ML20128B443
| ML20128B443 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/29/1993 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20128B447 | List: |
| References | |
| NUDOCS 9302030061 | |
| Download: ML20128B443 (5) | |
See also: IR 05000445/1992054
Text
- _ _ - . .
_ _ .
-
.. -
. _ _ _
.
.. -
--
a
- 8800
UNifI D $101 t s
v
,
,
f.
?,,
NUCt. EAR REGULATORY COMMISSION
'
REOlON IV
p,
[
611 MY AN l'LAZ A DRIVE SUlil 400
%
y
AR LINGTON, T [ XAS 76011 8064
JAN 2 91993
Dockets:
50-445
50-446
License: NPT-87
Construction Permit:
CPPR-127
TV Electric
ATTN:
W. J. Cahill, Jr., F.xecutive
Vice President Nuclear
Skyway Tower
400 North Olive Street, L.B. 81
Dallas, Texas 75201
SUBJECT: NRC INSPECTION REPORT 50-445/92-54; 50-446/92-54
This refers to the inspection conducted by Dr. J. B. Nicholas and
Mr. L. Wilborn of this office during the period December 14-23, 1992.
The
inspection included a review of activities authorized for Comanche Peak Steam
Electric Station, Units 1 and 2.
At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
,
enclosed report.
Areas examined during the inspection are identified in the report.
These
areas included the liquid and gaseous radioactive effluent waste program for
Unit I and preoperational activities for the radioactive waste systems and
plant systems affecting water chemistry in Unit 2.
Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observation of activities in progress.
The results of this inspection are documented in the enclosed report.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
L.#J.
.lan, Director
Divisi
of Radiation Safety
and Safeguards
jph
/302030061 930129
-
gon
noocs 03=gp
.
-
-
___
_
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.__
y ".
TV Electric
-2-
Enclosure:
Appendix - NRC Inspection Report
50-445/92-54; 50-446/92-54
cc w/ enclosure:
TV Electric
ATTH:
Roger D. Walker, Manager of
Regulatory Aff airs for Nuclear
Engineering Organization
Skyway Tower
400 North Olive Street, L.B. 81
Dallas, Texas 75201
..
Juanita Ellis
President - CASE
1426 South Polk Street
Dallar, Texas 75224
GDS Associates, Inc.
Suite 720
1850 Parkway Piace
Marietta, Ge.rgia 30067-8237
TU Electric
Bethesda Licensing
3 Metro Center, Suite 610
Rethesda, Maryland 20814
Jorden, Schulte, and Burchette
ATTN: William A. Burchette, Esq.
Counsel for Tex-La Electric
Cooperative of Texas
1025 Thomas Jefferson St., N.W.
Washington, D.C.
20007
Newman & Holtzinger, P C.
ATTN: Jack R. Newman, Esq.
1615 L. Street, N.W.
Suite 1000
Washington, D.C.
20036
Texas Department of Licensing & Regulation
ATTN:
G. R. Bynog, Program Manager /
Chief Inspector
Boiler Division
P.O. Box 12157, Capitol Station
lionorable Dale McPherson
County Judge
P.O. Box 851
Glen Rose, Texas 76043
1
l
1
. _ _ _ _
. _ _ _ _ _
. _ - .
. _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ .
.
.
-
_
~,
-
,.
5
'l
.
10 Electric
-3-
[
iexas Radiation Control Program Director
.
1100 West 49th Street
l
i
Owen L. Thero,-President
'
Quality Technology Company
j
Lakeview Hobile Home Park, Lot 35
4793 E. Loop 820 South
l
Fort Worth, Texas 76119
l
l
I
I
e
U
r
i
3
&
,
t
I
-
'
.
. , . . . , - _ _
.
.-
.
- - ____
____
_
_
.
.
.
10 Electric
-4-
bcc to DMB (!!06)
bcc distrib. by RIV:
J. L. M11hoan
j
B. Murray, DRSS/FIPS
'
J. B. Nicholas. FIPS
L. W11 born, f!PS
,
Section Chief, DRP/B
.
Project Engineer, DRP/B
J
Section Chief, DRP/1SS
' 8
%
Comanche Peak Resident inspector (2)
4+
MIS System
DRSS/FIPS File
RIV file
Lisa Shea, RM/Alf, (MS MNDB 4503)
T. Ber gman, NRR Project Manager (MS 13 HIS)
B. Hollan, NRR Project Manager (MS 13 HIS)
,
s
DD:DRSh/
D: $f
RIV:fIPS
RIV:fIPS
C:fIPS
,
- JBNicholas
- LWilborn
- BMarray
hLi(fChamtdMain AB 3cach
_./ _/93
/ /93 _ l /93_ _ ' ILF193 .
Im/93_
0:DE5L
LJCalhn'
( l (N93
- freviously concurre3.
- - - - - -
-
3
.
.
5
- - .
,
TV Electric
-4-
'qbec to DMB (IE06)
bec distrib. oy RIV:
J. L. Milhoan
B. Murray. DRSS/flPS
J. B. Nicholas, FIPS
L. W11 born, FIPS
Section Chief, CRP/B
Project Engineer, DRP/B
?
Sertion Chief, DRP/TSS
f
-
Coinanche Peak, Resident inspectr- (2)
MIS System
DRSS/FIPS File
RIV file
Lisa Shea, RM/ALF, (MS MNBB 4503)
T. Bergman, NRR Project Manager (MS 13 H15)
B. Ilolian, NRR Project Manager (MS 131115)
-.-
-
lRIV:FIPS
RIV:FIPS
C:FIPS
DD:DRSh k
D:@
,
N{Chambe5ain
AB 3e'ach
- JBNicholas
- LWilborn
- BMurray
<'
<_ / /93
/ /93-
/ /93
- //'N/93
i/27/93
0:06L
LJCallhn'
Y
l I /93
- Previously concurred.
'
020004
. _ . _.