Application for Amend to QA Program Approval for Radioactive Matl package:0346,replacing Paragraph Re QA Plan to Reflect Decommissioning QA Plan
ML20128A319
Person / Time
Site: 07100346
Issue date: 11/30/1992
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
P-92296, NUDOCS 9212030281
Download: ML20128A319 (2)


Text

__

e e

4 0 Pubh*c service' A

PutAc Service

-.<c.i -

P.0 Bon MO 16805 WCR 19 3/2, Platteville, Colorado 80651 November 30, 1992 Fort St. Vrain Unit No. 1 P-92296 Director, Division of Safeguards and Transportation Office of Nuclear Material Safety and Safeguards U.

S.

Nuclear Regulatory Commission Washington, D.C.

20555 Docket No. 71-0346

SUBJECT:

Change in QA Program for Radioactive Material Packages

REFERENCES:

1)

NRC

Letter, MacDonald to
Crawford, dated September 19, 1989 (G-89328) 2)

NRC

Letter, Erickson _to_
Crawford, dated November 23, 1992 (G-92244)

Dear Sir:

Public Service Company of Colorado (PSC) requests an amendment to the Quality Assurance (QA)

Program Approval for Radk; active haterial Packagec, Approval Number 0346, Revision 4 (Reference 1).

Revision 4 reads as follows:

" Activities conducted under applicable criteria of Appendix B of 10 CFR Part 50 to_be in accordance with your QA program for operations at the Fort St. Vrain Unit No. 1 Nuclear Power Plant (NRC Dccket No. 50-267) with regard to transportati.on packages."

PSC requests that this document be amended to read as follows:

" Activities conductc;"

under applica ble criteria of Appendix B of 10 CFR Part 50 to be its accordance with your QA program for decommissioning of Fort St. Vrain Unit No. 1 Nuclear Power Plar' (NRC Locket No. 50-267) with regard to transportation packages."

bhbl c)I y{ /f, ['D 9212030231 921130 PDR ADOCK 07100346 j n C

PDR N

v

-November 30, 1992 P-92296 Page 2 This change is necessary because the.:urrent Fort St. Vrain (FSV) plant 10CFR50-Appendix B QA program was deleted on November 23, 1992, with the issuance of the Decommissioning Order for PSV in accordance with Reference 2.

The former QA program is replaced with the Decommissioning QA program as delineated-in the Decommissioning

Plan, Section 7.

In the Safety Evaluation associated with the Decommissioning Order, the NRC states, "PSC's quality assurtnce program (QAP) is described in Chapter 7 of the-PDP and is designed to meet'the requirements of Appendix B to 10 CFR Part 50.

. The staff concludes that the Quality Assurance Plan is adequate and' meets the requirements of 10 CFR 50.82(b} (5) and the guidelines of SRP Section 17.2."

Also please change the correspondence title for the " Attention" of Mr.

A.

C.

Crawford from "Vice President Nuclear Operations" to "Vice President Electric Production."

If you have any questions regarding this matter. please contact Mr.

M. H. Holmes at (303) 620-1701.

Sincerely, 0 lY )&uJus),

D.

W.

Warembourg

/

Manager, Nuclear Operations DWW/PB:pc cc: