Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D1261999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Monticello Nuclear Generating Plant.With ML20216E7031999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Monticello Nuclear Generating Plant.With ML20210Q6611999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Monticello Nuclear Generating Plant.With ML20209F7901999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Monticello Nuclear Generating Plant.With ML20195H0351999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Monticello Nuclear Generatintg Plant.With ML20206N1721999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Monticello Nuclear Generating Plant.With ML20205P5701999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Monticello Nuclear Generating Plant.With ML20205G7391999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Monticello Nuclear Generating Plant.With ML20199F6211998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Mngp.With ML20198B2531998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Monticello Nuclear Generating Plant.With ML20195D2381998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Monticello Nuclear Generating Plant.With ML20154L3471998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Monticello Nuclear Generating Plant.With ML20153B0861998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Monticello Nuclear Generating Plant.With ML20237B8461998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Monticello Nuclear Generating Plant ML20236R1941998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Monticello Nuclear Generating Plant ML20249A5861998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Monticello Nuclear Generating Plant ML20247K3971998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Monticello Nuclear Generating Plant ML20217F6431998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Monticello Nuclear Generating Plant ML20216H6481998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Monticello Nuclear Generating Plant ML20203B2821998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Monticello Nuclear Generating Station ML20198P2201997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Monticello Nuclear Generating Plant ML20203J7131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Monticello Nuclear Generating Plant ML20199H8181997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Monticello Nuclear Generating Plant ML20217K2081997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Monticello Nuclear Generating Plant ML20216H7771997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Monticello Nuclear Generating Plant ML20217K2741997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Monticello Nuclear Generating Plant ML20149E2921997-06-30030 June 1997 Monthly Operating Rept for June 1997 for MNGP ML20141C2841997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Monticello Nuclear Generating Plant ML20137W2621997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Monticello Nuclear Generating Plant ML20136H1671997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Monticello Nuclear Generating Plant ML20134M7071997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Monticello Nuclear Generating Plant ML20133J1401996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Monticello Nuclear Generating Plant ML20132A8771996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Monticello Nuclear Generating Plant ML20134L2761996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Monticello Nuclear Generating Plant ML20128Q7831996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Monticello Nuclear Generating Plant ML20117M8161996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Monticello Nuclear Generating Plant ML20116M2991996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Monticello Nuclear Generating Plant ML20115H5651996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Monticello Nuclear Generating Plant ML20112J1921996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Monticello Nuclear Generating Plant ML20112A3121996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Monticello Nuclear Generating Plant ML20107E9831996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Monticello Nuclear Generating Plant ML20106H0591996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Monticello Nuclear Generating Plant ML20100G5031996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Monticello Nuclear Generating Plant ML20096C8061995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Monticello Nuclear Plant ML20095G0231995-11-30030 November 1995 Monthly Operating Rept for Nov 1997 for Monticello Nuclear Generating Plant ML20094L1921995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Monticello Nuclear Generating Plant ML20093E6241995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Monticello Nuclear Generating Plant ML20092F4121995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Monticello Nuclear Generating Plant ML20087H3011995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for Monticello Nuclear Generating Plant ML20086K1731995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Monticello Nuclear Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D1261999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Monticello Nuclear Generating Plant.With ML20216E7031999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Monticello Nuclear Generating Plant.With ML20210Q0521999-08-0404 August 1999 Safety Evaluation Approving Relief Request 10 to License DPR-22 Per 10CFR50.55a(g)(6)(i).Inservice Exam for Relief Request 10,Parts A,B,C,D & E Impractical & Reasonable Assurance of Structural Integrity Provided ML20210Q6611999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Monticello Nuclear Generating Plant.With ML20209F7901999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Monticello Nuclear Generating Plant.With ML20195H0351999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Monticello Nuclear Generatintg Plant.With ML20206N1721999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Monticello Nuclear Generating Plant.With ML20205N0861999-04-12012 April 1999 Safety Evaluation Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20205P5701999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Monticello Nuclear Generating Plant.With ML20204H4951999-03-18018 March 1999 SER Concluding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Monticello.Therefore Staff Concludes Licensee Adequately Addressed Action Required in GL 96-05 ML20205G7391999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Monticello Nuclear Generating Plant.With ML20202F7901999-01-25025 January 1999 1999 Four Year Simulator Certification Rept for MNGP Simulation Facility ML20199E4871999-01-0606 January 1999 SER Accepting Licensee 951116,960214 & 0524 Responses to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode ML20199F6211998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Mngp.With ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20198P0691998-12-28028 December 1998 Safety Evaluation Concluding That NSP Proposed Alternative to Paragraph III-3411 of App III to 1986 Edition of Section XI of ASME Code Provides Acceptable Level of Quality & Safety.Alternative Authorized ML20198D0751998-12-10010 December 1998 Safety Evaluation Supporting NSP Proposed Change to EOPs to Use 2/3 Core Height as Potential Entry Condition Into Containment Flooding ML20198B2531998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Monticello Nuclear Generating Plant.With ML20195E3691998-11-12012 November 1998 Safety Evaluation Concluding That Licensee USI A-46 Implementation Has Met Purpose & Intent of Criteria in GIP-2 & Staff Sser 2 for Resolution of USI A-46 ML20195D2381998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Monticello Nuclear Generating Plant.With ML20198J4451998-10-22022 October 1998 Rev 2 to SIR-97-003, Review of Test Results of Two Surveillance Capsules & Recommendations for Matls Properties & Pressure-Temp Curves to Be Used for Monticello Rpv ML20154L3471998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Monticello Nuclear Generating Plant.With ML20153F0511998-09-21021 September 1998 Rev 2 to MNGP Colr,Cycle 19 ML20153E9361998-09-0808 September 1998 Rev 1 to MNGP Colr,Cycle 19 ML20153B0861998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Monticello Nuclear Generating Plant.With ML20237B8461998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Monticello Nuclear Generating Plant ML20236W5041998-07-21021 July 1998 ISI Exam Summary Rept - Refueling Outage 19 ML20236R1941998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Monticello Nuclear Generating Plant ML20249A5861998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Monticello Nuclear Generating Plant ML20247K3971998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Monticello Nuclear Generating Plant ML20217D8731998-04-13013 April 1998 Rev 0 to MNGP Colr,Cycle 19 ML20217F6431998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Monticello Nuclear Generating Plant ML20216D1041998-03-0505 March 1998 Rev 21 to Operational QA Plan ML20216H6481998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Monticello Nuclear Generating Plant ML20203G1431998-02-10010 February 1998 Rev 2 to Inservice Insp Exam Plan,Third Interval,920601- 020531 ML20203B2821998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Monticello Nuclear Generating Station ML20202F9161998-01-29029 January 1998 Special Rept:On 980128,two of Three Fire Protection Pumps Were Removed from Svc as Result of Sys Configuration Necessary to Support Planned Maintenance.Fire Pumps Were Returned to Svc on 980128 ML20216D2071997-12-31031 December 1997 1997 Annual Rept for Northern States Power Co ML20197J8131997-12-31031 December 1997 Revised Evacuation Time Estimates for Plume Exposure Pathway Emergency Planning Zone at Monticello Nuclear Power Plant. W/One Oversize Drawing ML20198P2201997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Monticello Nuclear Generating Plant ML20203J7131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Monticello Nuclear Generating Plant ML20199G7051997-11-19019 November 1997 Safety Evaluation Authorizing Relief Request 8 of Third 10 Yr Inservice Insp Interval ML20199H8181997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Monticello Nuclear Generating Plant ML20217K2081997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Monticello Nuclear Generating Plant ML20216H7771997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Monticello Nuclear Generating Plant ML20217K2741997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Monticello Nuclear Generating Plant ML20196H1081997-07-0808 July 1997 Rev 20 to Operational QA Plan ML20141B9271997-06-30030 June 1997 LOCA Containment Analyses for Use in Evaluation of NPSH for RHR & Core Spray Pumps ML20149E2921997-06-30030 June 1997 Monthly Operating Rept for June 1997 for MNGP ML20148S6341997-06-23023 June 1997 NPSH - Rept of Sulzer Bingham Pump 1999-09-30
[Table view] |
Text
_ - - - _ - _ - _ - - - - _ _ _ - - _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _
?
NORTHERH STATE 5 POWER COMPANY ,
ueNNsapou e. uewwa eota menos 474g Al
""p""~ ,-
9 Director, Office of 1),g Inspection and Enforcement U S fluclear Regulatory Conrnission 4 d Washington, DC 20555
Dear Sir:
MONTICELID UUCIIAR CENERATING PIMIT Docket No. 50-263 1.icense No. DPR-22 8
Monthly Operating Report February 1976 Attached are ten copics of the Monthly Operating Report for February 1976 f or the Monticello Nuclear Generating Plant.
Yours very truly, L 0 Mayer, PE Manager of Nucicar Support Servicen IDM/ak cc: Director, IE-III, USNRC (1)
Director, itIPC, USNRC (2) 2527
? *
"!%eoaE0ERliggjg,
OPERATING DATA REPORT 00crEi No 50-265 UfJIT 1_
D ATE Jhrch.1,1076 COMPLETED Dy W. A. Shamla TEitPHONE 6L2/295-5151 l h t. III i OPE FI ATING ST ATUS ntPon1:NG PtnioD Tchrtlarv Gnoss HOuns tN A(POnTiNG Ptn OD 696
? CisqRENTLY AU THOnittD POWE 81 LEVF L (MWti. 64 M AX. DEPEND C APACITY (MWe Neo- b35 Of SIG'J LLICT niCAI n ATING (MWe Neti .7 3 POWFn LEVE t TO WHICH nf STHICTFD OF ANY) iMWe Neo idg\
4 nE ASONS FOA nf $TniCTION (IF ANYL THIS MONTH Yn TO DATE CUMULAftVE s Nuvern Or unons nrAcTOn WAs enmeAt 502.5 1,24,6.5 31,,095.1
- r. nr ACTon nES(nVE CHUTDOWN HOVns 0 0 94 0.7 i Houns atNtn Aton oN uNE . __400..B 1.204.8 20,942.0 8 UNIT nf $Envf f wuTDOWN HOUnS - .Q 0 0 9 cnors 1Htnuat rNonGv atNin ATtD iMWHi 741 RE L967.,822.4 52.2.81,060 2 to. Gnoss t LrcinicAL FNinGY GENER ATED tVWH) . Em7dO_ 676.6 0 15.147,670 ii. NrT roCTAICAL ENCnGY GEN [n ATCD IVWHI .b2hb fd0,944 14.471,036
- 12. nt AcTOn sEnvlCE F ACTOR 2=2% b6.hk 76.0%
is nf ACTOn AVAIL AHILITY F ACTOn 72 2% 06.b$ 78.3$
14 unit sto vier r Acon 6f d 85.71 73.2%
is unit AvaitAsiv v r AcTOn _06.2% R3.7% 73.2%
16 UNIT CAPACITY F ACTOn tusing MDC) .. 65.8% R4.0L 65.7%
17, UNIT C APACITY F ACTOn iveng Det.gn MWel 64J% R2.Ot 64,$%
18 UNIT IOPcED OUTAGE n ATE .. 0 O% 0.0$ 11.0%
10 SHUTDOWNS SCHEDULEO OVER NtxT 6 MONTkS (TYPC DATE. AND DURATION OF E ACHL 70 IF $ HUT DOWN AT END Or F1EPOnT PERIOD ESTIMATf O DATF Of $T ARTUP: 3/2/7.h
?1. UN!TS IN TEST ST ATUS (PntOn TO COMM(nCI AL OPFn ATIONI. F On EC AST ACHIFVED INITI AL CRITIC ALITY INtTIAL ELrCintCITY COMMEnCI AI OPEn ATION d
+
.l DOCKET NO. 50-263 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME h tirclin DATE M2rch 1, 1976 COMPLETED BY h'. A. Sintula REPORT MONTil Februarv TELEPIIONE 612/295-5151 f METHOD OF l TYPE SHUTTING DOWiJ F. FORCED . DUR ATION THE REACTOR OR NO. DATE S; SCHEDULED (HOURSI RE ASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS
- COMMENTS 5 760220 S 235.2 B 1 Otitage 5:itethiled to Repair Leak On
' A" Peactor Relief Valve and tO Renair 50. 12 Reactor Recirc Plc,p Uppe r Scal .
(1) REASON (2) METitOD A: EQUIPMENT E AILURE (EXPLAIN) 1: MANUAL B. MAINT.OR TEST 2. MANUAL 5 CRAM C: REFUELING 3 AUTOMATIC $ CRAM
= D: REGULATORY RESTRICTION 4 OTHER (EXPLAIN)
E: OPERATOR TRAINING AND LICLNSE EXAMIN ATION F: ADMINISTRAT1VE G OPERATIONAL ERROR tEXPLAIN)
H. OTHER f EXPLAIN)
SUMMARY
- Operated as_ Base Loaded Unit
a . .*
AVER AGF DA'lY llNIT POWER LEVEL 50-263
()OCK!!T NO.
tlNIT I DATii 3/1/76 COMPLl!TliD fly W. A. Shamla TE! EPilONE 612-295-51(1 MONTil February 1976 DAY AVERAGE DAILY POWFR LEVEL DAY AVER AGE DAILY POWER LEVEL 1MWe NeiI (MWe-NcD 1 525 17 557 2 552 18 552 l 3
552 516 19 4 554 20 L 5
552 ,, ,4 ;
6 553 22 -4 !
- 560 23 -6 8 506 24 -5 9 25 *4 to 554 26 -5 m, _
11 555 27 -5 12 550 2a
-5 554 -5 13 29 14 505 3 15 490 33 16 548-i
..