Forwards Insp Rept 50-327/92-38 & 50-328/92-38 on 921230-930114.Violation Involving Operation of Unit 2 Reactor W/Refueling Water Storage Tank Solution Temp Below Required Min Limit for Approx 24 H,Noted
ML20128B124
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/15/1993
From: Merschoff E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Medford M
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20128B128 List:
References
EA-92-257, NUDOCS 9302020405
Download: ML20128B124 (4)


See also: IR 05000327/1992038

Text

. _

- _ _ _ -

.

I

,

a

JtM i 5 @ ,

i

Docket Nos. 50-327, 50-328

License llos. DPR-77, DPR-79

EA 92-257

Tennessee Valley Authority

ATTN: Dr. Mark 0. Medford, Vice President '

Nuclear Assurance, Licensing t, fuels

3B Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Gentlemen:

SUBJECT: NRC INSPEC110N REPORT NOS. 50-327/92-38 AND 50-328/92-38

This refers to the special inspection conducted by W. Holland of this office

on December 30, 1992 through January 14, 1993. The inspection included a

review of activities authorized for your Sequoyah facility. At the conclusion

of the inspection, the findings were discussed with those members of your

staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Based on the results of the inspection, apparent violations were identified

and are being considered for escalated enforcement action in accordance with-

the " General Statement of Policy and Procedure for NRC Enforcement Actions"

(Enforcement Policy), 10 CFR Part 2, Appendix C. The apparent violations

involved operation of your Unit 2 reactor with the Refueling Water = Storage

Tank solution temperature below the required minimum ~1imit for approximately

.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This event is of concern because several other administrative

control processes appeared to fail and did not provide barriers to prevent-

this occurrence. Accordingly, no Notice of Violation is presently being

issued for these inspection findings. Please be advised that the number and

characterization of the apparent violations described in the enclosed

inspection report may change as a-result of further NRC review.

An enforcement conference to discuss this apparent violation has been

scheduled for January 26, 1993 in the NRC Region 11 Office. The purposes of

this conference are to discuss the apparent, violation, its- cause and safety

significance;-to provide you the opportunity to point out any errors in'our

~

inspection report; to provide an opportunity for you te present'your proposed

corrective actions; and to discuss any other information- that will help us

determine the appropriate enforcecent action in accordance with the

Enforcement Policy. You will be advised by separate correspondence of the

results of our deliberations on this matter. No response regarding the

apparent violation is required at this time.

i r

9302020405 930110

PDR ADOCK 05000327_

-

- 0- PDR ' {_ g-

. . . - ._. --. - ... - - . . . . . - . _ . . . . - -. -. -. . . . . . .. ... . ,

..

i

'

Tennessee Valley Authority 2

in accordance with Section 2.790(a) of the NRC's " Rules of Practice," a copy

'

of this letter and its enclosures will be placed in the NRC's Public Document

Room.

Should you have any questions concerning this letter, pisase contact us.

Sincerely,

Originnt signed 4 ,

jm R. }u!!B50ll

Ellis W. Merschoff, Director

Division of Reactor Projects

,

Enclosure:

HRC luspection Report

cc w/ encl: (See page 3)

l

.

I

l

l

l'

'

l

f-

.

.-

.

i'

.

L

l

l

- _

.,

N -'Yt- .-,.,..t ~ -

-

.

1

.

Tennessoo Valley Authority 3

JA!i 151993

cc w/ enc 1:

Mr. John B. Waters, Director Mr. M. J. Burzynski, Manager

Tennessee Valley Authority Nuclear Licensing and

ET 12A Regulatory Affairs

400 West Summit Hill Drive Tennessee Valley Authority

Knoxville, TN 37902 5B Lookout Place

Chattanooga, Tennessee 37402 2801

TVA Representative

Tennessee Valley Authority

Rockville Office Mr. Michael li. Mobley, Director

11921 Rockville Pike Division of Radiological Health

Suite 402 T.E.R.R.A. Building 6th Floor

Rockville, MD 20852 150 9th Avenue North -

Nashville, TN 37219-5404

General Counsel

Tennessee Valley Authority County Judge

ET 1111 Hamilton County Courthouse

400 West Summit 11111 Drive Chattanooga, TN 37402

Knoxville, TN 37902

bec w/ encl: (See page 4)

Mr. J. R. Bynum, Vice President

Nuclear Operations

Tennessee Valley Authority

3B Lookout Place

101 Market Street

Chattanooga, TN 37402-2801

Ms. Marci Cooper, Site

Licensing Manager

Sequoyah Nuclear Plant

Tennessee Valley Authority

P. O. Box 2000 -

Soddy-Daisy, TN 37379

Mr. Robert Fenech, Vice President

Sequoyah Nuclear Plant

Tennessee Valley Authority

P. O. Box 2000

Soddy-Daisy, TN 37379

__

- - - - - - _ _ - - - - - - - . - _ - - . . - - - - - - - - _ - , _ _ , _ - , , _ _ _ _ _ _ _ _ _ _ _ _ , , _ _ - ,- , _ _ _ _

.-_____ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - . __ _ - _ __

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _

.

. >

,

.-

~ Tonnosace. Valley Authority 4 J/M I 51993

bcc w/ encl:

J. J. Johnson, Rll

G. C. Lainas, NRR

f. J, liebdon, NRR

B. A. Wilson, Ril

P. J Kellogg, Ri!

D. IL LaBarge, NRR

J. L. Mathis, Ri1

NRC Document Control Desk

i

NRC Resident inspector  :

U.S. Nuclear Regulatory Conunission

2600 Igou lerry Road ,

Soddy-Daisy, TN 37379 *

,

,

,

L

t

I

'

'

Ril:0RP4 RII:DRP R!l:ElG

-

--

BW -

JJofid'on IJe ins-

\/ /d / llI/517

Ril:DRP A' Ril:D P4A. R!l:DRP4

.

Sgie!cr / v .

A

Witollar / ogg

PKt' '

t/M qy jl, ylo^i ild/12

-;

.

2'-' I'

_

+ -- ~~,.--5,----., -e- or ey,-