MONTHYEARML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20196G8881988-03-0303 March 1988 Headquarters Daily Rept for 880303 ML20127P3151976-07-30030 July 1976 Evaluation of Containment Leak Testing Program for Monticello Nuclear Generating Plant ML20125B8961972-08-0404 August 1972 Special Rept on Operation of Northern States Power Co, Monticello Reactor Facility, Conducted on 720804 ML20127P0161970-04-20020 April 1970 Summary Statement by Div of Reactor Licensing,Aec in Matter of Northern States Power Co ML20127M0061970-01-0505 January 1970 Supplemental Rept to Acrs ML20128C1821967-04-19019 April 1967 Div of Reactor Licensing Staff Rept on Field Erection of Reactor Vessel,Monticello Nuclear Generating Plant Unit 1 ML20127L0181967-03-22022 March 1967 Rept 2 to ACRS in Matter of Util Application for CP for Monticello,Mn,Nuclear Unit 1 ML20127L0661967-02-0909 February 1967 Addendum to Rept 1 to ACRS in Matter of Util Application for CP for Monticello,Mn Nuclear Unit 1 ML20127K6551967-01-24024 January 1967 Rept to ACRS in Matter of Util Application for CP for Monticello,Mn,Nuclear Unit 1 ML20128B4661966-09-0202 September 1966 Preliminary Aspects of NSPs Application for Construction Permit for Proposed Monticello Nuclear Generating Plant ML20128B4861966-04-21021 April 1966 Preliminary Site Evaluation-Project 416 1993-08-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D1261999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Monticello Nuclear Generating Plant.With ML20216E7031999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Monticello Nuclear Generating Plant.With ML20210Q0521999-08-0404 August 1999 Safety Evaluation Approving Relief Request 10 to License DPR-22 Per 10CFR50.55a(g)(6)(i).Inservice Exam for Relief Request 10,Parts A,B,C,D & E Impractical & Reasonable Assurance of Structural Integrity Provided ML20210Q6611999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Monticello Nuclear Generating Plant.With ML20209F7901999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Monticello Nuclear Generating Plant.With ML20195H0351999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Monticello Nuclear Generatintg Plant.With ML20206N1721999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Monticello Nuclear Generating Plant.With ML20205N0861999-04-12012 April 1999 Safety Evaluation Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20205P5701999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Monticello Nuclear Generating Plant.With ML20204H4951999-03-18018 March 1999 SER Concluding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Monticello.Therefore Staff Concludes Licensee Adequately Addressed Action Required in GL 96-05 ML20205G7391999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Monticello Nuclear Generating Plant.With ML20202F7901999-01-25025 January 1999 1999 Four Year Simulator Certification Rept for MNGP Simulation Facility ML20199E4871999-01-0606 January 1999 SER Accepting Licensee 951116,960214 & 0524 Responses to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode ML20199F6211998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Mngp.With ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20198P0691998-12-28028 December 1998 Safety Evaluation Concluding That NSP Proposed Alternative to Paragraph III-3411 of App III to 1986 Edition of Section XI of ASME Code Provides Acceptable Level of Quality & Safety.Alternative Authorized ML20198D0751998-12-10010 December 1998 Safety Evaluation Supporting NSP Proposed Change to EOPs to Use 2/3 Core Height as Potential Entry Condition Into Containment Flooding ML20198B2531998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Monticello Nuclear Generating Plant.With ML20195E3691998-11-12012 November 1998 Safety Evaluation Concluding That Licensee USI A-46 Implementation Has Met Purpose & Intent of Criteria in GIP-2 & Staff Sser 2 for Resolution of USI A-46 ML20195D2381998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Monticello Nuclear Generating Plant.With ML20198J4451998-10-22022 October 1998 Rev 2 to SIR-97-003, Review of Test Results of Two Surveillance Capsules & Recommendations for Matls Properties & Pressure-Temp Curves to Be Used for Monticello Rpv ML20154L3471998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Monticello Nuclear Generating Plant.With ML20153F0511998-09-21021 September 1998 Rev 2 to MNGP Colr,Cycle 19 ML20153E9361998-09-0808 September 1998 Rev 1 to MNGP Colr,Cycle 19 ML20153B0861998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Monticello Nuclear Generating Plant.With ML20237B8461998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Monticello Nuclear Generating Plant ML20236W5041998-07-21021 July 1998 ISI Exam Summary Rept - Refueling Outage 19 ML20236R1941998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Monticello Nuclear Generating Plant ML20249A5861998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Monticello Nuclear Generating Plant ML20247K3971998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Monticello Nuclear Generating Plant ML20217D8731998-04-13013 April 1998 Rev 0 to MNGP Colr,Cycle 19 ML20217F6431998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Monticello Nuclear Generating Plant ML20216D1041998-03-0505 March 1998 Rev 21 to Operational QA Plan ML20216H6481998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Monticello Nuclear Generating Plant ML20203G1431998-02-10010 February 1998 Rev 2 to Inservice Insp Exam Plan,Third Interval,920601- 020531 ML20203B2821998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Monticello Nuclear Generating Station ML20202F9161998-01-29029 January 1998 Special Rept:On 980128,two of Three Fire Protection Pumps Were Removed from Svc as Result of Sys Configuration Necessary to Support Planned Maintenance.Fire Pumps Were Returned to Svc on 980128 ML20216D2071997-12-31031 December 1997 1997 Annual Rept for Northern States Power Co ML20197J8131997-12-31031 December 1997 Revised Evacuation Time Estimates for Plume Exposure Pathway Emergency Planning Zone at Monticello Nuclear Power Plant. W/One Oversize Drawing ML20198P2201997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Monticello Nuclear Generating Plant ML20203J7131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Monticello Nuclear Generating Plant ML20199G7051997-11-19019 November 1997 Safety Evaluation Authorizing Relief Request 8 of Third 10 Yr Inservice Insp Interval ML20199H8181997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Monticello Nuclear Generating Plant ML20217K2081997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Monticello Nuclear Generating Plant ML20216H7771997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Monticello Nuclear Generating Plant ML20217K2741997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Monticello Nuclear Generating Plant ML20196H1081997-07-0808 July 1997 Rev 20 to Operational QA Plan ML20141B9271997-06-30030 June 1997 LOCA Containment Analyses for Use in Evaluation of NPSH for RHR & Core Spray Pumps ML20149E2921997-06-30030 June 1997 Monthly Operating Rept for June 1997 for MNGP ML20148S6341997-06-23023 June 1997 NPSH - Rept of Sulzer Bingham Pump 1999-09-30
[Table view] |
Text
. . . .. - . - - _ . - - . - . . . ._ - _- -... . .--- - -. . - - - __- _ .
, SEP g 3
A l r ,
r i
U. S. ATOMIC ENERGY C0fMISSION DIVISION OF REACTOR LICDiSING REPORT TO ADVISORY CONITTEE ON REACTOR SAF70UARDS
. IN THE MATTER OF
- PRELIMINARY ASPECTS OF NORTHERN STATES POWER COMPANY'S APPLICATION FOR A CONSTRUCTION PEPRIT FOR ITS PROPOSED MONTICELLO PIANT UNIT NO.1 i
i
~
~,
H 7
i 4
1 Note by the Director.. Division of Reactor Licensing
] ,.
The attached report hea been prepared by the Division of Reactor Licensing for consideration by the Advisory Committee on Reactor Safeguards at its September l 1966 meet'.ng.
4 9212030663 660902 PDR O ADOCK 05000263
., ppy
PRFLIMINARY ASFECTS OF NORTHERN STATES POWER COMPANY'S APPLICATION FOR A CONSTEUCTION PERMIT FOR ITS PROPOSED MONTICELLO NUCLEAR GENERATING PLANT The Northern States Power Company has submitted an applicated dated August 1,1966 for a utilizatien Facility License and Construction Permit for its Monticello Station Unit No. 1. The site is located on the west benk of the Micciccippi River about 3 miles northveet of Monticello. Minnesota. The 1325 acre site vill have a minimum exclusien distance of about 1600 ft. to the south of the reactor building and the nearest residence in at 1/2 miles. The nearest population center, St. Cloud, 1unnesota (population 3h,000) is about 22 miles northwest of the site.
The plant, a direct-cycle General Electric boiling-water reactor, will be designed for operation at 1675 MWt with an initial 31 cense limit lh69 MWt and a net electrical output of h72 Kn'. The Monticello Nuclear Generating Plant is similar to Dresden Units 2 and 3 and Mil] stone Point and also, except for the use of fet pumps, Oyster Creek and Nine Mile Point nuclear power plants.
One prominent novel feature of this plant is that the reactor vessel vill te field fabricated. Although the Facility Description and Safety Analysis Report does not have any discussion of this tatter, representatives of USP have stated that this mode of fabrication is planned.
A second novel feature is that cooling towers will be provided to remove heat frcm cendenser circulating water during those periods when river flow is too low for adequate heat rejection to the river. As a result limited volumetric diluticn of radioactive liquid vastes may require radioactive vaste storage or holdup tank capacity exceeding that fcr other equivalent plants.
- . . . - - - - - - ~ ~_ . . _ . .----.-
O
I l
+.
2 j The -Facility Leecription and Safety Analysie Report provides only a casual re-Terence to the cooling tovers. !
The ACBS at its seventy-third meeting on May 5-7, 1966, reviewed the site. !
proposed by Northern States Power Company for construction of a boiling veter reactor to be operated at 1469 MWt and concluded in a letter to the Chairman- ,
t USAEC, that "the Monticello site is acceptable for a reactor of the Eeneral type and power level proposed if adequate containment and associated engineered safe-guards are provided." The DRL Staff in a report to the Advisory Committee on.
Reactor Safeguards' dated April 21, 1966 envisioned no unusual siting ~ problems ,
for a General Electric boiling water reactor at the proposed Monticello site ;
taaed on a report furnished by NSp and a visit to the site by staff members on r
April 13, 1966.
Enced on a preliminary review of the application, there appear to be no Safety problema which cannot be resolved; however, field fabrication of the reactor vessel, as a "first of a kind" and as an important precedent for the
.. nuclear industry, vill receive special attention. .