Monthly Operating Rept for Sept 1977 for Monticello Nuclear Generating Plant
ML20127N123
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 09/30/1977
From: Mayer L, Shamla W
NORTHERN STATES POWER CO.
To:
NRC
References
NUDOCS 9211300574
Download: ML20127N123 (4)


Text

,

'a e

NSR8

' "n,.

"'"0'Il Ofi 22 C07/

NOMTNEMN 5TATES POWKM COMPANY MINN E APOU S. MINNa moTA seeot

,,A ['

n h

.D - Og. f'd.,@M

" f u i,

/

j:

O si N

%g%gy, e t'

1

,y 9

October 7, 1977 Director, Office of Management Information & Program Control c/o Distribution Services Branch, DDC, ADM U S Nuclear Regulatory Ccanission Washington, DC 20555 Dear Sir MONTICELI4 NUCLEAR CENERATING PIANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report September 1977 Attached are two copics of the Monthly Operating Report for September, 1977 for the Monticello Nuclear Generating Plant.

Yours very truly, e

L 0 Mayer, PE thnager of Nuclear Support Services tom /ak cc: Director, IE, III, USNRC (1) 4--Girector, IE, USNRC (c/o DSB) _ (10)

HPCA Attn: J W Ferman 9211300574 770930 PDR ADOCK 0500 3

772840061 R

2026 Rev. 3 8/13/76 OPERATING IWIA REPORT DOCKET No.

50 263 UNIT 1

DATE OcIrwt 4.1977 C04PLElID BY W. A. SMMIA TELEPIDE 612/295 5151 Ext.111 OPERATING STA11]S 1.

Reporting Period: SEPIIMBER Gross llours in Report Period:

720 2.

Currently Authorized Power Level (hMt):

1670 Max. Depend. Capacity (FMe-NET):

536 Design Electrical-Rating (FMe-Net).

545.4 3.

Power Level to hhich Restricted (if any) (FWe-Net):

un 4.

Reasons for Restriction (if any):

TilIS !Gini YR TO DATE CU5ULATIVE 5.

Number of Ilours Reactor h'as Critical.............__ 214.0 5.874.5 43.950.9 6.

Reactor Reserve Shutdown 11ours.................

0.0 0.0 940.7 7.

llours Generator On Line........................

212.2 5.813.1 42.588;3 8.

Unit Reserve Shutdown llours....................

0.0 _

0.0 0.0 9.

Gross Thennal Energy Generated (FMO.......... 30s 496.4 0;144.04L 6 21;Rnn;771 n

10. Gross Electrical Energy Generated (IMI)....... 103.oAn X;no6,ain

?i ;7An,n1Ln

11. Net Electrical Energy Generated (hM1).......... 97.124-2.963.058

_ 20.770.530

12. Reactor Service Factor.........................

29.7%

89.7%

B0.21

13. Reactor Availability Facto'....................

29.7%-

89.7%

R1.ot

14. Unit Service Factor.............................

29.51, 88.7%

77.7% '

15. Unit Availability Factor.......................

29.sL m

nL1t

16. Unit Capacity Factor (Using 10C)...............

25.7L 84.4%

70.7% !

17. Unit Capacity Factor (Using Design !Me)........

- 24.7%

R2.9%

60.51

18. Unit Forced Outage Rate.......................

0_. 0L

._0,61 A 71 19.

Shutdowns Scheduled over Next 6 Months (Type, Date and Duration of Each): N/A 20.

If Shutdown at End of Report Period, Estimated Date of Startup: October 29. 1977 w.

y

.y-v

--,-,--3,-%-.

-sw----

,,%e..--

.o, 2025 ReV. 0 3/3/76 AVERAGE DAILY UNIT P0hTR LEVEL DOCKET No.

50-263 UNIT

_1 DATE OCE BER 4. 1977 C04PLETED BY W. A. SHAMLA TELEM ONE 612/295-5151 Ext. 111-Mogi SEPTEMBER 1977 DAY AVERAGE DAILY P0h'ER LEVEL DAY AVERAGE IAILY P0h1R LEVEL (Mde-Net)

(hMe-Net) 1

._ 50/,

17

-3

-4 2

4* 1 18 3

385 19

-3 4

441 20

-1 21

-2 5

aos 6

49g 22

-2 23

-3 7

___,4 94 24

-3 8

4g 9

329 25 26 10

.s 11

-4 27

-3 12 4

28

-2 29

-2 13 3

14 3

30

-3 31 15 3

16

-1

(

. 2027 c-Rev.'0 3/3/76 I

DOCET NO.

50-263' UNIT NAME Monticello'-

N I

DATE ncter 3_1977 CGIPIEITD BY W. A. Shamla'-

REPORT f 0NITI SEPTEMBER TELEPIONE 612/295-5151-t Ext. 111 a

I ME1110) OF l

N SlUITING DOWN F: ' FORCED DURATION

'llIE REACTOR OR:

NO.

DATE S: SOIEDULED (110URS)

REASON (1) '

REDUCING FOhTR (2)

CORRILTIVE ACTIONS /COf f4ENTS 4

6 770909 S;-

507.8 C

1 4

1-i i

(1) REASON (2) Em I

1

A
Equipnent Failure (Explain) -

l ',

B:.Maint. or Test 3: Automatic Scram C: - ' Refueling -

4: Other (Explain).

D: - Regulatory Restriction E: -Operator Training;andi

-License Examination SUhf4ARY:. Operated'as base loaded unit F: Administrative-

with weekend power reductions G