Forwards Page Changes to License SNM-1107,updating Section 2.5.1, Emergency Plan to Incorporate 920930 Radiological Contingency Plan Update
ML20127P611
Person / Time
Site: Westinghouse
Issue date: 01/20/1993
From: Fischer R
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Bidinger G
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
RE-REF-93-015, RE-REF-93-15, NUDOCS 9302020013
Download: ML20127P611 (5)


Text

.m

.r

-I

\\

(

-)

Westinghouse Commercial Nucleat Dac R y 'jgys*b '** **

Electric Corporation

. Fuel Division RE-REF-93-015 January 20,1993 U. S. Nuclear Regulatory Commission ATTN: Mr. George Bidinger, Section Leader p //g/

Uranium Fuel Section Fuel Cycle Branch Division of Industrial and hiedical Nuclear Safety, NMSS Washington, DC 20555

Dear Mr. Bidinger:

REF: License SNM-1107/ Radiological Contitigency Plan Update Incorporation of 9/30/92 Revision into the License We are enclosing the following page changes to License SNM-1107; pages iii, vi, ix, and 2.51 of License SNM-1107, updating Section 2.5.1, Emercency Plan and the revision record.

Since this revision does not dilute or reduce the effectiveness of the Plan, no licensing fea sre submitted.

If you have any questions or concerns, please contact me at (803) 77ti-2610, Extension 3671.

Sincerely, WESTINGHOUSE ELECTRIC CORPORATION is&l w Ja Roger E. Fischer Sr. Engineer ce; A. J. Nardi, Manager NES Licensing l

1 l

h li 9302020013 930120 P.0R ADOCK 07001151 C

pop The itshnghouse CommerchiNua'earfue/Dmsion - IUnnerofthe 1988Afa/colm Baldnge Nan 61a/Ouak)? Award

-SCHEDULE OF REVISIONS Page Revision-Page-Revision Number Number Number Number i

15 1.5-2 2

11 10 1.5-3 2

111 24 1.5-4 2

iv 3

1.5-5 2

y 15 1.5-6 2

vi 23 1.6-1 2-vii 14 1.7-1 2

viii 12 1.7-2 2

ix 24 1.8-3 2.

1.0-1 2

1.8-2 2

1.0-2 15 1.8-3 2

1.1-1 2

1.8-4 2

1.1-2 2

1.8-5 2

1,2-1 1.8-6 2

1.3-1 2

1.8-7 2

1,3-2 11 1.8-8 2

1.3-3 2

1.8-9 2

1.3-4 2

1.8-10 2

1.3-5 2

1.8-11 2

1.3-6 2

1.8-12 2

1.'a-7 2

1.8-13 2

1.4-1 2

1.8-14 2

1.4-2 2

1.8-15 2

1.4-3 2

1.8-16 2

1.4-4 2

1.8-17 2

1.4-5 2

-1.8-18 2

l 1.4-6 2

1.8-19 2

1.4-7 2

1.8-20 2

1.4-8 2

1.8-21 2

1.5-1 2

1.8-22 2

Docket No. 70-1151 Initial Submittal Date:

4/30/83_

Page No.

iii

_ License No. SNM-1107 Revision Submittal Date:

1/20/93_ Revision No.

24 l

s-SCHEDULE OF REVISIONS s

Page Revision Page Revision Number Number Humber Number 2.0-1 15 2.3 2 2.1-1 2

2.3-12 lL 2.1-2 20 2.3-13 2

2.1-3 20 2.3-14 2

2.1-4 2

2.3-15 3

2.1-5 2

2.3-16 deleted 2.2-1 2

2.3-17

'2 2.2-2 2

2.3-18 2-2.2-3 16 2.3-19 2

2.2-4 3

2.3-20 2

2.2-5 3

2.4-1 3

2.2-6 2

2.5-1 24 2.2-7 2

2.6-1 5

2.2-8 2

2.7-1 3

2.2-9 20 2.7-2 3-2.2-10 20 2.7-3 2

2.2-11 2

2.7-4 2

2.2-12 4

2.7-5 2

2.2-13 4

2.7-6 2

2.2-14 15 3.0-1 2

2.3-1 4

3.1-1 2-2.3-2 4

3.1-2 2

2.3-3 3

3.1-3 2

2.3-4 2

3.1-4 2

2.3-5 2

3.1-5 2

2.3-6 2

3.1-6

-2 2.3-7 2

3.1-7 2

2,3-8 2

3.1-8 2

2.3-9 2'

3.1-9 2

2.3-10 3

Docket No. 70-1151 Initial Submittal Date:

4/30/83 Page No.

vi License No. SNM-1107 Revision-Submittal Date:

1/20/93 Revision No.

24

/

e REVISION RECOP.Q Revision Date of Number _

Revision Patres Revis._ed :

Revision Reason 13 7/23/87 New pages 1.11-6 Added authorization for through 1.11-8.

off-site drying of calcium fluoride.

14 8/14/87 Revised page 4.5-1.

Added drying of calcium fluoride to scope of operations.

Revised pages 4.8-1 Delete Western Zirconium and 4.8-2.

as an authorized recipient of IlF.

Revised page 4.1-1.

Update document date.

Revised pages 1.112, Added encapsulated 1.11-4,1. Il-5, and materials to briquetting 1.Il-6.

description.

15 8/18/87 New pages 1.141 thru Added criteria to 1.14-5 and 2.2-14.

preclude foreign contaminants from UF, cylinders.

16 1/25/88 Revised page 2.2-3.

Add interlock pressure requirement positive -

pressure gloveboxes.

17 2/8/88 Revised page 2.5-1.

Update of Emergency Plan Section.

18 5/25/88 Revised page 2.5-1.

Update of Emergency Plan Section.

19 8/12/88 Revised page 2.51.

Update of Emergency Plan Section.

20 9/30/88 Revised pages 2.1-2, Add frequency criteria 2.1-3, 2.2-9 and to the definitions 2.2-10.

Section.

Revised criteria for bulk -

containers.

21 6/23/89 Revised page 2.5.1 Update of Emergency Plan Section.

22 1/30/91 Revised page 2,5.1 Incorporate Site Emerg. Plan into license, to replace Radiological Contingency Plan.

23 7/16/92 Revised page 2.5.1 Update Site Emerg. Plan.

74 1/20/93 Revised page 2.5.1 Update Site Emerg. Plan.

Docket No. 70-1151 Initial Submittal Date:

7/23/87 Page No.

ix License No. SNM-1107 Revision Submittal Date:

1/20/93 Revision No.

24

y..

2,.4.2 Nonroutine and emergency operationsLinvolving SNM chall bn performed only after the particular operation-~ has been approved by the appropriate line management function and-the-Radiation - Protection Component, consistent with - the urgency of the situation in the event of an _ emergency. ' All equipment specified.as necessary-to the operation _by the line management function and radiation protection function-shall be provided and operative.

2.4.3 A continuing program of _ surveillance, air sampling and smear sampling which is' adequate to detect ventilation deficiencies and assure compliance with 10 CFR 20 limits, shall be conducted.

2.4.4 UF6 cylinders shall have valve covers in place when being moved except for those which have been processed and-evacuated.

In the event that it is not practical' to attach i

a valve cover to the cylinder, they may be transported without the valve covers provided that a supervisor or designee escort is provided (in addition to the individual operating the transport equipment),

and the personnel involved with the transfers - shall be knowledgeable in emergency actions to be taken in event of damage to the cylinder valve during the transfers.

2.4.5 Unless specifically exempted by license conditions, i

Westinghouse shall comply with the provisions.of Title 10, Chapter 1, Code of Federal Regulations, Parts 19 and 20.

2.4.6 A Site Physical Security Plan and implementing _ procedures shall be maintained in accordance with 10 CFR 73.67.

2.5 Emercency Plan Until January 30, 1991 Westinghouse shall implement,

maintain, and execute the response meesures -of the Radiological Contingency Plan, submitted to the Commission

.6 on September 30, 1981, and supplemented or July 20, 1983, February 24, June 1, July 24, and Septembe't 11, 1984, July 18, 1985, September-18, 1986, January 29, 1988, February 8, 1988, April 29, 1988, August 12, 1988 and June 23, 1989.

Effective January 30, 1991 Westinghouse shall~ implement, maintain and execute the response measures of the Site Emergency Plan submitted to the Commission - on = April l 30,.

1990, and supplemented on January 30, 1991, July 16, 1992-and January 20, 1993.

Westinghouse shall ~also maintain 1 implementing procedures for the Site Emergency Plan as necessary to implement the Plan.

This Site Emergency Plan and associated implementing procedures supersede the emergency planning requirements of 10 CFR 70.22(i) as they.

1 refer to onsite planning and notification procedures.

Westinghouse shall make no chance in the Site Emergency i

Plan that would decrease the response effectiveness of the Plan without prior Commission approval as evidenced _by a license amendment.

Westinghouse may make changes to-the-Site Emergency Plan without prior Commission approval - if-the changes do not decrease-the response effectiveness of=

the Plan.

Westinghouse shall H

Docket No. 70-1151 Initial Submittal Date:

4/30/83 Page No.2.5-l' License No. SNM-1107 Revision Submittal Date:

1/20/93 Revision No. 24 l

1o U