7-

=

UNITED STATES e ,

_g NUCLEAR REGULATORY COMMISSION j [ WASHINGTON, D. C. 20555

/ .

f

....... May 22, 1985 LD:cket No. 99900912/85-01 National. Technical Systems.

ATTN: .Mr.- George Dowd

' General Manager

.533 Main Street

'Acton, Massachusetts 01720 Gentlemen:

This refers to-the inspection conducted by Mr. G. T; Hubbard of this office on April 1-5,1985, of your facility at Acton, Massachusetts, and to the discussions of-our findings with you and members of your staff at the conclusion of the inspection.

The purpose 'of this inspection was to perform a technical evaluation of your equipment qualification test activities for. safety-related equipment and evaluate your test data relative to a 10 CFR Part 21 report issued by Anacon concerning-

'the loss of adhesive properties of the epoxy used in the manufacture of Anacon chlorine monitor probes.. Areas examined during the inspection ~and our. findings

. .are discussed in the enclosed report. Within these areas, the inspection.

consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection it was found that the implementation of your QA program

. failed to meet certain NRC requirements. The nonconformances listed in Appendix A are a result of personnel'not following the' requirements of National Technical Systems Quality Assurance. Manual or IEEE-STD-323/1974; such as, listing test.

equipment and their accuracies and proper approval of test report revisions.

.The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.-

Please provide us within 30 days from the date of this letter a written statement containing: '(1) a description of steps that have been or will be taken to-correct these items; (2)-a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed. Consideration may be given to extending your  !

response time for good cause shown.

.The responses requested by this. letter are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

4 f0' '

m T3 12 PDRj 17 's 1900W81M Origiral doeumont not ammiWe to E Oertified 0M Q

< National Technical Systems May 22, 1985 In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, omensat sigue 30 SARY6.2ECH Gary G. Zech, Chief Vendor Program Branch Division of Quality Assurance, Vendor, and Technical Training Center Programs Office of Inspection and Enforcement

Enclosures:

1. Appendix A-Notice of Nonconformance
2. ' Appendix B-Inspection Report 99900912/85-01
3. Appendix C-Inspection Data Sheets (11 pages)

DLSTRIBUTION:

p :IE:09 VPB Reading DQAVT Reading RVollmer JTCollins JStone GHolahan, NRR/0RAB UPotapovs GHubbard RMoist JThomas, DPC.

W PB:)QAVT Uf ff SC/VPB.DQAVT / /VPB:DQAVT :DQAVT Motst: sam @VPB:DQAVT Hubbard UPotapovs GGZech KGrimes 5/g85 \5/t-y85 5/t 5/85 5/M/85 5/ZA/85