ML20128C692

From kanterella
Jump to navigation Jump to search
Forwards Reactor Containment Bldg Integrated Leakage Test, Types A,B & C Periodic Test
ML20128C692
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/28/1993
From: Feigenbaum T
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20128C696 List:
References
NYN-93012, NUDOCS 9302040092
Download: ML20128C692 (1)


Text

.

.e

Odli Sea'droN.7so3874 y

Telephone (603)474-9521

=

a~,

j$

[C Facsimile (603)474 2987 Energy Service Corporation Ted C. Felgenbaum Senior Vice President and Chiel Nuctoar Officer NYN 93012 January 28, 1993 United States Nuclear Regulatory Commission Washington, D.C.

20555 Attention:

Document Control Desk

References:

(a)

Facility Operating License No. NPF 86, Docket No. 50 443 (b) 10 CFR 50, Appendix J, Section V.B.

Subject:

Reactor Containment Building Integrated Leak Rate Test Gentlemen:

Enclosed please find the report on the Reactor Containment Building Integrated Leak Rate Test conducMd at Seabrook Station and successfully completed on October 30, 1992.

This report is submitted in accordance with the requirements of 10 CFR 50, Appendix J, Section V.B.

If you should have any questions regarding the above, please contact Mr. James M.

Peschel, Regulatory Compliance Manager, at (603) 474-9521, extension 3772, y-Very truly'yours,

/

M& Q Mf Ted C. Feigenbauu/

TCF:J ES/jes Enclosure cc:

Mr. Thomas T. Martin Mr. Noel Dudley Regional Administrator NRC Senior Resident inspector U.S. Nuclear Regulatory Commission P.0, Box 1149 Region 1 Seabrook, NH 03874 475 Allendalc Road King of Prussia, PA 19406 Mr. Albert W. De Agazio, St. Project Manager Project Directorate 1-3 Division of Reactor Projects U.S. Nuclear Regulatory Commission DC 20555 I

Was ingtpn, l O

>SUd I

a member of the Northeast Utilities system ll 9302040092 930128

\\

hDR ADOCK 05000443 PDR

_