ML20127M314

From kanterella
Jump to navigation Jump to search
Forwards Rev 14 to Security Plan.Rev Addresses Operational Concerns During Const Phase of Plant.Rev Withheld (Ref 10CFR73.21)
ML20127M314
Person / Time
Site: Byron  Constellation icon.png
Issue date: 05/16/1985
From: Farrar D
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
0119K, 119K, NUDOCS 8505230234
Download: ML20127M314 (1)


Text

__

O one First Natonal Plan Chicago. Ilknois Commonwealth Edison Address Reply to: Post Office Box 767 Chicago, Illinois 60690 May 16, 1985 Mr. Harold R. Denton, Director Of fice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC.

20555

Subject:

Byron Station Units 1 & 2 Byron Security Plan Docket Nos:

50-454 and 50-455

Dear Mr. Denton:

Enclosed, please find six (6) copies of Revision 14 to the Byron Station Security Plan which has been revised to address operational concerns during the construction phase of Byror.

Station.

Pursuant to 10 CFR 50.54p, we have determined that these changes to the Security Plan do not decrease the safeguards effectiveness of the Plan.

These enclosures contain Safeguards Information which must be protected from public disclosure pursuant to 10 CFR 73.21.

Sincerely, tm-w Dennis L. Farrar Director of Nuclear Licensing Enclosures THE ENCLOSURE CONTAINS SAFEGUARDS INFORMATION.

Upon separation, this page is decontrollec.

t 0119K O

ggansk a

F t

a