Monthly Operating Rept for Jan 1974 for Monticello Nuclear Generating Plant
ML20127N090
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 01/31/1974
From: Jacobson G, Neils G, Scheinost R
NORTHERN STATES POWER CO.
To: Chapman S
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 9211300563
Download: ML20127N090 (5)


Text

m e

e Nse ppg., a...,am Flie rm v

NORTHERH STATES POWER COMPANY M S N N E A PO Li m. MIN N W S OT A 98409 February 28, 1974

'6 \\ i

~

1 s

/'

./

\\.:\\'

ht??Ikg, Y," i?, !s e!

' t*,.

\\,@fg8ag'M)

Of fice of Plans 6 Schedules 4.

M Directo, ate of Licensing

.\\

U. S. Atomic Energy Comnission

  • *g k'a s hing t on, D.C.

20545 Attention:

Mr. S Chapman Centlemen:

MONTICELLO NUCLEAR GEN 1.'<ATING PIANT

^

Docket No. 50-263 Licene.c No. DPR-22 Monthly Operating Data January, 1974 in accordance with the request of February 19, 1974 from Mr. L Manning Muntziag, the attached operating data is provided.

This infonnation includes a "one-time reporting request" forecast of refueling and major shutdowns for the next five years.

Very truly yours,

- T~~q:K g rps N

C 11 Neils General Superintendent of DdPfD g

Nuclear Power Plant Operations APR.12 874 *- rs GilN/ts L;

p3gt,,gg7

\\.

"4!L SitDON cc: J C Keppler

' MM1 Clig b7 Attachment m

e,04dd.

9211300S63 740131 ADOCK0500g3 PDR R

UNIT MONTICELLO NUCIEAR GENERATING PIANT MTE February 28, 1974 C(tiPLETED BY R L Scheinoot MAJOR SHUTDOWN FORECAST (5-year forecast; report one-time only)

)

/

PURPOSE (sl BEGIN MTE END DATE Refueling; maior maintenance; perfonn 3/15/74 6/1/74 inspections and col. duct tests required (740315)

(740601) each operating cycle Smne 3/15/75 5/11/75 (750315)

(750$11)_

same I/21/76 4/3/76 (760221)

(760403)

Same 3/12/77 4/23/77 (770312)

(770423)

Same 3/4/77 4/15/78 (780304)

(780415J e

i f

+

UNIT.Will Flonticellt Elcar Generating Plant DATE February / 27.E74

/

COMPLETED BY M k O B/ A-d C 1

f OPERATING STATUS 1.

REPORTING PDlIOD: 0000, 740101 TO 2400, 740131 GROSS LOURS IN REPORTING PERIOD:

743 (Change to DST)

Pool Winter Rating, 559 (RA test) 2.

CURRENTLY AlrDDRIZED POKER LEVEL hh't 1670 FW-hirr F

3.

P0h11R 1REL T0 h11101 RESTRICTED (IF ANY):

91%

4.

RFASONS FOR RESTRICTIONS (IF ANY):

End of cycle scram reactivity THIS CUhUlATIVE hDN'DI YR-TO-DATE 10 DATE 743 17,180 5.

Il0URS REACTOR MS CRITICAL 743 6.

HOURS GENERATOR ON-LINE 743 743 16,590 7.

GROSS TlIEPM\\L P0h'ER GENERATED (hh11) 1,084,831

_1,084,831 25,596,072 8.

GROSS ELECTRICAL P0h11R GENERATED (hNi) 374,870 374,870 8,765,100 9.

hirr ELECTRICAL POWER GENEilATED (hS11) 360,710 360,710 8,378,508

10. REACTOR AVAILABILITY FACIOR (1) 100%

100%

75.7%

11. PLANT AVA11 ABILITY FACTOR (2) 100%

100%

73.1%

86.8%

86.8%

66.0%

12. PIAhT CAPACITY FACTOR (3)
13. FORCED OUTAGE RATE (4) 0 0

Inter

14. SillfrD0hNS SCIEDUI.ED 10 BEGIN IN NEXT 6 FDhTHS (STATE TYPE, IMTE, AND DURATION OF EADI):

Refueling outage, scheduled to start hhrch 15, 1974, duration of 11 weeks.

~~

15.

IF SliUrD0hN AT END OF REPORT PERIOD, ESTIhnTED DATE OF STAR 1UP:

16.

PIANTS IN TEST STATUS (DELETED)

(1) REACTOR AVAILABILITY FAC1DR = HOURS REACTOR h'AS CRITICAL

  • 100 GROSS Il0URS IN REPORTING PliR10lf (2) PIANT AVAIIABILITY FACTOR = IDURS GENERATOR ON LINE
  • 100 CIDES 110URS IN REPORTING PIIRTOII (3) PIMF CAPACITY FACIDR = NET ELFCTRICAL P0h11R GENERNFED
  • 100 Kl?F DDOSSTRATED*EIGLTlDURS IN RLPOKfING PERIOD (4) FORCED OlfrAGE RATE = FORCED OUTAGE 1100RS
  • 100 IIOURS GEN 1iRATOR ON-LINE + IORLeu OUFAGE IDURS
  • 2025 ECWSURE A hbnticello Nuclear UNIT Generating Plant i

DATE fek 9,1_ tq74 /

COMP 1ITED BY MM UddeM

/

DAILY PIAVT POWER WHUT hDNIl{

January, 1974 DAY AVERAGE 110URLY We-net MY ANGE MY W'e-net 1

505 25 473 2

503 26 480 3

502 27 476 4

499 28 468 5

471 29 457 6

480 30 453 7

503 31 452 8

502 9

505 10 503 11 505 12 501 13 501 14 479 15

_485 16 485 17 483 18 484 19 485 20 482 21 483 22 478 23 474 24 472

2027 FONTIELLO hl.C.

U'iIT NA'E GENERATING PLA' SM4AKf DATE Februarp-27, 1951 Base loaded power operation for the entire month.

~

REPORT FONHI January, 1974 CU,IPIETED BY j[Ma-/d ^

I PIANT SUITOCsS l

TYPE FEDDD OF F-FORCED IURATION SUITING 1001 No.

DAlli S-SOiEIULED (100RS)

RTM ON (1) 11iE REACIDR (2)

CU TENTS NONE (1) REASON:

(2) MEniC' A-EQUIPMENT FAIlliRE(EXPIAIN)

A-R\\'

B-M11N. OR TEST B-E C-REFUELING St D-REGILATORY RESTRICTION C-RJrs E-OPERATOR TRAININTi 6 SCI LICENSE EWIINATION F-ALTIINISTRATI\\li G-OFERATIOML ERROR (Explain) i f

,