Text
(
m4 0;gg
=.
OPER ATING DA'l A REPORF HEVISION I DOCKEf NO.
S0-263____ _
DAfii S-3-/8-COMPLETED Bf A. L.
Myrabo TELEPHONii 612/293-9151 OPERATidG STATUS l Notes i
1.
Unit Name :
_____Monticello l
l
- 2. Reporting ner101:
APRIL l
- 3. Licensed Thermal Power (MWt):
__1670 l
l 4
Nameplate Rating (Gross MWe): _ _ _ _ _ ___S69 l
l S. Desian Electrical HatinJ (Nat MWe): __
d4S.4 l
l 6.
Max imum Depe-ndabl e Capac i ty (Gross MWe): __S64 l
l
/. Maximum Dependable Canacity (Net MWe):
____S36 l
_________l 8.
If Chanjes Occur in Capacity Ratinos ( i tems Numbar 3 Throuoh /) Since Last Report. Give Reasons
__ u / A __
=-
- _ = =
9 Fower Level To Which Hestricted. If Any (Net Mhe):
___W/A_
- 10. Reasons For Restrictions, if Anyt _ N/A_____--
This Month Yr.-to-Date Cumulative i1 Hours in Reportino Perlod
= - -
719 28/9
____ S9904
- 12. Number Of Hours Reactor has Critical
___673.4
__2805.6
__ 4/974.0
- 13. Reactor Reserve Shutdown Hours
___ _0. 0 0.0 940.7 14 Hours Generator On-Line
_ _6S7.5
___2775.8
__ 46553.2 IS. Unit Reserve Shutdown Hours
_0. 0 0.0 0.0
- 16. Gross Thermal Eneroy Generated (MnH)
_1048937
_ 44843/9
_ 78138953
- 17. Gross Electrical Energv Generated (MWH) __357520
_IS33930
__23906620 l
- 18. Net Electrical Eneray Generated (MWH)
__344154
_I477944
__228S4322 l
- 19. Unit Service Factor
_ v i. 4% 3
(__ v 6. 4 C 77.7%
l
- 20. Unit Availaollity factor
__ 91. 4%_j
(__ 96.4%;
_ __.7/.7%
l
- 21. Unit Capacity Factor (Usina MDC Net)
__. 69.J%
___ va.e4 71.2%
- 22. Unit Caoacity Fac tor (Usino DER Net)
__ 87.8%
94.I%
70.0%
- 23. Unit Forced Outage Rate 24 Shutdowns. Scheduled Ocar Next 12 Months _
0.0%
0.4%
/.6%
(Type. Date, and Duration of Each)
Refueling Outace. October 16 1978, 40 days _-_
_ ~ _
= - - -
- 25. I f Shut Down At End Of Report Period. Estimated Date of Startup: _N/A_
- 26. Units in Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9212040475 780517 PDR ADOCK 05000263 R