ML20128C777

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Er Procedures,Including Rev 5 to ERP-130,Rev 2 to ERP-205,Rev 2 to ERP-120,Rev 10 to ERP-101 & Rev 8 to ERP-140,reflecting Revs 84,85 & 86 to EPIPs Er Procedures Index.W/921124 Release Memo
ML20128C777
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/17/1992
From: Beck G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20128C780 List:
References
NUDOCS 9212040528
Download: ML20128C777 (3)


Text

___

l 4

Pillt.ADEl.I'lilA El.1,CCTRIC COMi%gp CFR Appondix E Section V NUCLEAR GROUP llEADQUARTERS 955 65 CilESTERBROOK BLVD.

WAYNE, PA 19087 5691 l

als) 640 K m September 17, 1992 Dockets Nos. 50-277 50-278 NUCLLAR 51'RVICl3 Di.fAirIMI.NT License Nos. DPR-44 DPR-56 U.

S.

Nuclear Hegulatory Commission ATTN Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 Emergency Plan Implementing Procedures Dear Si Enclosed are revisions 84, 85, and 86 to the Emergency Response Procedures for Peach Bottom Atomic Power Station, Units 2 and 3.

These procedures are being submitted in accordance with i

10 CFR - Appendix E, and 10 CFR 50.4.

The following procedures are enclosed.

REVISION 84 ERP-130 Rev.

5

" Site Evacuation" ERP-205 Rev.

2

" Emergency Preparedness Coordinator /TSC" ERP-206 Rev.

O

" Support Services Group" ERP-250 Rev. 11

" Technical Support Center (TSC) Activation" 1

ERP-700 Rev.

6

" Technical Support Team Leader (TSTL)"

ERP-710 Rev.

6

" Technical Support Group" REVISION 85 ERP-120 Rev.

2

" Partial Plant Evacuation" DELETEJ,V a b'i 1

9212040528 920917 e,

/'

PDR ADOCK 0500 7

4gy1 jy

7 U. S. Nuclear Regulatory Comminolon September 17, 1992 PBAPS Units 2 and 3 Page 2~

Emergency Plan Implementing Procedures REVISION 86 ERP-101 Rev. 10

" Classification of Emergencies" k

14)

Rev.

8

" Emergency Response Organization Call Out" i

ERP-140 App. 1 Rev. 17

" Emergency Director (ED)

(Contact 2)"

DELETED ERP-140 App. 2 Rev. 20

" Technical Support Team 1eader (TSTL)" DELETED ERP-140 App. 3 Rev. 22

" Dose Assessment Team Leader (DATL)" DELETED ERP-140 Apr. 4 Rev. 15

" Chemistry Sampling &

Analysis Team Leader (CSATL)" DELETED-ERP-140 App. 5 Rev. 14

" Damage Repair Team Leader (DRTL)" DELETED ERP-140 App. 6 Rev. 13

" Security Team Leader (STL)" DELETED ERP-140 App. 7 Rev. 17

" Personnel Safety Team Leader (PSTL)" DELETED ERP-140 App. 8 Rev.

9

" Company.Jnsultants and C

Contractors" DELETED ERP-140 App. 9 Rev. 11

" Nearby Public and Industrial Users of Downstream Water" DELETED In accordance with 10 CFR 2.790(a)(6), we request that-names and telephone numbers contained in the following procedures be withheld from public disclosure since such disclosure would constitute an unwarranted invasion of the personal privacy of the individuals involved:

Revision 84 - ERP-206: Revision 86 - ERP-140; ERP-140 App. 1; ERP-140 App. 2; ERP-140 App.3; ERP-140 App.4; ERP-140 App.5; ERP-140 App.6; ERP-140 App.7; ERP-140 App. 8; ERP-140 App.9.

Please note that Revision 84 and 85 are not being submitted within the required 30 days.

We apologize for this error and regret any inconvenience it may have caused you.

i U.

S. Nucloor Hogulatory Commission Septembsr 17, 1992 i

PDAPS Units 2 and 3 Page 3 Emergency Plan Implomonting Procedures If you have any questions or require additional information, i

pleasu contact us.

i Sincoroly, G. J. Bock Manager I.iconsing Section-Enclosure cca T. T. Martin, Administrator, Region I, USNRC (2 copios)

J. J. Lyash, USNRC Senior Resident Inspector, PBAPS F

\\

l

.. ~.

- - _- - - - _