MONTHYEARML20217M3801999-10-21021 October 1999 Forwards Insp Rept 50-263/99-06 on 990813-0923.Four Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217G0711999-10-13013 October 1999 Forwards Insp Rept 50-263/99-12 on 990913-17.No Violations Noted ML20216J2491999-09-30030 September 1999 Ack Receipt of 980804,990626 & 0720 Ltrs in Response to GL 98-01,suppl 1, Year 2000 Readiness of Computer Sys at Npps. Staff Review Has Concluded That All Requested Info Has Been Provided ML20217B1421999-09-30030 September 1999 Informs That on 990902,NRC Staff Completed mid-cicle Plant Performance Review of Monticello Nuclear Generating Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Information & to Plan for Insp Activities ML20212K9131999-09-30030 September 1999 Refers to 990920 Meeting Conducted at Monticello Nuclear Generating Station to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20216G4341999-09-24024 September 1999 Forwards Exam Rept 50-263/99-301 on 990823-26.Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy.Test Was Administered to Two Applicants. Both Applicants Passed All Sections of Exam ML20216J8091999-09-24024 September 1999 Informs That New Diaphragm Matl Has Corrected Sticking Problem Associated with Increased Control Rod Drive Scram Times.Augmented Testing of Valves at Monticello Has Been Discontinued ML20212G7171999-09-24024 September 1999 Submits Semiannual Status Update on Project Plans for USAR Review Project & Conversion to Its.Conversion Package Submittal Continues to Be Targeted for Aug of 2000 ML20212G9801999-09-23023 September 1999 Refers to Resolution of Unresolved Items Identified Re Security Alarm Station Operations at Both Monitcello & Prairie Island ML20212F0901999-09-21021 September 1999 Confirms Discussion Between M Hammer & Rd Lanksbury to Have Routine Mgt Meeting on 991005 in Lisle,Il.Purpose of Meeting to Discuss Improvement Initiatives in Areas of Operations & Equipment Reliability ML20217A5751999-09-0909 September 1999 Forwards Individual Exam Results for Licensee Applicants Who Took Aug 1999 Initial License Exam.Without Encls ML20212A9761999-09-0909 September 1999 Submits 1999 Annual Rept of Any Changes or Errors Identified in ECCS Analytical Models or Applications ML20211Q6981999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Monticello Operator License Applicants During Wks of 010604 & 11.Validation of Exam Will Occur at Station During Wk of 010514 ML20211K7971999-09-0101 September 1999 Informs That Util Reviewed Rvid as Requested in NRC .Recommended Corrections Are Listed ML20211L1981999-09-0101 September 1999 Forwards Insp Rept 50-263/99-05 on 990702-0812.No Violations Noted ML20211K2591999-08-27027 August 1999 Forwards NSP Co Fitness for Duty Program Performance Data for Six Month Period Ending 990630 ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211F9961999-08-26026 August 1999 Forwards Effluent & Waste Disposal Semi-Annual Rept for 990101-990630, Revised Effluent & Waste Disposal Semi-Annual Rept for 980701-981231 & Revs to ODCM for Monitcello Nuclear Generating Plant ML20211C9501999-08-23023 August 1999 Forwards Rev 17 to Monticello Nuclear Generating Plant USAR, Updating Info in USAR to Reflect Implementation of Increase in Licensed Core Thermal Power from 1,670 Mwt to 1,775 Mwt.Rept of Changes,Tests & Experiments Not Included ML20210U1831999-08-12012 August 1999 Revises 980202 Commitment Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions ML20210T9601999-08-12012 August 1999 Provides Rept on Status of Util RPV Feedwater Nozzle Insps Performed in Response to USI A-10 Re BWR Nozzle Cracking ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210Q0341999-08-0404 August 1999 Forwards SE Granting Licensee 980724 Relief Request 10 Re Third 10-year Interval ISI Program Plan,Entitled, Limited Exam ML20210L1061999-08-0202 August 1999 Forwards Insp Rept 50-010/99-13 on 990702-27.No Violations Noted.Insp Examined Activities in Areas of Facility Management & Control & Radiological Safety ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210H0861999-07-28028 July 1999 Forwards Insp Rept 50-263/99-04 on 990521-0701.No Violations Noted.Licensee Conduct at Monticello Facility Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Appropriate Radiological Controls ML18107A7051999-07-20020 July 1999 Provides Suppl Info Which Supersedes Info in 990625 Ltr in Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML20210D2961999-07-20020 July 1999 Forwards Corrected Info for DNPS Unit 3 MOR for June 1999. Year-to Date Forced Outage Hours Should Have Read 70 Hours Instead of 0 on Page 8.Error Also Affected Cumulative Forced Outage Hours Which Should Have Been 24,761 ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20212H3191999-07-16016 July 1999 Forwards Aug 1999 Monticello RO Exam Package,Including Revised Outlines.All Changes Are in Blue Font ML20209G5621999-07-14014 July 1999 Forwards Insp Rept 50-263/99-11 on 990621-24.No Violations Noted.Objective of Insp,To Determine Whether Monticello Nuclear Generating Station Emergency Plan Adequate & If Station Personnel Properly Implemented Emergency Plan ML20196J5351999-07-0202 July 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950515 & NSP Responses & 980917 for Monticello Npp.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J9681999-07-0101 July 1999 Informs That in Sept 1998,Region III Received Rev 20 to Portions of Util Emergency Plan Under 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of Licensee Emergency Plan,No NRC Approval Required ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196K3231999-06-30030 June 1999 Informs That Effective 990703,NRC Project Management Responsibility for Dresden,Unit 1 Station Will Be Transferred to P Ray ML20209B6151999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Y2K Readiness Disclosure Attached ML20196H2291999-06-24024 June 1999 Responds to Administrative Ltr 99-02,dtd 990603,requesting Licensee to Provide Estimate of Licensing Action Submittals Anticipated.Four New Submittals Per Year Are Anticipated ML20196D3491999-06-18018 June 1999 Forwards Insp Repts 50-237/99-08 & 50-249/99-08 on 990408-0521.Four Non-Cited Violations Noted.Maint on safety- Related Emergency CR Not Performed Well.Low Impact Issues Re Communications Present in Operations,Maint & Security ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195E3451999-06-0707 June 1999 Forwards 3.5 Inch Computer Diskette Containing Revised File Format for Annual Dose Rept for 1998,per 990520 Telcon Request from Nrc.Each Station Data Is Preceded by Header Record,Which Provides Info Necessary to Identify Data ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs ML20207G2571999-06-0303 June 1999 Informs That Effective 990328,NRC Ofc of NRR Underwent Reorganization.Within Framework of Reorganization,Division of Licensing Project Management Created ML20207D5851999-05-25025 May 1999 Submits Info Re Partial Fulfillment of License Conditions Placed on Amend 101,which Approved Use of Ten Exceptions for 24 Months Subject to Listed App C Conditions.Util Will Submit Second Rept to Obtain Approval for Continued Use ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML20206S0911999-05-17017 May 1999 Forwards Response to NRC 990324 RAI Re Proposed Amend to pressure-temp Limits & Surveillance Capsule Withdrawal Schedule, .Supporting Calculations Also Encl 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M3801999-10-21021 October 1999 Forwards Insp Rept 50-263/99-06 on 990813-0923.Four Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20217G0711999-10-13013 October 1999 Forwards Insp Rept 50-263/99-12 on 990913-17.No Violations Noted ML20216J2491999-09-30030 September 1999 Ack Receipt of 980804,990626 & 0720 Ltrs in Response to GL 98-01,suppl 1, Year 2000 Readiness of Computer Sys at Npps. Staff Review Has Concluded That All Requested Info Has Been Provided ML20217B1421999-09-30030 September 1999 Informs That on 990902,NRC Staff Completed mid-cicle Plant Performance Review of Monticello Nuclear Generating Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Information & to Plan for Insp Activities ML20212K9131999-09-30030 September 1999 Refers to 990920 Meeting Conducted at Monticello Nuclear Generating Station to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA ML20216G4341999-09-24024 September 1999 Forwards Exam Rept 50-263/99-301 on 990823-26.Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy.Test Was Administered to Two Applicants. Both Applicants Passed All Sections of Exam ML20212G9801999-09-23023 September 1999 Refers to Resolution of Unresolved Items Identified Re Security Alarm Station Operations at Both Monitcello & Prairie Island ML20212F0901999-09-21021 September 1999 Confirms Discussion Between M Hammer & Rd Lanksbury to Have Routine Mgt Meeting on 991005 in Lisle,Il.Purpose of Meeting to Discuss Improvement Initiatives in Areas of Operations & Equipment Reliability ML20217A5751999-09-0909 September 1999 Forwards Individual Exam Results for Licensee Applicants Who Took Aug 1999 Initial License Exam.Without Encls ML20211Q6981999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Monticello Operator License Applicants During Wks of 010604 & 11.Validation of Exam Will Occur at Station During Wk of 010514 ML20211L1981999-09-0101 September 1999 Forwards Insp Rept 50-263/99-05 on 990702-0812.No Violations Noted ML20210Q0341999-08-0404 August 1999 Forwards SE Granting Licensee 980724 Relief Request 10 Re Third 10-year Interval ISI Program Plan,Entitled, Limited Exam ML20210L1061999-08-0202 August 1999 Forwards Insp Rept 50-010/99-13 on 990702-27.No Violations Noted.Insp Examined Activities in Areas of Facility Management & Control & Radiological Safety ML20210H0861999-07-28028 July 1999 Forwards Insp Rept 50-263/99-04 on 990521-0701.No Violations Noted.Licensee Conduct at Monticello Facility Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Appropriate Radiological Controls ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20209G5621999-07-14014 July 1999 Forwards Insp Rept 50-263/99-11 on 990621-24.No Violations Noted.Objective of Insp,To Determine Whether Monticello Nuclear Generating Station Emergency Plan Adequate & If Station Personnel Properly Implemented Emergency Plan ML20196J5351999-07-0202 July 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950515 & NSP Responses & 980917 for Monticello Npp.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 ML20196J9681999-07-0101 July 1999 Informs That in Sept 1998,Region III Received Rev 20 to Portions of Util Emergency Plan Under 10CFR50.54(q).Based on Determination That Changes Do Not Decrease Effectiveness of Licensee Emergency Plan,No NRC Approval Required ML20196K3231999-06-30030 June 1999 Informs That Effective 990703,NRC Project Management Responsibility for Dresden,Unit 1 Station Will Be Transferred to P Ray ML20196D3491999-06-18018 June 1999 Forwards Insp Repts 50-237/99-08 & 50-249/99-08 on 990408-0521.Four Non-Cited Violations Noted.Maint on safety- Related Emergency CR Not Performed Well.Low Impact Issues Re Communications Present in Operations,Maint & Security ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20207G2571999-06-0303 June 1999 Informs That Effective 990328,NRC Ofc of NRR Underwent Reorganization.Within Framework of Reorganization,Division of Licensing Project Management Created ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML20206P2431999-05-13013 May 1999 Forwards Insp Rept 50-010/99-09 on 990325-0506.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20206N5601999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Cm Craig Will Be Section Chief for Monticello Npp.Organization Chart Encl ML20206G2181999-05-0505 May 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, Dtd 960110,for Plant ML20206G4901999-05-0404 May 1999 Forwards Staff Review of Licensee 960508 Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Sf,Over Fuel in Rc or Over Safety-Related Equipment, .Overall, Responses Acceptable.Tac M95610 Closed ML20206G7741999-05-0303 May 1999 Forwards Insp Rept 50-263/99-02 on 990223-0408.One Violation Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20205N0821999-04-12012 April 1999 Forwards SE of NSP Response to NRC GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Licensee Adequately Addressed Actions Requested in GL ML20205N5301999-04-0909 April 1999 Discusses Arrangements Made on 990406 for Administration of Licensing Exams at Monticello Nuclear Generating Station During Wk of 990823.Requests That Exam Outlines Be Submitted by 990128 & Supporting Ref Matls by 990719 ML20205N4811999-04-0909 April 1999 Forwards Licensing Requalification Insp Rept 50-263/99-10 on 990308-12.No Violations Noted.However,Inspectors Through Observation of Simulator Scenario Exams Noted Difficulties in Ability of SM to Simultaneously Implement Duties of SM ML20205K5521999-04-0202 April 1999 Forwards Partially Withheld Security Insp Repts 50-010/99-07,50-237/99-07 & 50-249/99-07 on 990308-12.Two non-cited Violations Identified Involving Failure of Security Personnel to Implement Required Measures ML20205C4851999-03-26026 March 1999 Informs That on 990203,NRC Staff Completed PPR of Nuclear Plant.Staff Conducts Reviews for All Operating NPPs to Develop an Integrated Understanding of Safety Performance ML20205A5881999-03-24024 March 1999 Forwards Request for Addl Info Re Submittal Requesting Rev of pressure-temperature Limits & Surveillance Capsule Withdrawal Schedule ML20204H4711999-03-18018 March 1999 Forwards SER Concluding That Util Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Monticello & Adequately Addressed Actions Requested in GL 96-05 ML20207H5161999-03-11011 March 1999 Forwards Insp Rept 50-263/99-01 on 990112-0222.No Violations Noted ML20207L7141999-03-0808 March 1999 Discusses Transmitting Changes Identified as Rev 59 to Security Plan for Dresden Nuclear Power Station,Units 1,2 & 3.Staff Determined That No NRC Approval Required in Accordance with 10CFR50.54(p) ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML20203G3631999-02-10010 February 1999 Forwards Insp Rept 50-010/99-02 on 981218-990129.No Violations Noted.During Insp,Activities in Area of Facility Mgt & Control,Decommissioning Support Activities & Radiological Safety Were Examined ML20202B7191999-01-26026 January 1999 Discusses 990125 Telcon with T Witschen & D Mcneil Re Arrangements for NRC to Inspect Licensed Operator Requalification Program at Monticello Nuclear Generating Station.Insp Planned for Week of 990308 ML20199H8321999-01-20020 January 1999 Forwards Insp Rept 50-263/98-18 on 981201-990111.No Violations Were Identified.Conduct of Activities at Monticello Facility Was Generally Characterized by safety- Conscious Operations & Sound Maint Practices ML20199F3291999-01-14014 January 1999 Ack Receipt of Ltr Dtd 981230,transmitting Changes Identified as Rev 59 to Plant Security Plan,Submitted Under Provisions of 10CFR50.54(p) ML20199G7721999-01-14014 January 1999 Forwards Request for Addl Info Re GL 88-20, Individual Plant Exam of External Events (IPEEE) for Severe Accident Vulnerabilities, Issued in June 1991 ML20206R8631999-01-12012 January 1999 Informs That Staff Has Prepared TS Interpretation of Requirements for Extending Surveillance Intervals at Plant,Per NRC Request ML20199E4791999-01-0606 January 1999 Forwards SER Accepting Licensee 951116,960214 & 0524 Responses to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode, for Monticello ML20206R8741999-01-0404 January 1999 Discusses Clarification of Understanding of Safety Evaluation Related to Deviation from Emergency Procedure Guidelines for Monticello.Staff Agrees with NSP Characterization & Resolution of Issues ML20198R2001998-12-30030 December 1998 Forwards Insp Rept 50-263/98-19 on 981214-18.No Violations Noted.Purpose of Insp Was to Review Plant Chemistry Program, PASS & REMP ML20198P0501998-12-28028 December 1998 Informs of Completion of Review of Relief Request 9 Re Third 10-year Interval ISI Program Plan,Entitled Use of High Alloy/High Nickel Calibr Block for Dissimilar Metal Welds. Supporting SE Encl ML20198G0761998-12-21021 December 1998 Acks Receipt of Notifying NRC That Commitment Noted in Is Complete Re Tornado Effects on Reactor Bldg Superstructure ML20198D0181998-12-15015 December 1998 Informs That as Part of PRA Implementation Plan,Commission Assigned Two SRAs to Each Regional Ofc.Sras Will Routinely Assess Licensee Event Repts,Plant Events,Insp Findings & EAs from Risk Perspective 1999-09-09
[Table view] |
Text
- - ~. - . _. . . _ - _
4
)
UNITED STATES g
ATOMIC ENERGY COMMISSION
,.C(op.,
(#o p / y j?
\
DIRECTOR ATE OF REGULATORY OPER ATIONS REGION lli ,
ymmg M s # */
i 799 ROOSEVELT ROAD 0121856 2860 GLEN ELLYN ILLINOIS 6o137 December 17, 1974 Northern States Power Company Docket No. 50-263 A'ITH: Mr. Leo Wacther, Vice President Fower Production and System Operation 414 Nicollet Hall Minnaapolis, Minnesote 55401 Gentlemen Roelosed is RO Dulletin 74-10A, which amends the description of the cireumstances discussed in R0 Bulletin 74-10 and requests additional actions by you.
Should you have questions regarding this Bulletin or the actions roguested of you, please sentact this office.
Sincerely yours, i
l
(
l l
James G. Keppler ,
Regional Director Enclosure RO Du11etta No.74-10A Approved by GAO, 5-180225 (R0072), eleeranee supires 7-31-77.
Approval t'as gives under a blanket elesrance specifically for identified generic problems.
bee DR Central Files N
'R0 Files PDR Local PDR OGC, Beth, P-506A '\
Anthony Roisman, Esq.
1230468 741217 G ADOCK 05000263 4) .4 ,
PDR
~
December 17, 1974 DRO Bulletin No.74-10A FAILURES IN 4-INCH BYPASS PIPING AT DRESDEN-2
(
REFERENCE:
R0 BULLETIN NO. 74-10, DATED 9/19/74)
DESCRIPTION OF CIRCUMSTANCES (AMENDED):
The Commonwealth Edison Company notified the Region III Office of the Directorate of Regulatory Operations by telephone on December 13, 1974, of the finding of additional through-wall cracks in the 4-inch diameter bypass loop around the dischargo valve of the "B" recirculation pump at the Dresden-2 facility. The circumferential cracks were located adjacent to the heat affected zone of a weld which joins the'"B" bypass loop piping to a weldolet fitting on the 28-inch diameter main coolant recir-culation piping.
The cracks were revealed during a planned ultrasonic reexamination of the bypass piping as a part of the inservice inspection program at !
Dresden-2. Similar ultrasonic examination of the same veld in mid-September 1974 revealed no evidence of cracks at that--time.
The Dresden-2 facility is currently shut down for refueling. All welds in the 4-inch bypass piping are to be reexamined during this shutdown.
The licensee is evaluating the significance of the cracks which have been detected as well as procedures for their' repair.
ACTIONS REQUESTED OF LICENSEES (AMENDED):
For all boiling water reactor facilities of jet-pump design with operating license
- 1. Reevaluate the results of ultrasonic and other examinations con-ducted previously in response to R0 Bulletin 74-10 or es part'of the baseline inservice inspection for those facilities not examined
- in response to RO Bulletin 74-10.
i Notify this office by telephone by December 23, 1974, and reaffirm in writing by December 30, 1974, of the results of your reevaluation.
, 2. Reexamine (by ultrasonic or ot. suitable volumetric inspection technique) all accessible welds in the bypass piping lines around
~
l the recirculation pump discharge vt?ves at the earliest of the
- following conditionst i
l l
l 4
DRO Bulletin No.74-10A a. If presently at cold shutdown and scheduled to remain in this condition for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or more, prior to resuming power operation.
b, If presently at a condition other than cold shutdown, at such time that (within the sensitivity specified in paragraph C.S.
of Regulatory Guide 1.45) any reactor coolant leakage detection system indicates, within a period of four hours or less, either an increase in unidentified leakage to twice the determined normal rate of unidentified Icakage or an increase in the rate of unidentified leakage by two (2) gpm or more. (In no case, however, shall the rate of leakage exceed that specified in the technical specifications without those actions required of the technical specification being taken.)
- c. Next cold shutdown, regardless of duration.
Notify this office in writing, within 10 days following their completion, of the results of the reexaminations conducted in response to this Bulletin. Your written notification should also include a brief description of the examination-technique and procedures employed, as well as a description of any special engineering disposition or repairs necessitated by the results of these reexaminations.
A copy of all written notifications to this office (including all attachments) should be sent to the Assistant Director for Construction and Operations, Directorate of Regulatory Operations, AEC Headquarters in Washington, D. C.
.