Informs of Completion of Installation & Testing of ERDS for Facilities,Per Generic Ltr 89-15
ML20127K985
Person / Time
Site: Peach Bottom, Limerick  Constellation icon.png
Issue date: 01/20/1993
From: Beck G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-15, NUDOCS 9301260299
Download: ML20127K985 (2)


Text

. .. ... ._ . _ _

l ., .

l.

4 PHILADELPHIA ELECTRIC COMPANY-NUCLEAR GROUP HEADQUARTERS '

955-65 CHESTERBROOK BLVD.

January 20, 1993 WAYNE, PA 19087-5691 Docket Nos.-50-277 (215) m 50-278 '

50-352 50-353-License Nos. DPR-44 NUC1. EAR SERVICES DEPARTMENT DPR-56 NPF-39

-NPF-85 U.S. Nuclear-Regulatori Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station,. Units 2'and 3 Limerick Generating. Station, Units 1 and 2 Completion of the Emergency Response-Data System (ERDS) _

REFERENCES:

1) Generic Letter 89-15, " Emergency . Response Data'.

System," dated August 21, 1989.

2) Letter ' from D. R. Helwig (PECo) to USNRC, dated December 20, 1989.
3) Letter from G. J. Beck (PECo) to USNRC, dated September 30, 1991.
4) Letter from G. J.: Beck (PECo) to USNRC, dated

. December 6, 1991.

, 5). Letter from G. J. Beck (PECo) to USNRC, dated i February 19, 1992.

6) Letter f rom C. L. Miller (USNRC) 'to G. J. Beck (PECo), dated March 19, 1992.
7) -Letter from G. J. Beck-(PECo) to USNRC,_ dated May 21,-1992.

Dear Sir:

As discussed in the revised Appendix E to 10 CFR'50, Section

'VI.4(a), contained-.in the " Emergency Response Data SystM; Final Rule" dated August 13, 1991-(56 FR 40185),-licensees were required to participate in the Emergency Response ' Data - System (ERDS) program. As a part of this program, each licensee was required to complete the implementation to the ERDS-by February 13,.1993, or before initial escalation to full power.

nenn92 l 9301260299 930120 ~~

PDR- ADOCK 05000277 l

l j-F- png

L6cument Contrcl Desk January 20, 1993

. Page 2 In accordance with this requirement, Philadelphia Electric Company (PECo) has completed the installation and testing of the ERDS for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, and for Limerick Generating Station (LGS), Units 1 and 2. The ERDS has been implemented at both stations.

If you have any questions, please contact us.

Very truly yours,

,/ h' G. J. Beck, Manager Licensing Section cc: T. T. Martin, Administrator, Region I, USNRC J. J. Lyash, USNRC Senior Resident Inspector, PBAPS W. P. Dornsife, Commonwealth of Pennsylvania T. J. Kenny, USNRC Senior Resident Inspector, LGS i