Mod 40,extending Period of Performance to 850630 & Definitizing Mod 1 to Task Order 47,Mod 2 to Task Orders 50, 53,63 & Mods 11-16 to Task Order 67,to Technical Assistance to Support NRC IE Personnel in Investigations of Incidents
ML20128A925
Person / Time
Issue date: 06/19/1985
From: Edgeworth P, Lofy R
NRC OFFICE OF ADMINISTRATION (ADM), PARAMETER, INC.
To:
Shared Package
ML20128A871 List:
References
CON-FIN-B-1302, CON-NRC-05-82-249, CON-NRC-5-82-249 IEB-79-02, IEB-79-14, IEB-79-2, NUDOCS 8507030068
Download: ML20128A925 (6)


Text

- _ - _ _ _ _ _ _

~

a. a ore l H At t eu ouut Faut v6 a AMENOMENT CF SOLICITATION / MODIFICATION OF CONTR ACT 1

[ 3

2. AMLNOMEN T/MObaFICAi EON NO.

J.LeetcIlvL DAIL

.. #4 t uv e b e l euN/PuM(HA$L 64 L4. No.

l. PHOJLC f NO. (tf.ppure 40 01E-82-249 dtd 1/8/85. 2/2?/85 3/12/85 6/t g

icAou. Nest Lato v,uomo m.. n,.., & yc g EM, 5

  • . 66 toto av egge c

U. S. Nuclear Regulatory Comission 6/4/85, 5/10/85 Division of Contracts Washington DC 20555

8. N AME AND ADONEll OF CON T R ACTOR,N..#,et, e

.ty. 8.e.e..d J.JP C.d.J g

9A. AMLNUMENT or SOL 6C4T ATION NC Parameter, Inc.

13380 Watertown Plank Road

,,,. oAno <sts stan s as Elm Grove, WI 53122 toA.gueF#CAf 40N OF CON f N ACf/OR '

X NRC-05-82-249 30s. OAT 4~0,s42 ffAM JJJ CODE lF ACILITV CODE 7/2/82

11. THIS ITEM ONLY APPLIES TO AMENOMENTS OF SOLICITATIONS The ebeve numeuseed se64sitation le amended as set forth in item 14. The hour end dote specified for receipt of Offers isentended, is noi tenthed.

OHere mv.t eseneuviedge feceipt of thee amendment prior to the houf and deto specified in the solicitetion of es amended, by one of the following methods:

(e) Gy completing iteme 0 and it, and returning copies of the amendment; (b) Gy acknowledging receipt of this amend,nent on each copy of the e eusemitted; er ict Oy esserete letter er toespem wh6eh includes e reference to the selecitetson and amendment numters. F AILUME OF YOUM ACKf 40WLt MENT TO DE RECElvf D AT THE PLACE DEllGNATED FOR THE RCCEIPT OF OFFEMS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RES IN fiEJECTlON OF YOUR OFFEM. If by virtue of this amendment you do. ire to thenes en offer alremfy submitted, such change may be made by telegro letter,provided seen toespem et letter metas toforense to Wie sof6citetion and thle amendment, and le recohef prior to the opening hour and dote spec 6 fief.

Tr~xtrovNTiNie ANo ArrRownsATeoN oATA trre.o.6..;

B&R No. 30-19-05-03 FIN B1302 31X0200.305

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTH ACTS /ORDE nS, IT M00lFIES THG CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

hCYO l$e R N

bhh, N,",*,/,2?e "40'!',,",WfMNr"#!' ',M%%','N87"m'#NisW"n'H"Ni.%i"^* ** "* "'""'"'"

C. THet SUPPLEMENTAL AGREEMENT 65 ENTERED INTO PURSUANT TO AUTHOR 6YY OF X

Mutual agreement of the parties B00619 g70go 5 c h tR<s,..o eye..r.. den a.

4

.h.n,,,

NRC-05-82-249 PDR E,IMPORTANT: Contractor O i.noi, Gi.<.ouir.oio.i.nini.ooco,noni.norgiu,n 3

cor... io in..tuino oetic..

Trnriumistarxurnsurn;ucamexTisN m,,

4.

., uCr mu.. n..e,.

.,,i.4 u,u.ti..,,

,,,,..wn, ~n..nm iv.m..,

The purpose of this modification is to:

1.

Definitize Modification No. 2 to Task Order No. 50. IE Dulletin 79-14. " Seismic Analyst for As-Built Safety Related Piping Systems."

2.

Definitize Modification No. 2 to Task Order No. 53. IE Dulletin 79-02, " Pipe Support Da Plate Designs Using Concrete Expansion Anchor Dolts."

3.

Definitize Modification No. I to Task Order No. 47

g. g,.,.,e,...e......n,.......e...sio.................... e. n.m.A.

i.A...h.....e,....e.......

............ ia... ee, uA;NAME sNo mLcantwR rr,

..aa.o nsA.NAucxntrnictnreammf shu oev<ctu,r,n..

.o

(-

Q k,

$/78.

Paul J. Edgeworth

nrra, c-wra p

..c oAn ~~m i...uN. m m rra r u. A -

3 i.C. onra,

$$ $Y "f a * <>

s',

  • tf N,

towns.. *iof air'e';;Ti.;Wa**

d

~~~

.,T mjg,,<g_,,,....

,,t a v io u...., e....oirioN vhu...Lc g

y, p

Modification No. 40 Contract No. NRC-05-82-249 Page 2 4.

Definitize Modification No. 2 to Task Order No. 63, 5.

Definitize Modifications No. 11,12,13,14,15 and 16 to Task Order No. 67 and extend the period of performance.

6.

Definitize Task Order No. 76 7.

Extend the Period of Performance of the basic contract.

NOW, THEREFORE, the following changes are made:

I.

Modification No. 2 to Task Order No. 50 A.

The period of perfornance of Task Order No. 50 is extended from March 30, 1985 through June 30, 1985, at no additional cost to the Government.

B.

The final deliverable for this task shall be a report on " Status of Closeout of IE Bulletin 79-14" through June 30, 1985.

!!. Modification No. 2 to_ Task Order No. 53 A.

The period of performance of Task Order No. 53 is extended from March 30, 1985 through June 30, 1985, at no additional cost to the Government.

B.

The final deliverable for this task shall be a report on " Status of Closeout of IE Bulletin 79-02" through June 30, 1985.

!!!. Modification No. I to Task Order No. 47 The period of performance of Task Order No. 47 is extended through June 30, 1985, at no additional cost to the Government.

IV. Modification No. 2 to Task Order No. 63 The period of performance of Task Order No. 63 is extended from September 30, 1984 through June 30, 1985, at no additional cost to the Government.

V.

Task __ Order _ No. 6_7_

Total Total Total Estimated Fixed Estimated A.

Task Order No. 67 through Cost Fee _

Amount Modification No. 10 -

Technical Assistance Associated with Comanche Peak, Civil, Structural, Mechanical and Electrical Allegations

$779.247.41

+ $16,802.28 = $796,049.69 Modification No. 11 194,324.52 +

4,032.80 =

198.357.32 Modification No. 12

  • 42,078.64 +

893.44 =

42,972.08

Modification No. 40 Contract No. NRC-05-82-249 Page 3 V.

Task Order tha. 67 (Continued)

Modification No.13

$196,625.62 + $ 4,078.82 = $200,704.34 Modification No.14 - decrease (5,200.00)+

(104.00)=

(5,304.00)

Modification No. 15 - decrease (8.737.00)+

(174.74)=

(8.911.74)

Modification No. 16 - decrease _ (2,600.00)+

(52.00)=

(2,652.00)

Revised Total. Amounts for

$1,195,739.19 + $ 25,476.60 = 331,221. 215;79 Task Order No. 67 through Modifications No. 16 B.

The period of performance of Task Order No. 67 is extended through June 1, 1985. The final deliverable for this task shall be a status report.on:

effort performed under Task Order No. 67 through June 1,1985.

VI. Task Order No. 76, " Technical Assistance at Byron Nuclear Plant" Verbal authorization to initiate action on the above number Task Order was issued on November 23, 1984. On November 27, 1984, the contractor was notified that because it was discovered that the contractor individual assigned had a conflict of interest, the. Task Order was cancelled. A proposal for costs incurred for performance up to the cancellation of the Task Order was requested and received. Based on a review of the contractor's proposal, the following cost amount for work performed is hereby established:

Cost Amount - Task Order No. 76 The Total Estimated Amount of this Task Order is $2,213.08, of which $2.115.09 represents the estimated costs and $97.99 represents the fixed fee.

VII. Under ARTICLE II - PERIOD OF PERFORMANCE, the period of performance is hereby extended from May 30, 1985 through June 30, 1985.

t b

~~

f

-l j

/?)ob W/4 H00MICATJON 60 THE STATEMENT OF WORK t

Thisleodit.icatden requires aschange jn thet tequind.14vetliof effort fo speci alistssworking:on Comanche Peak.allegationt.;.

t (1),15trectura) Ehgi.npening Specjailist:. Reduce,the.levej.of 1601 hour0.0185 days <br />0.445 hours <br />0.00265 weeks <br />6.091805e-4 months <br />.u. -

(2).ttedhanicah.Pipine and;ComponestdQualitylC,ontml shd f)a Assurance Speqialist:s : Increase, theilevtl of effort.by 1,60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br />.

I ding.4 Therer16 no chaeger f n thet periodiof peqformance or the contract.c d

'a r

h

filBD W /f NODIFICATION TO THE STATEP.ENT OF WORK specialists storkingion Comanche Peak allegations. -This modificati (1)'

u 1 Engineering Specialist: Reduce the level of effort (2)'.Nechanical P'ipino and Component / Quality Control and Quality Assurance' Specialists.

  • Increase the level of effort for one specialist by 2.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. for one:specialtst by 56 hours6.481481e-4 days <br />0.0156 hours <br />9.259259e-5 weeks <br />2.1308e-5 months <br />, for one specialist by 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br />, for one specialist by 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />, for one specialist 64 hburs.such that each has 160' hours available as of April 29, 1985.1 (3) Quality Control Quality. Assurance specialists.

level of effort for one. specialist by 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Increase the level of effort for one specialist by 196 hours0.00227 days <br />0.0544 hours <br />3.240741e-4 weeks <br />7.4578e-5 months <br />. Decrease the This results in no change in the: total level of effort for the. task order i

Mt,v 91985

/))CD lb i

MODIFICATION TO THE STATENENT OF WORK This modiffhation requires a charge in estimated level of effort for two specialists' working on Comanche Peak allegations.

(1) 5 teral Engineering Specialist: Reduce the level of effort by 80 (2) Mechani cal Piping and Component / Quality Control and Quality Assurance Specta' ist:

Increase the level of effort for one specialist by 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />.

This results in no change in the total level of effort for the task order.