ML20128C415

From kanterella
Jump to navigation Jump to search
Discusses Safety Insp 50-293/92-28 on 921124-1231 & Forwards Notice of Violation.Good Precautionary Measures Taken During Storm on 921211-14,that Included Reduced Reactor Power Operations
Date released: 05/21/2020 Download: ML20128C415


Insp Rept 50-293/92-28 on 921124-1231.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Emergency Preparedness, Security,Safety Assessment & Quality Verification
ML20128C441
Person / Time
Site: Pilgrim
Issue date: 01/28/1993
From: Eugene Kelly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
Download: ML20128C441 (21)
Notice of Violation from Insp on 921124-1231.Violation Noted:Licensee Failed to Properly Implement Procedures 3.M.2-7.6 in That Technicians Established Incorrect RPS Protective Setpoints
ML20128C430
Person / Time
Site: Pilgrim
Issue date: 01/28/1993
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
Download: ML20128C430 (1)
Discusses Safety Insp 50-293/92-28 on 921124-1231 & Forwards Notice of Violation.Good Precautionary Measures Taken During Storm on 921211-14,that Included Reduced Reactor Power Operations
ML20128C412
Person / Time
Site: Pilgrim
Issue date: 01/28/1993
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: BOULETTE E T
BOSTON EDISON CO.
References
Download: ML20128C412 (3)