ML20128C394
| ML20128C394 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/26/1993 |
| From: | Hodges M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Debarba E NORTHEAST NUCLEAR ENERGY CO. |
| References | |
| NUDOCS 9302040006 | |
| Download: ML20128C394 (5) | |
Text
[
Y JAN 2 61993 Docket Nos.
50-245 50-336 50-423 Mr. Eric A. DeBarba Vice President - Engineering and Services Division Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06141-0270
Dear Mr,
DeBarba:
We t,ppreciate your decision to participate in the NRC Erosion / Corrosion Workshop to be held on February 9,1993, in Region I. Your talk, tentatively scheduled for '10:15 a.m. -
10:45 a.m., is intended to provide a utility perspective of how implementation of programs designed to monitar erosion / corrosion (EC) in carbon steel systems is proceeding, and give a common basis foi understanding program strengths and shortcomings to date.
Tae content of your presentation is up to you. Based on your experience with the.
implementation of the erosion / corrosion program at your facilities, we invite you to stimulate NRC and industry representatives to discuss productive and controversial topics during the workshop.
Enclosed with this letter is a copy of the revised schedule for the workshop on February 9,1993. The workshop location is the Valley Forge Sheraton Hotel Should you have any questions or comments in regard to the workshop, please ccutact me at (215) 337-5359 or Mr. A. I_chmeier at (215) 337-5089.
Sincerely, C;;9al 0Yned Oy:
f.;3rvin W. licdecs Marvin W. Hodges, D' or Division of Reactor Safety i
Enclosure:
As stated OFFICIAL RECORD COPY A:NNECEDB2.HGE 9302040006 930126 f
PDR ADOCK 0500o245 phd P
PDR Ig
JAN 2 61993 Mr. Eric A. DeBarba 2-cc w/o encl:
W. D. Romberg, Vice President Nuclear, Operations Services
-j S. E. Scace, Vice President, Millstone Station H. F. Haynes, Nuclear Unit Director, Millstone 1 J. S. Keenan, Nuclear Unit Director, Millstone 2 C. H. Clement, Nuclear Unit Director, Millstone 3 R. M. Kacich, Director, Nuclear Licensing D. O. Nordquist, Director of Quality Services Gerald Garfield, Esquire Nicholas Reynolds. Esquire Public Document Room (PDR) local Public Document Room (LPDR)
Nuclear Safety Infonnation Center (NSIC)
NRC Resident Inspector State of Connecticut SLO i
1 t
l 4
l-t l
.I OFFICIAL RECORD COPY -
l
- A:NNECEDd2.HGE -
1
+
k.
N -r.'-
JAN 2 619s3 T
Mr. Eric A.- DeBarba 3
bec w/o encl:
Region I Docket Room (with concurrences)
J. Joyner, DRSS R. Blough, DRP.
L. Doerflein, DRP W. Raymond, SRI, Haddam Neck P. Swetland,- SRI, Millstone V. McCree, OEDO D. Jaffe, PM, NRR DRS/EB bALP Coordinator R. Barkley, DRP P
RI:DRS RI:DRS RI:DRS RI:DRS -
Imhmeier/ms Gray Durr Hodges n t
7hM' (IfL b (M f7/>,.
..1////93 1$/93 1/g,/93 1/B/93 OFFICIAL RECORD COPY A:NNECEDB2.HGE
..e e atapq
. [....
. [o UNITED STATES /
1
- NUCt. EAR REGULATORY COMMISSION' j
.- g V
t REGtONi-i I
475 ALLENDALE ROAD.
'j*
KING of PRUSSIA. PENNSYLVANIA 19406 1415
- ...+-
l EROSION / CORROSION IN NUCLEAR POWER COMPONENTS & PIPING:
1993 NRC EROSION / CORROSION WORKSilOP.
AT TIIE SIIERATON VALLEY FORGE HOTEL
-1 SCHEDULE OF EVENTS C
.l Tutsday, Febntary 9,1993
'i 7:30 - 8:30 AM Registration in Foyer by the Franklin Room (Advance Registration 7:30 - 8:30 PM Monday Night in the Lobby) 8:20 '- 8:30 AM Call to Assembly A. Lohmeier
~
8:30 - 8:45 AM Introduction
' M. Hodges 8:45 - 9:30 AM E/C Monitoring Program-W. Russell NRC Overview 9:30 - 10:00 AM E/C Monitoring Program S. Miltenberger
-i Utility Overview (PSE&G) 10:00 - 10:15 AM Break All -
-10:15 - 10:45 AM E/C Monitoring Program E. Delksba Utility Oven >iew (NNECo) 10:45 - 11:30 AM E/C Monitoring Program B. Chexal EPRI Overview.
I1:30 - 11:45 Questions All 11:45 - 1:00 PM-Lunch All
. ~.
4
-4, EN y NUCLEAR REGULATORY COMMISSION
-o' REGION I 6
[^
'475 ALLENDAlt HOAD
.i
-.... + fe.
KING oF PRUSS%. PENNSYLVANIA 1940fr1415 -
- %f, 4
EROSION / CORROSION IN NUCLEAR POWER COMPONENTS & PIPING 1993 NRC EROSION / CORROSION WORKSHOP AT THE SHERATON VALLEY FORGE IIOTEL SCHEDULE OF EVENTS Tuesday, February 9,1993 1:00 - 2:45 PM Breakout Sessions Room A. Scope of Erosion / Corrosion Monitoring A1 - Franklin.
Programs, including Methods of Selecting A2 - Buchanan Systems and Components for Inspection
~
B. Inspection Methods and Practices B1 - Adams B2 -. Quaker -
C. Methods of Evaluating Inspection Data C1 - Hancock to Assess the Acceptability ofInspected C2.- Conestoga'.-
Components and Corrective Actions L
2:45 - 3:00 PM Break All 3:00 - 3:25 PM Summary & Feedback A1,'A2 Facilitators Breakout Session ~A Groups
. -1 3:25 - 3:50 PM Summary & Feedback
.B1, B2 Facilitators :
Break.out Session B Groups -
. 3:50 - 4:15 PM Summary & Feedback-Cl,' C2 Facilitators Breakout Session C Groups 4:15 - 4:30 PM Concluding Observations B. Chexal/E. DeBarba S.- Miltenberger 4:30 - 4:45 PM Closing Remarks.
- M.' Hodges
^
4:45 PM
, Adjournment A. 'Lohmeier o
, ~,
.