ML20128B378

From kanterella
Jump to navigation Jump to search
Forwards Public & Central Files Versions of Rev 13 to EPIP Index & Rev 16 to EPIP 1.1, Plant Operations Manager: Initial Response. Central Files Version Withheld
ML20128B378
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/26/1993
From: Link B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19303F245 List:
References
CON-NRC-93-010, CON-NRC-93-10 VPNPD-93-018, VPNPD-93-18, NUDOCS 9302030029
Download: ML20128B378 (1)


Text

_ _ _ - _ _ _ _ _ _ _.

k Wisconsin Electnc POWER COMPANY at w te.,m 3 e...., r.us thue 4 wum um m ms VPHPD-93-018 NRC-93-010 January 26, 1993 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlemen DOCKET NOS. 50-266 AND 50-301 EMERGENCY PLAN IMPLEMEllTING PROCEDURES POINT BEAC11 NUCLEAR PLANT, UNITS 1 & 2 Enclosed are copies of revised procedures to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual.

The procedures consist of changes which should be filed in your copics of the subject document in accordance with the attached instructions.

Please note that the procedures containing names and telephone numbers are stamped "NRC ONLY, NOT FOR PUBLIC DISCLOSURE."

A copy of the affected procedures, with names and numbers deleted, is provided and stamped " NAMES AND 'tELEPl!ONE NUMBERS DELETED" to assure confidentiality and facilitate your distribution to the public documents room.

Sincerely, f.hAAAut) w Bob L ok Vice ' resident Nuclear Power200033 RL/jg

))

Enclosures l

cc:

NRC Resident Inspector (w/o/c)

[t bl

{,V l

Incident Response Center, Region III (2 copies)

U

\\ N

f. %pC 9302030029 930126

\\

hDR ADOCK0500g6

.twAsir, v/uhn a<47 rei<n.3 rig,/afi,o