Text
- m e
e Nse ppg., a...,am Flie rm v
NORTHERH STATES POWER COMPANY M S N N E A PO Li m. MIN N W S OT A 98409 February 28, 1974
'6 \\ i
~
1 s
/'
./
\\.:\\'
ht??Ikg, Y," i?, !s e!
' t*,.
\\,@fg8ag'M)
Of fice of Plans 6 Schedules 4.
M Directo, ate of Licensing
.\\
U. S. Atomic Energy Comnission
- *g k'a s hing t on, D.C.
20545 Attention:
Mr. S Chapman Centlemen:
MONTICELLO NUCLEAR GEN 1.'<ATING PIANT
^
Docket No. 50-263 Licene.c No. DPR-22 Monthly Operating Data January, 1974 in accordance with the request of February 19, 1974 from Mr. L Manning Muntziag, the attached operating data is provided.
This infonnation includes a "one-time reporting request" forecast of refueling and major shutdowns for the next five years.
Very truly yours,
- T~~q:K g rps N
C 11 Neils General Superintendent of DdPfD g
Nuclear Power Plant Operations APR.12 874 *- rs GilN/ts L;
p3gt,,gg7
\\.
"4!L SitDON cc: J C Keppler
' MM1 Clig b7 Attachment m
e,04dd.
9211300S63 740131 ADOCK0500g3 PDR R
UNIT MONTICELLO NUCIEAR GENERATING PIANT MTE February 28, 1974 C(tiPLETED BY R L Scheinoot MAJOR SHUTDOWN FORECAST (5-year forecast; report one-time only)
)
/
PURPOSE (sl BEGIN MTE END DATE Refueling; maior maintenance; perfonn 3/15/74 6/1/74 inspections and col. duct tests required (740315)
(740601) each operating cycle Smne 3/15/75 5/11/75 (750315)
(750$11)_
same I/21/76 4/3/76 (760221)
(760403)
Same 3/12/77 4/23/77 (770312)
(770423)
Same 3/4/77 4/15/78 (780304)
(780415J e
i f
+
UNIT.Will Flonticellt Elcar Generating Plant DATE February / 27.E74
/
COMPLETED BY M k O B/ A-d C 1
f OPERATING STATUS 1.
REPORTING PDlIOD: 0000, 740101 TO 2400, 740131 GROSS LOURS IN REPORTING PERIOD:
743 (Change to DST)
Pool Winter Rating, 559 (RA test) 2.
CURRENTLY AlrDDRIZED POKER LEVEL hh't 1670 FW-hirr F
3.
P0h11R 1REL T0 h11101 RESTRICTED (IF ANY):
91%
4.
RFASONS FOR RESTRICTIONS (IF ANY):
End of cycle scram reactivity THIS CUhUlATIVE hDN'DI YR-TO-DATE 10 DATE 743 17,180 5.
Il0URS REACTOR MS CRITICAL 743 6.
HOURS GENERATOR ON-LINE 743 743 16,590 7.
GROSS TlIEPM\\L P0h'ER GENERATED (hh11) 1,084,831
_1,084,831 25,596,072 8.
GROSS ELECTRICAL P0h11R GENERATED (hNi) 374,870 374,870 8,765,100 9.
hirr ELECTRICAL POWER GENEilATED (hS11) 360,710 360,710 8,378,508
- 10. REACTOR AVAILABILITY FACIOR (1) 100%
100%
75.7%
- 11. PLANT AVA11 ABILITY FACTOR (2) 100%
100%
73.1%
86.8%
86.8%
66.0%
- 12. PIAhT CAPACITY FACTOR (3)
- 13. FORCED OUTAGE RATE (4) 0 0
Inter
- 14. SillfrD0hNS SCIEDUI.ED 10 BEGIN IN NEXT 6 FDhTHS (STATE TYPE, IMTE, AND DURATION OF EADI):
Refueling outage, scheduled to start hhrch 15, 1974, duration of 11 weeks.
~~
15.
IF SliUrD0hN AT END OF REPORT PERIOD, ESTIhnTED DATE OF STAR 1UP:
16.
PIANTS IN TEST STATUS (DELETED)
(1) REACTOR AVAILABILITY FAC1DR = HOURS REACTOR h'AS CRITICAL
- 100 GROSS Il0URS IN REPORTING PliR10lf (2) PIANT AVAIIABILITY FACTOR = IDURS GENERATOR ON LINE
- 100 CIDES 110URS IN REPORTING PIIRTOII (3) PIMF CAPACITY FACIDR = NET ELFCTRICAL P0h11R GENERNFED
- 100 Kl?F DDOSSTRATED*EIGLTlDURS IN RLPOKfING PERIOD (4) FORCED OlfrAGE RATE = FORCED OUTAGE 1100RS
- 100 IIOURS GEN 1iRATOR ON-LINE + IORLeu OUFAGE IDURS
- 2025 ECWSURE A hbnticello Nuclear UNIT Generating Plant i
DATE fek 9,1_ tq74 /
COMP 1ITED BY MM UddeM
/
DAILY PIAVT POWER WHUT hDNIl{
January, 1974 DAY AVERAGE 110URLY We-net MY ANGE MY W'e-net 1
505 25 473 2
503 26 480 3
502 27 476 4
499 28 468 5
471 29 457 6
480 30 453 7
503 31 452 8
502 9
505 10 503 11 505 12 501 13 501 14 479 15
_485 16 485 17 483 18 484 19 485 20 482 21 483 22 478 23 474 24 472
2027 FONTIELLO hl.C.
U'iIT NA'E GENERATING PLA' SM4AKf DATE Februarp-27, 1951 Base loaded power operation for the entire month.
~
REPORT FONHI January, 1974 CU,IPIETED BY j[Ma-/d ^
I PIANT SUITOCsS l
TYPE FEDDD OF F-FORCED IURATION SUITING 1001 No.
DAlli S-SOiEIULED (100RS)
RTM ON (1) 11iE REACIDR (2)
CU TENTS NONE (1) REASON:
(2) MEniC' A-EQUIPMENT FAIlliRE(EXPIAIN)
A-R\\'
B-M11N. OR TEST B-E C-REFUELING St D-REGILATORY RESTRICTION C-RJrs E-OPERATOR TRAININTi 6 SCI LICENSE EWIINATION F-ALTIINISTRATI\\li G-OFERATIOML ERROR (Explain) i f
,