ML20127P283

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1976 for Monticello Nuclear Generating Plant
ML20127P283
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/28/1976
From: Mayer L, Shamla W
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 9212020178
Download: ML20127P283 (4)


Text

_ - - - _ - _ - _ - - - - _ _ _ - - _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _

?

NORTHERH STATE 5 POWER COMPANY ueNNsapou e. uewwa eota menos

""p""~

474g Al 1),g 9

Director, Office of Inspection and Enforcement U S fluclear Regulatory Conrnission 4

d Washington, DC 20555

Dear Sir:

MONTICELID UUCIIAR CENERATING PIMIT Docket No. 50-263 1.icense No. DPR-22 8

Monthly Operating Report February 1976 Attached are ten copics of the Monthly Operating Report for February 1976 f or the Monticello Nuclear Generating Plant.

Yours very truly, L 0 Mayer, PE Manager of Nucicar Support Servicen IDM/ak cc:

Director, IE-III, USNRC (1)

Director, itIPC, USNRC (2) 2527

?"!%eoaE0ERliggjg,

4 e OPERATING DATA REPORT 50-265 00crEi No UfJIT 1_

D ATE Jhrch.1,1076 COMPLETED Dy W. A. Shamla TEitPHONE 6L2/295-5151 l

h t. III i

OPE FI ATING ST ATUS Tchrtlarv Gnoss HOuns tN A(POnTiNG Ptn OD 696 ntPon1:NG PtnioD 64 b35

? CisqRENTLY AU THOnittD POWE 81 LEVF L (MWti.

M AX. DEPEND C APACITY (MWe Neo-Of SIG'J LLICT niCAI n ATING (MWe Neti

.7 3 POWFn LEVE t TO WHICH nf STHICTFD OF ANY) iMWe Neo idg\\

4 nE ASONS FOA nf $TniCTION (IF ANYL THIS MONTH Yn TO DATE CUMULAftVE 502.5 1,24,6.5 31,,095.1 s Nuvern Or unons nrAcTOn WAs enmeAt 0

0 94 0.7

r. nr ACTon nES(nVE CHUTDOWN HOVns i Houns atNtn Aton oN uNE

. __400..B 1.204.8 20,942.0 8 UNIT nf $Envf f wuTDOWN HOUnS

.Q 0

0 9 cnors 1Htnuat rNonGv atNin ATtD iMWHi 741 RE L967.,822.4 52.2.81,060 2 to. Gnoss t LrcinicAL FNinGY GENER ATED tVWH).

Em7dO_

676.6 0 15.147,670 ii. NrT roCTAICAL ENCnGY GEN [n ATCD IVWHI

.b2hb fd0,944 14.471,036 2=2%

b6.hk 76.0%

12. nt AcTOn sEnvlCE F ACTOR is nf ACTOn AVAIL AHILITY F ACTOn 72 2%

06.b$

78.3$

14 unit sto vier r Acon 6f d 85.71 73.2%

is unit AvaitAsiv v r AcTOn

_06.2%

R3.7%

73.2%

16 UNIT CAPACITY F ACTOn tusing MDC) 65.8%

R4.0L 65.7%

17, UNIT C APACITY F ACTOn iveng Det.gn MWel 64J%

R2.Ot 64,$%

18 UNIT IOPcED OUTAGE n ATE 0 O%

0.0$

11.0%

10 SHUTDOWNS SCHEDULEO OVER NtxT 6 MONTkS (TYPC DATE. AND DURATION OF E ACHL 70 IF $ HUT DOWN AT END Or F1EPOnT PERIOD ESTIMATf O DATF Of $T ARTUP:

3/2/7.h

?1. UN!TS IN TEST ST ATUS (PntOn TO COMM(nCI AL OPFn ATIONI.

F On EC AST ACHIFVED INITI AL CRITIC ALITY INtTIAL ELrCintCITY COMMEnCI AI OPEn ATION d

,. +.

,--ve-

i i

.l

+

1 50-263 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME h tirclin DATE M2rch 1, 1976 COMPLETED BY h'. A. Sintula REPORT MONTil Februarv TELEPIIONE 612/295-5151 f

METHOD OF l

TYPE SHUTTING DOWiJ F. FORCED

. DUR ATION THE REACTOR OR NO.

DATE S; SCHEDULED (HOURSI RE ASON (1)

REDUCING POWER (2)

CORRECTIVE ACTIONS

  • COMMENTS 5

760220 S

235.2 B

1 Otitage 5:itethiled to Repair Leak On

' A" Peactor Relief Valve and tO Renair 50. 12 Reactor Recirc Plc,p Uppe r Scal.

)

i l

l (1)

REASON (2)

METitOD A: EQUIPMENT E AILURE (EXPLAIN) 1: MANUAL B. MAINT.OR TEST

2. MANUAL 5 CRAM C: REFUELING 3 AUTOMATIC $ CRAM D: REGULATORY RESTRICTION 4 OTHER (EXPLAIN)

=

E: OPERATOR TRAINING AND LICLNSE EXAMIN ATION F: ADMINISTRAT1VE G OPERATIONAL ERROR tEXPLAIN)

H. OTHER f EXPLAIN)

SUMMARY

Operated as_ Base Loaded Unit i

a..*

AVER AGF DA'lY llNIT POWER LEVEL 50-263

()OCK!!T NO.

tlNIT I

DATii 3/1/76 COMPLl!TliD fly W. A. Shamla TE! EPilONE 612-295-51(1 MONTil February 1976 DAY AVERAGE DAILY POWFR LEVEL DAY AVER AGE DAILY POWER LEVEL 1MWe NeiI (MWe-NcD 1

525 17 557 2

18 552 l

552 552 3

19 516 554 20 L

4 552 5

,4 6

553 22

-4 560 23

-6 506 8

24

-5 9

25

  • 4 to 554 26

-5 m,

555

-5 11 27 550

-5 12 2a

-5 13 554 29 14 505 3

15 490 33 16 548-i

..