4
('-
( cd kgi:DRP RI'ORP I
Doerficin Illough
-40 /92
-10/-/9P II b fy,Q s
e I
f a
O p uf'% $ [veve n' -
4 4
4 pi
( *y
+*+
"*'tmy
- -ce n w m t-2-t--9-'7 4 -?
M+^
vy T
-.s yv 7---=s ae s-9 mW -4
-- r err T-e-n--*r-e-u- - -
r
-pbste
- -~--
ee--
we vm w-w'=
e' a'w
&