C3mmtnwealth Edison Zion Generating ;htion 101 Shiloh Bb/d.
Zion Illinoit,60099 j
Telephone 708 / 746-2084 i
November 24. 1992 ZAD-92-014 Nuclear Regulatory Commission Ncement Control Desk Washington, DC 20555
Dear Sir:
At. ached is the corrections for the October 1992 Operating Status 's p '+,
/- ~
n-Station /e/
T.P. Joy Manager Zion Station TPJ/DFK/dfk l
Enclosur; i
l cc: Regualtory Assurance uSNRC Document Control M. Wallace A. B. Davis (NRC)
J. Leider T. Rieck T. J. Kovach D. R. Eggett INPO Div. of Eng. Health State of Illinois F. Yost B. Gallo H. Granjean NRC Inspector, Zion 4
P. Graessle Operating Engrs.
C. Patel - Fax Master File bbObdC p
ZCLERK-5(1) 9211300286 921124 dl DR ADOCK 0500 5
=
s
_50-295-
_lll2A192
_D J ennedy
_110.8LliE-2DBA_
_X3163 e
s d+
e
- h 7) Since Last l ',
Date cumulative
~
- 2010_
1.61J20 1 ALJ_.
11029.68,5_
3
~
s 0.0 2.62LB_.
AL2_.. 10ld92mL 0.0 0.0
=
p 4991. _112d9L550_
.310._ _10.1.03L.12L
~
. 02L __9LDAL190_
~
3910_
65 1 39_ 1 61 1 34.6 56A_
34 1 51 1
~
IL3_
17.0_
cation of Each):
.'r tup :
orecast Achieved 4
O b
g e
n 9
4 g
~
4 s
Im a
b OPERATING DATA REPURT DOCKET NO._50:295_
DATE 11/24/22 COMPLETED BY D. Kenntdy TELEPHONE _GDHL116-20E4_
X3169 OPERATING STATUS 1.
Unit Name:
Zion Unit 1 2.
Reporting Period: 0000_92010L112400 920930_
Notes 3.
Licensed Thermal Power (MHt):
'*50 4.
Nameplate Rating (Gross HHe):
1085 5.
Design Ilectrical Rating (Net MHe):
1040 6.
Maximum Dependable Capacity (Gross MHe):_10R5 7.
Maximum Dependable Capacity (Net MWe):-
1040 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last j
Report, Give Reasons:
N/A i
9.
Power Level To Hhich Restricted, If Any (Net MHe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 745.0 7.320.0 165.120 Q_
- 12. Number Of Hours Reactor Has Critical 710.8 3.141.3 110.96amS_
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 2 E211B_
- 14. Hours Generator On-Line 692.0 2.847.2
- 107.492,l_
- 15. Unit Reserve Shutdown Hours 0.Q_
0.0 0.0
- 16. Gross Thermal Energy Generated (MHH)JJ552101_
8.160.994 312.19L550_
- 17. Gross Electrical Energy Generated (MHH) 694.511 2.75L31(L _lGLQ35_.122_
- 18. Net Electrical Energy Generated (MHH) 662.51S_
2.632 D13_
96.045.790_
- 19. Unit Service Factor 93.0 39.0 6510_
- 20. Unit Availability Factor 93 0_
39.0 65.0 1
- 21. Unit Capacity Factor (Using MDC Net) 85.5_
34.6 5510_
- 22. Unit Capacity Factor (Using DER Net) 85.5_
34.6 5110_
- 23. Unit Forced Outage Rate 110_.
12.3_.
17.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Corrections made to this report.