ML20128A272

From kanterella
Jump to navigation Jump to search
Forwards Adequacy of Structural Criteria for Monticello Nuclear Generating Plant Unit 1
ML20128A272
Person / Time
Site: Monticello 
Issue date: 03/31/1967
From: Newmark N
ILLINOIS, UNIV. OF, URBANA, IL
To: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20128A275 List:
References
NUDOCS 9212030263
Download: ML20128A272 (1)


Text

. -.

S NATHAN M.

NEWMARK til TALDOT LABONATORY. URBANA. ILLINOls CONSULTING ENGINEERING GERVICES l

31 March 1967 Dr. Peter A. Morris, Of rector Division of Reactor Licensing U. S. Atomic Energy Conrniss Ion Washington, D.C.

20545 Re: Transmittal of Report on Monticello Nuclear Generating Plant Unit 1 Docket 50-263

Dear Dr. Morris:

Transmitted herewlth are four copies of the report by. Dr. W. J. Hall and myself on the above-ment ioned plant. The report as transmitted to you has two typographical errors In spelling corrected in ink. - On page 4, paragraph 4, line 2, the word " earthquake" was misspelled and is corrected.

On page 5, line 4, the word " displaces" should be replaced by the wo rd "d isplaced."

Sincerely yours, L

N. M. Newma rk bjw cc:

W. J. Hall Enclosures 9212030263 670331' PDR ADOCK 05000263-6 PDR v