ML20127N204
| ML20127N204 | |
| Person / Time | |
|---|---|
| Site: | 05200001 |
| Issue date: | 01/29/1993 |
| From: | Marriott P GENERAL ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| MFN-012-93, MFN-12-93, NUDOCS 9301290129 | |
| Download: ML20127N204 (1) | |
Text
-.
.e
(
GE NucIcar Energy
~
~*
~
8.,o w,
b.
'} l '.
2 e i c':
e r.
MFN No. 012 93 January 29,1993 Docket No. STN 52 001 Document Control Desk m._
U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention:
Jerry N. Wilson, Acting Director Standardization Project Directorate
Subject:
Submittal of Amendment 25 to GE's AllWR SSAR, Chapter 13, Conduct of Operations teference:
Submitta! of Ameadment 25 to GE's ABWR SSAR, MFN Nc.
013 93, dated January 29,1993 Enclosed are two copies of a revised portion of Subsection 13.6, PhysicalSecurity of Chapter 13, Conduct oj' Operation, of the Standard Safety Analysis Report (SSAR) for the Advanced Boiling Water Reactor (ABWR). This materialis classified as " Safeguards Information" per 10CFR73.21.-
The modification Io the subsection above provides close out of DFSER COL action items 13.6.2-1,13.6.2-2,13 6.3 1,13.6.3.3 1,13.6.3.3-2,13.6.3.3 3,13.6.3.5-1 and 13.6.3.5 2.
Sincerely, gh 4
P W.,Mahiott, Manager Fa ety & Licensing h1C-444,(408)925 6948 cc:
R. C. Berglund (GE)
T. E. Murley (NRC)
D. M. Crutchfield (NRC)
D. J. McGoff (DOE)
F. J. Miraglia, Jr.
(NRC)
C. Posiusny, J r.
(NRC)
K. E. Stahlkopf (EPRI)
N. D. Fletcher (DOE)
F. A. Ross (DOE)
LikEK9MN
)
{l 9301290129 930129 gm awcxm20gggi s,go, o
i
..