| Site: | Monticello |
| Issue date: | 04/30/1978 |
| From: | Mayer L, Myrabo A NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION (ADM) |
| References | |
| NUDOCS 9212040479 | |
| Download: ML20128C590 (5) | |
Text
E3OLAT05., DDCKET F.i CO?Y
, c NSRs PD NORTHERH STATES POWER COMPANY
-, ~ ~....... _, ~ ~.........,
h f
m May 9, 1978 k
Director, Office of Management Og Information & Program Control
- .g~y.
,rg ;
g c::y c/o Distribution Services Branch, DDC, ADM U S Nuclear Regulatory Cor:rnission y
5'8 y
C Washington, DC 20555 g
V w
Dear Sir:
MONTICELLO NUCLEAR GENERATING PIANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report April 1978 Attached are two copies of the Monthly Operating Report for April, 1978 for the Monticello Nuclear Generating Plant.
Yours very truly, L 0 Mayer, PE Manager of Nuclear Support Services LOM/ak cc: Director, IE-III, USNRC (1)
Director, IE, USNRC (c/o DSB) (10)
MPCA Attn: J W Ferman 1
l 9
o 781310039 1 ngh 9212040479 780430
-I PDR ADOCK 05000263 R
NARRATIVE SlMMRY OF OPERATING EXPERIENG DOCKET NO.
50-263 (NIT Fbnticello DATE 5/2/78 C0hPLETED BY A. L. htvrabo TELEPHONE 612/295-5151 hDNIll April 4/1/78 to Operated at essentially 100% of rated power.
4/24/78 4/25/78 Orderly shutdown to upgrade low voltage safety-related to interior drywell penetration splices, and perform rod se-4/27/78 quence exchange.
4/28/78 to Increasing to 100% power.
4/30/78
'l 4
t 4
4 OPERATING DATA REPORT DOCKET No.
50-263__
i DATE 05/02/78 COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 OPERATING STATUS
- Notes 1
- l. Unit Name
_Monticello I
April
- 2. Reportino Period's
- 3. Licensed Thermal Power (Mdt):
1670 4
Nameplate Rating (Gross MWe):
569
- 5. Design Electrical Rating (Net MWe):
_545.4 i
- 6. Maximum Dependable Capacity (Gross MNe): __564
- 7. Maximum Dependeble Capacity (Net MWe):
_536
__l
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reesons: -
9 Power Level To Which Restricted. If Any (Net MWe): __N/A_
- 10. Reasons For Restrictions; If Anv
__N/A i
i This Month Yr.-to-Date' Cumulative 4
~
II. Hours In Reporting Period 719 2879 59904
- 12. Number Of Hours Reactor Was Critical
___ 673.4
_ _ f805.6 47974.0
' O.0 0.0 940.7
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 657.5 2775.8 46553.2
- 15. Unit Reserve Shutdown Hours 0.0 0.0
__0.0
- 16. Gross. Thermal Energy Generated (MWH)
_1048937
__4484379
__78138953
- 17. Gross Electrical Energy Generated (MWH) __357520
__l533930
__23906620
- 18. Net Electrical Energy Generated (MnH)
_344154
__1477948
_22854322
- 19. Unit Service Factor
_ 91.6%
___. 96.5%
___ 77.7%
- 20. Unit Availability Factor
__ 91.6%
96.5%
.77.7%
- 21. Unit Capacity Factor (Using MDC_ Net)
__ 89.3%
_ _ 95.8%
___ 71.2%
- 22. Unit Capacity Factor (Usina DER Net)
._ 87.8%
___ 94.1%
___ 7J.0%
- 23. Unit Forced Outage Rate 0.0%
_0.4%
___7.6%
24 Shutdowns Scheduled Over Next 12 Months (fype, Date, and Duration of Each)
Refuelino Outage, October 16, 1978. 40 days
- 25. If -Shut Down At End Of Report Period. Estimated Date of Startup __N/A_
- 26. Units In Test Status (Prior to Comercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
d 1
4, 1
i i
AVERAGE DAILY UNIT PonER LEVEL i
i DOCKET NO.-
50-263__
j UNIT Monticello__
DATE 05-02-78 l
COMPLETED BY A. L. Myrabo
~
TELEPHONE 612/295-bl51 i
l MONTH
__ APRIL DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PohER LEVEL 4
(MAe-Net)
(MWe-Net) 1 518_____
17
__551_
2 547_____
18 551 3
549_ _
19
__550_
l 4
550 20 548____
5 547 21 550__
f 6
-_551__
22 496 j
7 555 23 547 i
8
__________546__
24
_ _ _550_
i 9
526 25-
- 399_
-4_
10 550_____
26-
-27
-5_
i1 549 12
__551__
28 116 i
I3 549____
29 354 14 548
_30 422_
15 528 31 16 551 I
i INSTRUCTIONS l
On this format. list the average-dsilv unit power level in Mde-Net for each I
day in the reportino month.
Compute to the nearest whole meaawatt.
_ _ _ _ _ _. _ __ _. ~._.
L '..
l N
DOCKET NO.
50-263 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Mnntite11n y
DATE 5/2/78 f
COMPLETED BY-AL nernhn TELEPHONE 612/29$-5151 REPORT MONTH APRIL t
~k 3g 3
Yk Licensee.
j r, h%
Cause & Corrective I
No.
Date 3
3g
(
jj5 Event E'
5' Action to
$~
5 5 ;j, =t Report :
'N V 5'
Prevent Recurrence u
5 1'
780425 S
60.5 11
'l N/A SA Penetr Upgraded low voltage safety-related interior drywell penetration splices.
?
i I
5 I
i 1
2 3
4 I
F: Forced Reason:
Method:
Ex1ubit G-Instructions for Preparation of Data S: Scheduled A. Equipment Failure (Explain) 1-Manual Entry Sheets for txensee B Maintenance of Test -
2-Manual Seram.
C. Refueling 3-Automatic Scram.
Event Report (LER) File tNOREG.
D Regulatory Restriction 4-Other (E xplain) 0161) 4 E Operator Training & License Examination 5
F-Administrative Exhibit I - Same Sauru G-Operational Estor (Esplain t (9/77) llother (Explain) f f
4 r