ML20127M302

From kanterella
Jump to navigation Jump to search
Matl Control & Accountability Safeguards Insp Rept 70-1257/85-08 on 850528-30 & 0603-07.No Violations Noted. Major Areas Inspected:Facility Operations & Internal Control.Details Withheld (Ref 10CFR2.790)
ML20127M302
Person / Time
Site: Framatome ANP Richland
Issue date: 06/20/1985
From: Nelson G, Schuster M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML19304B140 List:
References
70-1257-85-08, 70-1257-85-8, NUDOCS 8507010182
Download: ML20127M302 (1)


Text

-

Y, r_,.,

~

4-s 3

5

-g y.

s.

s j

Theinformationon~thispadeisc$nsideredtobea'ppropriate for public. disclosure pursuant to~10'CFR,2.790

.U.

S.' NUCLEAR REGULATORY COMMISSION',

REGION _V~

~

Report No.

I70-1257/85-08 (IE-V-695)

Docket No.

.70-1257 -

. License No.

SNM-1227 2

Safeguards Group:

III Licensee:

Exxon Nuclear Company, Inc.

2101-Horn Rapids Road

-Richland, Washington 99352

-Facility Name:

Exxon Nuclear Fuel Fabrication Facility Inspection at:

Horn Rapids Road Facility, Richland, Washington Inspection conducted:

May 28 through 30 and June 3 through 7, 1985 Date of Last Material Control and Accounting Inspection:

May 6 through 10'and May 21, 1985 Type.of Inspection:

Routine Unannounced MC&A Safeguards b

Inspector:

G.: B. Nelson, Chemist Date Signed r

th$f Approved By: 4 7) b, e fu M. D. Schuster, Chief, Safeguards Section Date Signed Nuclear Materials Safety and Safeguards Branch Inspection Summary:

Areas Inspec*ad: Facility operations and internal control, measurement systems, reco'rds' and reports. The inspection involved 34 inspector-hours

'onsite during regular hours and 20 inspector-hours during in-office inspection on May 28 through 30, 1985.

Results: No violations were identified in the three-areas inspected.

g70{0 h

D C

e

?

u j