ML20127M617

From kanterella
Jump to navigation Jump to search
Forwards LER 92-006-00 for Point Beach Nuclear Plant,Unit 2, Re Inadvertent Actuation of non-safeguards Equipment Lockout
Date released: 05/20/2020 Download: ML20127M617


Forwards LER 92-006-00 for Point Beach Nuclear Plant,Unit 2, Re Inadvertent Actuation of non-safeguards Equipment Lockout
ML20127N132
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 11/19/1992
From: Link B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-92-133A
Download: ML20127N132 (1)
:on 921020,inadvertent ESF Actuation Occurred as Result of as-built Wire Tracing & Disconnected Output from 2B04 Lockout Relay.Cabling Reconnected on 921020
ML20127M611
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 11/19/1992
From: Hennig B
WISCONSIN ELECTRIC POWER CO.
To:
References
Download: ML20127M611 (6)