ML20128C566
| ML20128C566 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 05/31/1978 |
| From: | Mayer L, Myrabo A NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION (ADM) |
| References | |
| NUDOCS 9212040471 | |
| Download: ML20128C566 (5) | |
Text
F-5.II@?ff.
~...
MINN E APO LI S. MIN N E SCTA 5540%
.e Ej n
La)
E-'
k
- a C
~N j,T T June 13,19 78
.y;
- y;
."39
- f
.a N
N
'Se Director, Of fice of Management C
Information & Program Control c/o Distribution Services Branch, DDC, ADM U S Nuclear Regulatory Commission Washington, DC 20555 Dear Sir HONTICELID NUCLEAR GENERATING PLANT Do cke t No. 50-26 3 License No. DPR-22 Monthly Operating Report May 1978 Attached are two copies of the Monthly Operating Report f o r May,
1978 for the Monticello Nuclear Generating Plant.
Yours very truly, L 0 Mayer, PE Manager of Nuclear Support Services LOM/deh cc Director, IE-III, USNRC (1)
Director, IE, USNRC (c/o DSB) (10)
MPCA Atta: J W Ferman
$#g$
781720177 9212040471 780531 ADOCK0500g3 4;
DR j
OPERATING DATA REPORT DOCKET No.
50-263_____
DATE 6-8-78____
COMPLETED BY A.
L. Myrabo TELEPHONE 612/295-bl5I OPERAflNG SfAf0S
! Notes 1.
Unit dama
-_____Monticello l
l 2.
Hanorting oariods
____________MAY
- 3. Licansad Tharnal Power (Mnt):
1670 4
hamaolate Ratin) (Gross MWe):
__560 i
l 5.
Desian Electrical Hating (Net MWe):
u45.4 i
l
- 6. Maxi.aum Dependable Capacity (Gross MWe): __564 l
l
- 7. Max 1 num Denendanla Capacity (Net MMe):
536 i ___ __
- 8. If Changas :)ccur in Capacity Ratinos (!tems Number 3 Throuch 1) Since Last Renort. Giva Heasons
__ N / A _ ___.
- 9. eower Level fo nhich Hestricted, if Any (Net Mne):
___N/A
- 10. Reasons For Restrictions. If Any
__N/A This Month Yr.-to-Date Cumulative
- 11. Hours In Renorting Pariod
- 744 3623 60648 I2. Number Of Hours Heactor has Critical
___744.0
___3549.6
__ 4d/18.0 940.7 IJ. Reactor Heserve Shutdown Hours 0.0
______O.0
- 14. Hours Generator On-Line
___744.0
___3519.8
__ 4/297.2
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
/9311862 I6. Gross Thermal Energv Genarated (MWH)
_1172909
_ 5657286
___24305130
- 17. Gross Electrical Eneroy Generated (MAH) __398510
__1932440
- 16. het Electrical Energv Generated (MWH)
__382718
__1860666
__2423704c
- 19. Unit Service Factor
__100.0%
___ 97.2%
____ 78.0
- 20. Unit Availability Factor
__100.0%
___ 97.2%
____ 78.0a
- 21. Unit Caoacity Factor (Usino MDC ilet)
__ 96.0%
95.8%
____ 71.01
- 22. Unit Capacity Factor (Using DER Net)
__ 94.3%
___ 94.2%
____ I O. 3 2
- 23. Unit Forced Outaae Rate 0.0%
0.3%
7.9%
24 Shutdowns Scheduled Over Next 12 Months ( Tvoe. Date, and Duration of Each)
Hefuelina Catage. October 16 1978 40 davs_____
- 25. If Shut Down At End of Renort Pariod. Estimated Date Of Startup __N/A_______
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieve INITIAL CRITICALITY INITIAL ELECTHICITY
__=
COMMERCIAL OPERATION l
i
+
AVERA0E DAILY UNIT, POWER LEVEL DOCKET NO.
50-203_____
UNIT Mont i c e l lo__
DATE 6-8-78____
COMPLETED BY A. L. Myrabo TELEPHONE 612/293-5151 MON Tri ______M AY DAY AVERA0E DAILY POWER LEVEL DAY AVERA0E DAILY POWER LEVEL (Vde-Net)
(Mde-Net) i 1
_505__
17
___509 2
547_____
18 494___
3 549_____
19 485____
20 538_
4 548__
5
___552_
21 413______
6
__550____
22 512_
7 470___
23
___535_ _
8
_542__._________
24 468_
9 540 26 477__
10 516 26 534_____
ll 550_____
27
__531____
12 499_____
28 495___
13 549 29 448_
14 551 30 537_
15 515 482_______
31 16
_506__
IN STRUCTIOt4S On this format. list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole mecawatt.
a
i l
.i NARRATIVE SLMRRY OF OPERATING EXPERIENCE
+
4 DOCKET No. 50-263 4
I (NIT bbnticello 00bFIEIED BY A. L. Myrabo TElH HONE 612/295-5151 DATE June 8, 1978 j
bbnth May, 1978 i
i 5/1/78 Operated at 100% power except for power reductions on to fourteen days for load following..No safety related 5/31/78 maintenance performed. No significant operating pro-blems experienced.
I i
i i
i.
'i k
l i
l l'
i
~
9
_y
.m, y4.,
.._.3,,.
.wg<
w,,,,.&g.,
,y,.
.y.s. rN,.
- c. 9 y
-c
_ =.
-..~..-- ---.. ~ _. - _... -... -.. ~. - -.. -.....
.c DOCKET NO.
50-263 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME Monticello DATE Jt.ine 8. 1978 REPORT MONTH Mty COMPLETED BY A. L. Mvrabo i
TELEPHONE 61Z/Z95-5151 l
0 q
2
~
h licensee
,E%
h4 Cause do Correctrve No.
Date -
3 3g 3
jg5 Event s7 s.3 Attson to y5 3 5 :t Report :
EU 5O Prevent Recurrence
'u 6
i 1
i i
i 4
c t
1 E
i 2
3 4
j F: Forced Reasort Method:
Exhibit G-Instructions I
5: Sthed uled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee
. C Refueling.
3-Automatic Scram.
Event Report (LER) File (NUREG-,
D-Regulatory Restriction 4-Other (Explain) 0161) 4-EOperator Training & License Examination 9
i F-Administrative 5
G-Operational Error ( E xplain t
' Exhibit I.Same S.mrce es'77)
Il-Ot her (I" splain i i.
'?"