ML20128C635

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1977 for Monticello Nuclear Generating Plant
ML20128C635
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/31/1977
From: Mayer L, Shamla W
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
NUDOCS 9212040494
Download: ML20128C635 (4)


Text

._.-..

. =.

/W/t Ts~G.

~

a

..s

.e a.

NSED NORTHERN 5 TATE 5 POWER COMPANY MIN N E A PObt S. MIN N E S OY A 55400 January 6,1978 e,.r %;,

Director, Office of Management

'l n

Information & Program Control

.n g

6j ('[( @.g[

c/o Distribution Services Branch, DDC, ADM

3 U S Nucicar Pegulatory Comission Washington, DC 20555

Dear Sir:

N FONIICEL1h NUCLEAR GENERATING PIRIT Docket No. 50-263 License No. DPR-22 Monthly Operating Report December 1977 Attached are two copies of tne Monthly Operating Report for December, 1977 fpr the Monticello Nuclear Generating Plant.

Yours very truly, d0Jyv L 0 Mayer, PE Manager of Nuclear Support Services l

IDM/ak cc: Director, IE, III, USNRC (1)

( Director, IE, USNRC (c/o DSB)

(10)

MPCA Attn: J W Feman l

i 780120074 9212040494 771231 PDR ADOCK 05000263 R

PDR

t.

20.%

Rev. i

)

8/13/76 OPi MTING M1A IERRT l

l 10CLET No.

50 263 j

UNIT 1

)

DATE 1/4/78

]

COMPLETED BY W. A. Shamla

}

TEl.EPliONE 612/295-5151, Ext.111 1

i OPERATIVi SIA111S 1.

ficporting Period:

December Gross llours in Repor t Perlikl:

744 l

2.

Currently Authori:ed Power f.evel (SMt):

1670 Stax, Depend. Capacity (We-NUT):

536 Design 1le.:trical Hating (We-Net):

545.4 3

j 3.

Power f.evel to Which Rostricted (if any) (Wo Net):

N/A

)

4.

Reasons for Restriction (if any):

N/A i

Till? h 0 M111 s

YR 10 DATli ClMJ1ATIVE 5.

Number of linuri Renter Wn : frit h at 717.6 7092.0 45,168.4 6.

Reac tor Reserve Shu t i s.n l'.u rs................,, _* 0A,,

0.0 940.7 7.

Ilours Generat or oit laer........

... _709. 0_

7002.2 43,777.4-8.

Unit Reserv.: Shutdoet'wn 0.0 0.0 0.0 3

9.

Gross Thenul 1:ncrge I:." <, ate l Utn'Il.

1, g119,,288 10 991,8,99.2 73, 654574.6 4

t 10.

Gross EINt ri. al Fnerr.y Gcn"c't r.' i " l )

..,383,460 3,728,270

,, 2_2,372,690 l

1,t.

Net r.lec t ri.:a1 E.et gv Cenet e'..'

f.' ft:t-)

........,_36,d54

,3,568,902 21,37,6,374 9

i 12.

Reactor Servit.e Faeter...,

%.5%

81.0%

79.2%

l 13.

Ren*:tr 'vaihM 13 ty fvtr.'

'96.5%

81.0%

.. 80.9}

l 14.

Unit v rvtce I-actor 95.3%

79.9%

76.8%

l 15.

Unit wa!1 ability Factet 95.3%

79.9%

76.8%

l

16. Unit Capacity factx D.c).e' M. ' )

92.6%-

76.0%

69.9%

l 17, Unit CapacIt. ra..w (Uini

  • at.e't 91.0%

74.7%

68.7%

l

18. thi; t Terced 'htage ?n '

.,,,0,0%-

0.5%

8.0%

19.

Sht:tdowns Sch. 'ulei wr.'.. < t

' te rid Juntion of Each):

s

20. -If Shutdo n it.inJ ct aern t cor;-

N tu nt-1 l' s d Stortim t N/A f

i l

l.

l u

d 2025 Rw. 0 3/3/76 r

AVERAGE DAILY UNIT I%H LLVEL DCrKET N0.

50-263 UNIT

_1 DATE 1/4/78 C04PLLTED BY TELEPlONE 612/295-5151, Ext. 111 MONIH December DAY AVERAGE DAILY POhD LEVEL DAY AVERAGE IAILY IM'FR LEVEL (htde Net)

(Mh'e-Net) 1 550 17 155 2

555 18 364 3

552 19 461 4

514 20 406 5

553._

21 507 o

553 22 548 i

7 556 23 553 8

549, 24 551 9

5_5) 25 531 10

_ _ 554 26 552 11 532 27 552 12 552 28 555 13 551 29 551 14 554 30 552 15 336 31 537 16

-5

2027 Rev. 0 I

3/3/76 IFfKET NO.

50-263 UNIT NAME ibaticello UNIT SUfD0!OIS AND IUAER REDUCTIONS DATE Januarv 4.1978

'7F.!PLET8 BY J. A. Shamla l

CIGT ?-RNIll Decenber TELEI'IONE 612/295-5151 i.xt. 1il l

I I

I

' '! Ell 10D OF

    • .E,'

l S!!LTITDE DOtG i

F: FORUD DURATICN T1IE REACIM OR NO., DATE l S: SCIIEDULED (IICURS)

. REASON (1)

REDICING POhTR (2)

CORRFCTIVE ACTIONS /CGf TEATS 7

771215 S

35 B

1 Unit Outage taken to repair special instrumentation in suppression chamber in preparatior for reactor safety / relief valve actuation test.

i f

i

(

(1) REASON (2) Em A: Equipaent Failure (Explain) 1: Pianual B: Maint. or Test 2: Atanual Scram C: Refueling 3: Auteraatic Scram 4: Other (Explain)

D: Regulatory Restriction a

E: Operator Training and License Examination SUWARY: The unit was base loaded F: Mministrative during the entire month except G: Ogrational Frror ti xplain) for weekend redtctions for surveill.

Other (Expl:iin) ance testing and the outage described above