Etog f'Yg3
(
3%,
UNITED STATES 7,
NUCLEAR REGULATORY COMMISSION pj WASHINGTON, D. C. 20555
%g s.,
,/
MAY S 1985 Docket Nos.: 50-445 and 50-446 APPLICANT:
Texas Utilities Generating Company (TUGCO)
FACILITY:
Comanche Peak Steam Electric' Station, Units 1 and 2
SUBJECT:
SUMMARY
OF MEETING HELD ON APRIL 22, 1985 - TECHNICAL CONFERENCE REGARDING APPLICANTS U-BOLT TORQUE SAMPLE ON UNIT 2 On April 22, 1985, the NRC staff met with Texas Utilities (TUGCO) and its consultants to discuss the sampling program for cinched-down U-bolts on Unit 2.
The meeting was transcribed. Attendees at the meeting and copies of all viewgraphs shown at the meeting are contained in the transcript.
The meeting was a technical session to assist the NRC staff in determining whether or not TU made a misleading or material false statement regarding a sampling program for torque on cinched-down U-bolts. The statement, introduced in the ASLB hearings, was:
"To determine the range of torques-which exist in the field, Applicants inspected the torque of a randomly selected representative sample of cinched-down U-bolt supports." This sampling did not include any Unit 1 U-bolts. Applicant stated that these were not included because they had been painted, and it was possible that this would invalidate the measured torque values.
This issue is currently under staff review.
,-u L /4" t. <. ///
,..r Charles Trammell, Project Manager for Comanche Peak Project Division of Licensing
Enclosures: