J-y.
W
' nn Tennese vwy Auw em omce &3 no nece# Aat>e a sa roo O.J "Iku'Zenngue n e ma,m me.caem rma n#r JAN 2 91993 U.S. Nuclear Regulatory Commission l
ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
i In the Matter of
)
Docket Nos. 50-259I Tennessee Valley Authority
)
50-260 50-296-BROWNS FERRY NUCLEAR PIANT (BFN) - NOTIFICATION OF ELECTRICAL DISTRIBUTION j
SYSTEM FUNCTION INSPECTION (EDSFI) FINDINGS COMPLETION
References:
1.
Letter from O. J. Zeringue to NRC dated July-20, 1992,-
"NRC Inspection Report 50-259,.260, 296/92-15 -. Reply to Notice of Violation (NOV) and Electrical Distribution System Function Inspection (EDSFI) Team Findings" 2.
Letter from A. F. Gibson to TVA dated June-18, 1992,
" Notice of Violation, NRC Inspection P,cport Nos.
50-259/92-15, 50-260/92-15, and 50-296/92-15" This letter provides notificatior. that TVA's corrective actions to the EDSFI findings have been corepleted for BFN Unit 2.
Reference 1 provided the list of commitments made in response to the EDSFI team findings documented in Reference 2.
)
These commitments have been addressed and actions completed. TVA has-i replaced the incorrectly installed 50 ampere-breaker and cracked thermal overloads (TOLs) and completed an inspection of'TOLs-in safety-related l
systems. Walkdowns of the plant AK. type breakers have been completed and controls are in place to ensure proper breaker changeout.
Electrical distribution calculations were revised. Appropriate procedures
.{
concerning the ground fault meter have also been revised.
Plant setpoint l -.
and scaling documents were developed for electrical surveillance
~
calibrations.
In addition, TVA has identified or removed the spare vendor wirings, including Units 1 and 3, that were identified during.the EDSFI inspecticia.
'I D' 9302030188'9301291
. p PDR-ADOCK 05000259 G.-
PDR j
d
i a
~
2 U.S. Nuclear Regulatory Commission Jb 2 91993 If-you have any questions regarding this notifleation, please-telephone G. D. Pierce at (205) 729-7566.
Sincerely, I
- 0. J. Zeringue cc NRC Resident Inspectot Browns Ferry Nuclear Plant Route 12, Dox 637 Athens, Alabama 35611 Mr. Thierry M. Ross, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. B. A. Wilson. Project Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 l
l' l
1
-