Summary of ACRS Subcommittee on Quality & QA in Design & Const 850103 Meeting in Washington,Dc Re Review of Reg Guide 1.28,Rev 3, QA Program Requirements, for Approval & Integrated Design Insp Program & Idvp
ML20127N361
Person / Time
Issue date: 03/12/1985
From:
Advisory Committee on Reactor Safeguards
To:
Advisory Committee on Reactor Safeguards
References
RTR-REGGD-01.028, RTR-REGGD-1.028 ACRS-2268, NUDOCS 8505230502
Download: ML20127N361 (12)


Text

,

pas- ana A )DDROf/3b' yngrm'PPI l', ) CERTIFIED COPY

, 3 DATE ISSUED: MAR. 12, 1985

) QN M MINUTES OF THE MEETING 0F THE ACRS SUBCOMMITTEE ON QUALITY AND QUALITY ASSURANCE IN DESIGN AND CONSTRUCTION JANUARY 3, 1985 A meeting was held by the ACRS Subcommittee on Quality and Quality Assurance in Design and Construction at 1717 H Street, Washington, D.C.,

Room 1167. The purposes of this meeting were 1) to review Regulatory Guide 1.28, Revision 3, " Quality Assurance Program Requirements (Design and Construction)," for final approval; 2) to discuss NRC/IE's Inte-grated Design Inspection Program and the Independent Design Verification Program; 3) to review the Quality Assurance research effort for input into the ACRS Report to the Congress on Reactor Safety Research; and 4) to discuss the QA program plan, a three-year plan for NRC QA/QC initiatives. (The discussion of the QA program plan was deferred.)

Notice of this meeting was published in the Federal Register on Friday, December 21, 1984 (Attachment A). The schedule of items covered at this meeting is in Attachment B. Attachment C is a list of the meeting hand-outs which are in the ACRS office files. Portions of this meeting that dealt with the proposed NRC research budget for FY 1986 were closed.

Such discussions if held in public session might result in premature disclosure of information which would, in turn, frustrate the Comis-sion's ability to implement the affected programs effectively.

Mr. Richard Major was the cognizant ACRS staff member present for the meeting.

Attendees:

ACRS NRC Staff F. Remick, Chairman J. Partlow D. Norkin D. Ward, Member J. Milhoan T. Ankrum -

C. Michelson, Member G. Lewis W. Altman G. Reed, Member R. Parkhill W. Brach C. Seiss, Member H. Wang W. Belke R. Major. Staff E. Imbro M. Malloy R. Architzel W. Menczer 52 2 850312 DESICHATED ORIGINAI) 68 m certi+1ed By  %

QUALITY / QUALITY ASSURANCE 2 January 3, 1985 Meeting Others

.S. Watson, Bechtel J. Abelee, DiBenedetto Associates N. Suttora, AIF T. Degaleo, WESTEC SVCS, Inc.

G. Overbeck, "

J. Richardson, NUS Corp.

C. Crane, WESTEC Services Corp.

R. Raczyinski, U.S. Department of Energy J. McEven, Jr. , TGI R. Boyd, KMC A. Bivens, AID C. Ader, SWEC L. Waibel, ACE-Fed Reporters D. Kansal, Bechtel T. Houghton, KMC P. Docherty, Westinghouse P. Telthorst, IPC Discussions of Regulatory Guide 1.28, Revision 3, " Quality Assurance Program Requirements (Design and Construction)"

The Subcommittee reviewed Reg. Guide 1.28, Revision 3, " Quality Assurance Program Requirements (Design and Construction)," for final approval. The Subcommittee will recommend this guide be approved. The Guide endorses ANSI /ASME NQA-1-1983 with supplementary positions.

The guide has three regulatory positions. Position 1 deals with qualification of inspection and test personnel. It provides supplementary guidance on education and experience requirements.

Position 2 concerns quality assurance records; it provides standardized retention times (listed in table one at the back of the guide) and definitions of records. Position 3 addresses audits. It specifies frequencies for internal and external audits.

1 This is a forward fit guide; however, the Staff expects a lot of l voluntary acceptance of this guide by utilities. The present three regulatory positions represent a change from the previous 21 positions in earlier drafts, and reflect closer Staff and industry coordination.

I

QUALITY / QUALITY ASSURANCE 3 January 3, 1985 Meeting Discussion of Integrated Design Inspection Program and Independent Design Verification Program i

The Integrated Design Inspection (IDI) and Independent Design Verification Program (IDVP) were discussed. The IDI is a direct inspection by the NRC Staff. The Staff is able to perform about three IDIs per year. The IDVP is'a third party review that is independent of the applicant's other programs. As a result of the Diablo Canyon

" mirror image" mistake, the Staff is requiring this additional assurance that plant designs meet the FSAR and Applicant Commitments. The performance of an IDI or IDVP is determined on a case-by-case basis.

Although there is no legal requirement to perform an IDI or IDVP, such a program improves the ease of the licensing process.

IDIs are performed by a team of from 10-15 NRC inspectors with contractor assistance. The inspections address five disciplines:

mechanical systems, mechanical components, civil / structural, electric power, and instrumentation and controls. The inspections emphasize the implementation of FSAR commitments, technical adequacy of design documents, design interface control, and design change control. The Staff involvement includes inspection preparation. Direct inspections are conducted at applicant's offices, the construction site, 4/E Offices (where most of the time is spent), NSSS Offices, and subcontractor

. offices. The Staff prepares inspection reports and follow-up of the inspection report findings. The IDI process takes about four months.

Members of the IDI teams are well qualified with many years of nuclear power plant experience. The experience includes A/E and NSSS design ,

work.

l The IDVP is essentially the same as the IDI except that an independent I contractor (a third party) is picked by the applicant to perform the  !

tt QUALITY / QUALITY ASSURANCE 4 January 3, 1985 Meeting program. The Staff reviews the selection of the independent contractor, the program review plan, plan implementation, the completed report, the applicant's response to review findings, and prepares a safety evaluation report.

The IE review of IDVP reports includes: an assessment of the depth of the independent review, a determination that the generic implications of findings have been properly addressed for systems outside the IDVP.

scope, a review of the implementation schedule for corrective actions, determination of whetherl corrective action plans are adequate, and review of findings to discuss any trends indicative of problems with the design process.

Quality Assurance Program Plan The' Subcommittee decided to defer discussion of the QA Program Plan until a later date.

Review of the Ouality Assurance Research Effort Due to the modest size of the QA Research effort, the Subcommittee decided not to include comments on this effort in the annual report to Congress on the Safety Research Program.

QA Effectiveness Research has been conducted to determine the costs and benefits associated with QA Programs and Activities. It is attempting to quantify the relationships between quality, quality assurance, and safety. (For several years the ACRS has been interested in ways to measure the benefit of QA activities.) The projects conducted to ,

evaluate QA effectiveness faced the following limitations: the effect of QA activities alone is hard to isolate, especially when QA is highly integrated with plant operating procedures and there are no generally accepted approaches for quantifying QA effectiveness, and there is

O.

QUALITY / QUALITY ASSURANCE 5 January 3, 1985 Meeting.

incompleteness and inconsistency of data sources. In the limited research results reported on, there was no statistically significant difference in performance between safety grade and nonsafety grade components.

Research in Systems Assurance Analyses (SAA) is designed to examine new techniques to improve the basis for the "Q-List," those items that must

. . meet 10 CFR 50 Appendix B requirements. SAA attempts to provide a structured basis for identifying systems and subsystems which have a safety'effect and which require the application of quality requirements.

This program is ongoing.

~

J

. Research is underway to ~use _PRA to establish quality program applicability. It examines expanding uses of existing PRAs to_ identify and provide relative ranking of safety equipment and operator actions.

This effort will be used to improve the "Q-List." All equipment is ranked according to its safety significance in preventing and mitigating internal events using PRA fault-trees and event-trees. A second pass considers special emergencies (external events). Results of the two passes are combined to provide relative, plant-specific rankings of equipment activities. This program is ongoing.

An effort-is being conducted to determine the scope and significance of the problem of unqualified QA/QC personnel performing quality functions

- in the nuclear industry. The work in Oualification/ Certification of QA/QC personnel is to determine the causes of the problems and recommend solutions commensurate with the significance of the problems identified.

A research effort is underway on the future nature of the r.uclear ,

industry. Its purpose is to determine the changes which are likely to occur in the nuclear industry during the period of 1985-1995. The quality implications of the changing utility-contractor-vendor-supplier infrastructure are the focus of the study. The goal is to project how

- . - - , - ~ . . , - - +.. ,---.,-,+-,.,-,,.-...,.,~,,,,--,y.---~+-..,,w,- ------m- - - , - --

QUALITY / QUALITY ASSURANCE 6 January 3, 1985 Meeting these changes may impact the NRC's activities in helping maintain adequate levels of quality and quality assurance in the nuclear industry..

Future Meeting:

Regulatory Guide 1.28 will be presented to the full Committee on Thursday, January 10,1985 at 9:00 A.M. for approval.

NOTE: A complete transcript of the open meeting is on file at the NRC Public Document Room at 1717 H St., N.W., Washington, DC, or can be obtained at cost from Ace-Federal Reporters, Inc., 444 N. Capitol Street, Washington, DC 20001 [ Telephone (202) 347-3700].

Federal Register / Vol. 49. No. 247 / Friday, DectmbIr 21, 1964 / N:tices #739 i  ;

l a Advisory Committee on Reector obtained by a prepaid telephone call to 1 January 8,1985. Room 1048,1717 H Street. NW, Washington, D.C. Safeguards, Subcommittee on Reactor the cognizant ACRS staff member.Mr.

s Operations; Meeting Richard Major (telephone 202/634-1413) g The entire meeting will be open to between 8:15 a.m. and 5.130 p.m EST.

T  ;

Public attendance. . The ACRS Subcommittee on Reactor Persons planning to attend this meeting The agenda for subject meeting shall Operations will hold a meeting on are urged to contact the above named 9 be as follows: January 9,1985, Room 1048,1717 H individual one or two days before the *

~

Str'eet. NW.W , 9shington, DC. scheduled meeting to be advised of any To:sday January 8.1965-8:30 a.m. until This meetmg will address recent changes in schedule, etc., which may - .  ;

the conclusion of business events at operating nuclear power have occurred.

3 plants, The incidents to be explored 1 >J The Subcommittee will discuss with Dated: December 17,1964. y =

the NRC Staff the severe accident include those noted below,but may also  ;

Morton,W. IAerkin.

include others not as yet determined.

(

research program as described in their Assistant Exeewtive Directorfor Project latest supplement to NUREC400 Should these events involve proprietary T information, safeguards information, or A'"

Oral statements may be presented by g-information submitted in confidence by [FR Doc. 84-33231 Filed 12-30-44: 4 45 am) members of the public with concurrence ma caos res**as q a foreign government it will be of the Subcommittee Chairman; written necessary to close that portion of the g statements will be accepted and made available to the Committee. Recordings n8' pu '

Advisory Committee on Reactor y exten p cti al is ng Safeguards, Subcommittee on Quality will be permitted only during those be open to public attendance and any and Quality Assurance During Design d portions of the meeting when a closed sessions will be held so as to transcript is being kept, and questions and Construction; Meeting ,

minimize inconvenience to members of '

may be asked only by members of the the public.

The ACRS Subcommittee on Quality  :

Subcommittee,its consultants and Staff. The agenda for subject meeting shall a and Quality Assurance During Design Persons desiring to make oral be as follows. . and Construction will hold a meeting on.

statements should notify the ACRS staff Wednesday, Jan uary 9,1985-1:00 p.m. January 3.1985, Room 1167 at 1717 H 3 member named below as fur in advance un e concksion of business Street, NW Washington.DC. I as practicable so that appropriate Portions of this meeting dealing with The Subcommittee will discuss recent arrangements can be made. the proposed NRC Research budget for plant operating experience (includina During the initial portion of the uire upper head injectionlevel FY 1986 will be closed. Such meeting. the Subcommittee, along with , ,

discussions. If held in public session. "4 instrumentation mstallation error of E any ofits consultants who may be October 31.1984, and Catawba's loose might result in the premature disclosure '

present, may exchange preliminary breech guide screws in the control rod ofinformation which would in turn ,3 views regarding matters to be frustrate the Commission's ability to 2 drive system).

considered dunng the balance of the Oral statements may be presented by implement the affected programs  !

mieting. members of the public with the effectively. However, to the extent M The Subcommittee will then hear concurrence of the Subcommittee practical, this meeting will be open to ]

3 presentations by and hold discussions Chairman; written statements will be public attendance and any closed with representatives of the NRC Staff. accepted and made available to the sessions will be held so as to minimize Committee. Recordings will be permitted inconvencience to members of the  ;

! their respective consultants. ind other interested persons regarding this review. only during those portions of the public. .

Further information regarding topics meeting when a transcript is being kept; The agenda for subitct meeting will  !

and questions may be asked only by  ::

to be discussed, whether the meeting be as follows: =

his been cancelled or rescheduled, the members of the Subcommittee,its Thrusday, January 3.1985-d:30 a.m. '

consultants, and Staff. Persons des. .nng l

Chairman's ruling on requests for the to make oral statements should notify untilthe conclusion ofbusiness

opportunity to present oral statements The Subcommittee will review and the ACRS staff member named below as and the time allotted therefore can be far in advance as practicable so that. discuss the following items:(1) -

obtained by a prepaid telephone ca11 t appropriate arrangements can be made. Regulatory Guide 1.28 " Quality ' j the cognizant ACRS staff member Mr. During the initial portion of the Assurance Program Requirements 5 Alan B. Wang (telephone 202/634-32G7) (Design and Construction)." for final  ?

meeting. the Subcommittee, along with between 8:15 a.m. and 5:00 p.m.. EST. any ofits consultants who may be approval:(2) the Quality Assurance ]

Persons planning to attend this meeting present. may exchange preliminary Program Plan:(3) aspects of the Quality _.-

are urged to contact the above named Assurance Branch research program for views regarding matters to be y Individual one or two days before the considered during the balance of the input to the ACRS Report to Congress:

scheduled meeting to be advised of any meeting.The Subcommittee will then and (4) NRC/IE's Integrated Design , -

l changes in schedule, etc., which may hear presentations by and hold Inspection Program and the Integrated discussions with representatives of the Design Verification Program. 5 have occurred. ,

NRC Staff. Subcommittee consultants. Oral statements may be presented by 1 Dated. December 17.190. and other interested persons regarding members of the public with concurrence .

g this review. of the Subcommittee Chairman: written g Further information regarding topics statements will be accepted and made a Morton W. thrkin.

Assistant Executive Directorfor Pmfect to be discussed, whether the meeting available to the Committee. Recordings g has been cancelled or rescheduled, the will be permitted only during those ,

Review.

Chairman's ruling on requests for the portions of the meeting when a  :

3 trR Doc. 64-33228 Fi'ed 124M4; 8.45 am] opportunity to present oral statements transcript is being kept, and questions ~}

and the time allotted therefor can be may be asked only by members of the _

s w mo coes neo w .

. g 4 7pcenf , A E

[]

w k- PROPOSED TOPICS QUALITY AND QUALITY ASSURANCE IN DESIGN AND CONSTRUCTION i SUBCOMMITTEE MEETING i JANUARY 3, 1985 WASHINGTON, DC 8:30 a.m. 1. Chainnan's Introduction 10 min

a. Objectives I
b. Discuss Schedule v 8
40 a.m. 2. Review Reg. Guide 1.28, " Quality 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Assurance Program Requirements y (Design and Construction)"

~

9:40 a.'m. 3. Discuss Integrated Design Inspection li hour l

' , Program and Integrated Design Verification Program

~

10:30 a.m. *** BREAK 10 min ***

' 11:20 a.m. 4. Review the Quality Assurance Research li hour Effort for Input into this year's Report to Congress (Note: Budget Numbers to be discussed at a Closed Session at the End of the t

- Day) 12:00 Noon *** LUHCH 1 hr ***

1:00 p.m. 4. (Continued) Review of the Quality Assurance Research 1:50 p.m. 5. Discuss the QA Program Plan 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> i

      • BREAK 10 min ***

\ 3:00 p.m. l 1

( 4:00 p.m. 6. Discussion of Research Budget 30 mi.i Information - CLOSED SESSION 4:30 p.m. 7. Concluding Remarks 15 min

  • Discuss full Comittee presentation of R.G. 1.28
  • Plans for Research Report
  • Other .

4:45 p.m. ADJOURN quy

=.

I i

., ATTACHMENT C MEETING HANDOUTS JANUARY 3, 1985 MEETING ACRS SUBCOMMITIEE ON QUALITY AND QUALITY ASSURANCE IN DESIGN AND CONSTRUCTION WASHINGTON, DC Sign In Sheets

1. Regulatory Guide 1.28 History / Background - 5 slides
2. Assurance of Quality in Design Implementation - 23 slides
3. Memo for W. Kcrr from S. Duraiswamy,

Subject:

Independent Design Verification Program for Millstone Unit 3, dated December 11, 1984.

4. Quality Assurance Research - 27 slides l

~

a Federal Register / Vol. 49 No. 247 / Friday, December 21, 1964 / Notices 48739

- m Advisory Committee on Reactor obtained by a prepaid telephone call to january 8.1985, Room 1046.1717 H t Street. NW, Washington. D.C. Safeguards, Subcommittee on Reactor the cognizant ACRS staff member, Mr. 4 Operations; Meeting Richard Major (telephone 202/634-1413)

The entire meeting will be open to between 835 a.m. and 5.00 p.m., EST. _=

y 1 P"blic attendance- The ACRS Subcommittee on Reactor Persons planning to attend this meeting The agenda for subject meeting shall Operations will hold a meeting on are urged to contact the above named be as foHows: January 9,1985, Room 1046,1717 H individual one or two days before the 8 ""

Stfeet, NW, W 9shington, DC. scheduled meeting to be advised of any Tuesday, January 8,1985-8;30 a.m. until This meeting will address recent changes in schedule, etc., which may - . ;ia the conclusion of business events at operating nuclear power have occurred.

s 2 The Subcommittee will discuss with plants.The incidents to be explored Datedmecember 17,19s4. 4' h

the NRC Staff the severe accident include those noted below, but may also~

include others not as yet determined. M*"** W M*'ki"-

research program as described in their .

latast supplement to NUREG-0900 Should these events involve proprietary Assistant Executive Directorfor Pm/ect (

information, safeguards information, or Reviem --

Oral statements may be presented by -

information submitted in confidence by (FR Doc. 84-33231 Filed 12-30-e4 a:45 am) cembers of the public with concurrence ausso caos res+es.as  ;

of the Subcommittee Chairman; written a foreign government it will be statements will be accepted and made necessary to close that portion of the _

svailable to the Committee. Recordings meeting to public attendance. However, Re nt et cal h s meet ng will E will be permitted only during those Portions of the meeting when a

{t e and Quality Assurance During Design closed sessions will be held so as to and Construction; Meeung transcript is being kept, and questions m nimize inconvenience to members of _

msy be asked only by members of the the public.

~

The ACRS Subcommittee on Quality  ;

Subcommittee,its consultants, and Staff. The a enda for subject meeung shah and Quality Assurance During Design -;

Persons desiring to make oral b8 88 g *8- and Construction will hold a meeting on.

statements should notify the ACRS staff  ;;;

Wednesday, January 9,1985-1:00 p.m. January 3,1985, Room 1167 at 1717 H member named below as far in advance untilthe conclusion ofbusiness Street, NW., Washington, DC.  %

es practicable so that appropriate The Subcommittee will discuss recent Portions of this meeting dealing with j" arrangements can be made. the proposed NRC Research budget for 1 plant operating experier.ce (including During the initial portion of the hicGuire upper head injection level FY 1986 will be closed. Such j meeting, the Subcommittee, along with ,

instrumentation mstallation error of discussions. if held in pubhc session. -a any ofits consultants who may be October 31,1984, and Catawba's loose might result in the premature disclosure 3 present, may exchange preliminary i bree:h guide screws in the control rod of information which would in turn E views regarding matters to be drive system). frustrate the Commission's ability to considered durmg the balance of the Oral statements may be presented by implement the affected programs 5 meeting. members of the public with the effectively. However, to the extent ,

The Subcommittee will then hear concurrence of the Subcomroittee practical. this meeting will be open to d presentations by and hold discussions Chairman; written statements will be public attendance and any closed q with representatives of the NRC Staff. accepted and made available to the sessions will be held so as to minimize ,

their respective consultants, and other Committee. Recordings will be permitted inconvencience to members of the interested persons regarding this review. only during those portions of the public. .

1 Further information regarding topics meeting when a transcript is being kept The agenda for subject meeting will =

to be discussed, whether the meeting and questions may be asked only by be as follows:

has been cancelled or rescheduled, the members of the Subcommittee,its Thrusday, January 3,1sc5-&Jo a.m. U consultants, and Staff. Persons desiring :_g Chairman's ruling on requests for the to make oral statements should notify y,,jjg3,,,,cfy,j,,,73y,j,,,,

a opportunity to present oral statements The Subcommitt a the ACRS staff member named below as discuss the followm,ee and the time allotted therefore can be far in advance as practicable so that, g items:(1)will review and q; obtained by a prepaid telephone call to appropriate arrangements can be made. Regulatory Guide 1.28, Quality g ihe cognizant ACRS staff member, hir. During the initial portion of the Assurance Program Requirements q Alan B. Wang (telephone 202/634-3207) (Design and Construction)" for final -s between 8:15 a.m. and 5 00 p.m., EST.

meeting. the Subcommittee, along with any of its consultants who may be approvah (2) the Quality Assurance y persons planning to attend this meeting present, may exchange preliminary Program plan:(3) aspects of the Quality y are urged to contact the above named views regarding matters to be Assurance Branch research program for 7s mdividual one or two days before the scheduled meeting to be advised of any considered during the balance of the input to the ACRS Report to Congress; and (4) NRC/IE's Integrated Design fTi chan;;es in schedule, etc., which may meeting. The Subcommittee will then hear presentations by and hold Inspection Program and the Integrated g have occurred. discussions with representatives of the Design Verification Program. , g NRC Staff. Subcommi*.a e consultants. Oral statements may be presented by g Dated: December 17,1984. and other interested pusons regarding members of the public with conccrrence . f of the Subcommittee Chairman: written this review. 2 Further information regarding topics statements will be accepted and made Morton W. Ilbarkin. q to be discussed, whether the meeting available to the Committee. Recordings A ssistant Ex ecutive Directorfor Pm/ect will be permitted only during those M Re iew. has been cancelled or rescheduled the ,

Chairman's ruling on requests for the opportunity to present oral statements portions of the meeting when a transcript is being kept, and questions J

{FR Doc. 64-33228 Fded 12-20-44: 8 45 aml l saumso coct tsoo. ewes . and the time allotted therefor can be may be asked only by members of the , J we 1

-e--

S

8 PROPOSED TOPICS QUALITY AND QUALITY ASSURANCE IN DESIGN AND CONSTRUCTION SUBCOMMITTEE MEETING JANUARY 3, 1985 WASHINGTON, DC 8:30 a.m. 1. Chairman's Introduction 10 min

a. Objectives
b. Discuss Schedule 8:40 a.m. 2. Review Reg. Guide 1.28, " Quality 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Assurance Program Requirements (Design and Construction)"

9:40 a.m. 3. Discuss Integrated Design Inspection li hour Program and Integrated Design Yerification Program 10:30 a.m. *** BREAK 10 min ***

11:20 a.m. 4. Review the Quality Assurance Research 11 hour1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> Effort for Input into this year's Report to Congress (Note: Budget Numbers to be discussed at a Closed Session at the End of the Day) 12:00 Noon '*** LUNCH 1 hr ***

l 1:00 p.m. 4. (Continued) Review of the Quality Assurance Research 1:50 p.m. 5. Discuss the QA Program Plan 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 3:00 p.m. *** BREAK 10 min ***

4:00 p.m. 6. Discussion of Research Budget 30 min Information - CLOSED SESSION I 4:30 p.m. 7. Concluding Remarks 15 min i

  • Discuss full Committee presentation I

of R.G. 1.28

  • Plans for Research Report

!

  • Other .

) 4:45 p.m. ADJOURN l

( 877/h"N/?'EN T I

' - i

t ,. . ATTACHMENT C MEETING HANDOUTS .

JANUARY 3,1985 MEETING ACRS SUBCOMMITTEE ON QUALITY -AND QUALITY ASSURANCE IN DESIGN AND CONSTRUCTION WASHINGTON, DC Sign In Sheets

'1. Regulatory Guide 1.28 History / Background - 5 slides

2. Assurance of Quality in Design Implementation - 23 slides
3. _ Memo for W. Kerr from S. Duraiswamy,

Subject:

Independent Design Verification Program for Millstone Unit 3, dated December 11, 1984.

f

4. Quality Assurance Research - 27 slides 6

O

, , - . - ,. - -, .g.- .- .... - -