ML20127P283
| ML20127P283 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 02/28/1976 |
| From: | Mayer L, Shamla W NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| NUDOCS 9212020178 | |
| Download: ML20127P283 (4) | |
Text
_ - - - _ - _ - _ - - - - _ _ _ - - _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _
?
NORTHERH STATE 5 POWER COMPANY ueNNsapou e. uewwa eota menos
""p""~
474g Al 1),g 9
Director, Office of Inspection and Enforcement U S fluclear Regulatory Conrnission 4
d Washington, DC 20555
Dear Sir:
MONTICELID UUCIIAR CENERATING PIMIT Docket No. 50-263 1.icense No. DPR-22 8
Monthly Operating Report February 1976 Attached are ten copics of the Monthly Operating Report for February 1976 f or the Monticello Nuclear Generating Plant.
Yours very truly, L 0 Mayer, PE Manager of Nucicar Support Servicen IDM/ak cc:
Director, IE-III, USNRC (1)
Director, itIPC, USNRC (2) 2527
?"!%eoaE0ERliggjg,
4 e OPERATING DATA REPORT 50-265 00crEi No UfJIT 1_
D ATE Jhrch.1,1076 COMPLETED Dy W. A. Shamla TEitPHONE 6L2/295-5151 l
h t. III i
OPE FI ATING ST ATUS Tchrtlarv Gnoss HOuns tN A(POnTiNG Ptn OD 696 ntPon1:NG PtnioD 64 b35
? CisqRENTLY AU THOnittD POWE 81 LEVF L (MWti.
M AX. DEPEND C APACITY (MWe Neo-Of SIG'J LLICT niCAI n ATING (MWe Neti
.7 3 POWFn LEVE t TO WHICH nf STHICTFD OF ANY) iMWe Neo idg\\
4 nE ASONS FOA nf $TniCTION (IF ANYL THIS MONTH Yn TO DATE CUMULAftVE 502.5 1,24,6.5 31,,095.1 s Nuvern Or unons nrAcTOn WAs enmeAt 0
0 94 0.7
- r. nr ACTon nES(nVE CHUTDOWN HOVns i Houns atNtn Aton oN uNE
. __400..B 1.204.8 20,942.0 8 UNIT nf $Envf f wuTDOWN HOUnS
.Q 0
0 9 cnors 1Htnuat rNonGv atNin ATtD iMWHi 741 RE L967.,822.4 52.2.81,060 2 to. Gnoss t LrcinicAL FNinGY GENER ATED tVWH).
Em7dO_
676.6 0 15.147,670 ii. NrT roCTAICAL ENCnGY GEN [n ATCD IVWHI
.b2hb fd0,944 14.471,036 2=2%
b6.hk 76.0%
- 12. nt AcTOn sEnvlCE F ACTOR is nf ACTOn AVAIL AHILITY F ACTOn 72 2%
06.b$
78.3$
14 unit sto vier r Acon 6f d 85.71 73.2%
is unit AvaitAsiv v r AcTOn
_06.2%
R3.7%
73.2%
16 UNIT CAPACITY F ACTOn tusing MDC) 65.8%
R4.0L 65.7%
17, UNIT C APACITY F ACTOn iveng Det.gn MWel 64J%
R2.Ot 64,$%
18 UNIT IOPcED OUTAGE n ATE 0 O%
0.0$
11.0%
10 SHUTDOWNS SCHEDULEO OVER NtxT 6 MONTkS (TYPC DATE. AND DURATION OF E ACHL 70 IF $ HUT DOWN AT END Or F1EPOnT PERIOD ESTIMATf O DATF Of $T ARTUP:
3/2/7.h
?1. UN!TS IN TEST ST ATUS (PntOn TO COMM(nCI AL OPFn ATIONI.
F On EC AST ACHIFVED INITI AL CRITIC ALITY INtTIAL ELrCintCITY COMMEnCI AI OPEn ATION d
,. +.
,--ve-
i i
.l
+
1 50-263 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME h tirclin DATE M2rch 1, 1976 COMPLETED BY h'. A. Sintula REPORT MONTil Februarv TELEPIIONE 612/295-5151 f
METHOD OF l
TYPE SHUTTING DOWiJ F. FORCED
. DUR ATION THE REACTOR OR NO.
DATE S; SCHEDULED (HOURSI RE ASON (1)
REDUCING POWER (2)
CORRECTIVE ACTIONS
- COMMENTS 5
760220 S
235.2 B
1 Otitage 5:itethiled to Repair Leak On
' A" Peactor Relief Valve and tO Renair 50. 12 Reactor Recirc Plc,p Uppe r Scal.
)
i l
l (1)
REASON (2)
METitOD A: EQUIPMENT E AILURE (EXPLAIN) 1: MANUAL B. MAINT.OR TEST
- 2. MANUAL 5 CRAM C: REFUELING 3 AUTOMATIC $ CRAM D: REGULATORY RESTRICTION 4 OTHER (EXPLAIN)
=
E: OPERATOR TRAINING AND LICLNSE EXAMIN ATION F: ADMINISTRAT1VE G OPERATIONAL ERROR tEXPLAIN)
H. OTHER f EXPLAIN)
SUMMARY
Operated as_ Base Loaded Unit i
a..*
AVER AGF DA'lY llNIT POWER LEVEL 50-263
()OCK!!T NO.
tlNIT I
DATii 3/1/76 COMPLl!TliD fly W. A. Shamla TE! EPilONE 612-295-51(1 MONTil February 1976 DAY AVERAGE DAILY POWFR LEVEL DAY AVER AGE DAILY POWER LEVEL 1MWe NeiI (MWe-NcD 1
525 17 557 2
18 552 l
552 552 3
19 516 554 20 L
4 552 5
,4 6
553 22
-4 560 23
-6 506 8
24
-5 9
25
- 4 to 554 26
-5 m,
555
-5 11 27 550
-5 12 2a
-5 13 554 29 14 505 3
15 490 33 16 548-i
..