ML20127N204

From kanterella
Jump to navigation Jump to search
Forwards Amend 25 to GE Advanced BWR Ssar,Chapter 13,conduct of Operations.Amend Withheld
ML20127N204
Person / Time
Site: 05200001
Issue date: 01/29/1993
From: Marriott P
GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MFN-012-93, MFN-12-93, NUDOCS 9301290129
Download: ML20127N204 (1)


Text

-.

.e

(

GE NucIcar Energy

~

~*

~

8.,o w,

b.

'} l '.

2 e i c':

e r.

MFN No. 012 93 January 29,1993 Docket No. STN 52 001 Document Control Desk m._

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention:

Jerry N. Wilson, Acting Director Standardization Project Directorate

Subject:

Submittal of Amendment 25 to GE's AllWR SSAR, Chapter 13, Conduct of Operations teference:

Submitta! of Ameadment 25 to GE's ABWR SSAR, MFN Nc.

013 93, dated January 29,1993 Enclosed are two copies of a revised portion of Subsection 13.6, PhysicalSecurity of Chapter 13, Conduct oj' Operation, of the Standard Safety Analysis Report (SSAR) for the Advanced Boiling Water Reactor (ABWR). This materialis classified as " Safeguards Information" per 10CFR73.21.-

The modification Io the subsection above provides close out of DFSER COL action items 13.6.2-1,13.6.2-2,13 6.3 1,13.6.3.3 1,13.6.3.3-2,13.6.3.3 3,13.6.3.5-1 and 13.6.3.5 2.

Sincerely, gh 4

P W.,Mahiott, Manager Fa ety & Licensing h1C-444,(408)925 6948 cc:

R. C. Berglund (GE)

T. E. Murley (NRC)

D. M. Crutchfield (NRC)

D. J. McGoff (DOE)

F. J. Miraglia, Jr.

(NRC)

C. Posiusny, J r.

(NRC)

K. E. Stahlkopf (EPRI)

N. D. Fletcher (DOE)

F. A. Ross (DOE)

LikEK9MN

)

{l 9301290129 930129 gm awcxm20gggi s,go, o

i

..