l l.

4 PHILADELPHIA ELECTRIC COMPANY-NUCLEAR GROUP HEADQUARTERS '

955-65 CHESTERBROOK BLVD.

January 20, 1993 WAYNE, PA 19087-5691 Docket Nos.-50-277 (215) m 50-278 50-352 50-353-License Nos. DPR-44 DPR-56 NUC1. EAR SERVICES DEPARTMENT NPF-39

-NPF-85 U.S. Nuclear-Regulatori Commission Attn:

Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station,. Units 2'and 3 Limerick Generating. Station, Units 1 and 2 Completion of the Emergency Response-Data System (ERDS) _

REFERENCES:

1)

Generic Letter 89-15, " Emergency. Response Data'.

System," dated August 21, 1989.

2)

Letter ' from D.

R.

Helwig (PECo) to USNRC, dated December 20, 1989.

3)

Letter from G.

J. Beck (PECo) to USNRC, dated September 30, 1991.

4)

Letter from G. J.: Beck (PECo) to USNRC, dated December 6, 1991.

5).

Letter from G. J. Beck (PECo) to USNRC, dated i

February 19, 1992.

6)

Letter f rom C. L. Miller (USNRC) 'to G. J. Beck (PECo), dated March 19, 1992.

7)

-Letter from G. J. Beck-(PECo) to USNRC,_ dated May 21,-1992.

Dear Sir:

As discussed in the revised Appendix E to 10 CFR'50, Section

'VI.4(a), contained-.in the " Emergency Response Data SystM; Final Rule" dated August 13, 1991-(56 FR 40185),-licensees were required to participate in the Emergency Response ' Data - System (ERDS) program.

As a part of this program, each licensee was required to complete the implementation to the ERDS-by February 13,.1993, or before initial escalation to full power.

nenn92 l

9301260299 930120 ~~

l j-l PDR-ADOCK 05000277 F-png

L6cument Contrcl Desk January 20, 1993 Page 2 In accordance with this requirement, Philadelphia Electric Company (PECo) has completed the installation and testing of the ERDS for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, and for Limerick Generating Station (LGS), Units 1 and 2.

The ERDS has been implemented at both stations.

If you have any questions, please contact us.

Very truly yours, h'

,/

G. J.

Beck, Manager Licensing Section cc:

T.

T.

Martin, Administrator, Region I, USNRC J.

J. Lyash, USNRC Senior Resident Inspector, PBAPS W.

P.

Dornsife, Commonwealth of Pennsylvania T.

J.

Kenny, USNRC Senior Resident Inspector, LGS i

t e

w