Docket Nos. 50 424, 50-425 License Nos. NPF-68, NPF-81 Georgia Power Company ATTN: Mr. W. G. Hairston, Ill Senior Vice President Nuclear Operations P. O. Box 1295 Birmingham, AL '35201 Gentlemen:
SUBJECT:
V0 GILE ELECTRIC GENERATING PLANT EMERGENCY PLAN REVIEW, REVISION 16 We have completed our review of_ Revision 16 to your Vogtle Electric Generating Plant Emergency Plan dated July 1992.
Except for the comments identified in, our review concluded that the changes were satisfactory and meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50. The comments in the Enclosure were discussed in a phone conversation with a Mr. Roberts of your staff on September 1,1992 - During this discussion, your staff committed to address the comments in the Enclosure-in a future Emergency Plan submittal.
Please be reminded that 10 CFR 50.54(q) requires that proposed changes that decrease the effectiveness of your Emergency Plan shall not be implemented without application to and approval by the Commission.
However, changes may be made without Commission approval if such changes do not decrease the effectiveness of the Plan, and the Plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.
If a change is made without approval, you should furnish copies in-accordance with 10 CFR 50.54(q). Also, any changes to the Emergency Plan Implementing l
Procedures should be made in accordance with the requirements of 10 CFR 50, l
Appendix-E,Section V.
L Should you have any questions regarding this letter, please contact Mr. Al Gooden of our staff at 404-331-6206.
Sincerely, William E. Cline, Chief Radiological Protection and Emergency Preparedness Branch Division of Radiation Safety and Safeguards
Enclosure:
(See page 2) 250027 1
9301250176 930113" I
PDR ADOCK 05000424
.} {l
~F PDR
Georgia Power Company 2
Enclosure:
Vogtle Emergency Plan, Rev. 16 cc w/ encl:
R. P. Mcdonald Executive Vice President Nuclear Operations Georgia Power-Company P. O. Box 1295 Birmingham, AL 35201 C. K. McCoy Vice-President Nuclear Georgia Power Company P. O. Box 1295 Birmingham, AL 35201 W. B. Shipman General Manager, Nuclear Operations Georgia Power Company P. O. Box 1600 Waynesboro, GA 30830 J. A. Bailey Manager-Licensing Georgia Power Company P. O. Box 1295
' Birmingham, AL 35201 Nancy G. Cowles, Counsel Office of the Consumer's Utility Council 84 Peachtree Street, NW, Suite 201 Atlanta, GA 30303-2318 Office of Planning and Budget Room 615B-270 Washington Street, SW Atlanta, GA 30334 Office of the County Commissioner Burke County Commission Waynesboro, GA 30830-Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE, Suite 1252-Atlanta, GA 30334-(cc w/ encl cont'd.on page.3)
_ _ -_ _ _ :-u,
t Georgia-Power Company 3
(cc w/enci cont'd).'
-l Thomas Hill, Manager
~
Radioactive Materials Program.
Department of Natural Resourcos 4244 International Parkway Suite 114 i
Atlanta, GA. 30354 Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 s
Dan H.-Smith Vice President Power Supply 0perations Oglethorpe Power Corporation 2100 E. Exchange Place Tucker, GA 30085-1349 Charles A. Patrizia, Esq.
Paul, Hastings, Janofsky & Walker 12th Floor 1050 Connecticut Avenue, NW Washington, D. C.
20036 bcc w/ encl:
~
S. Sparks. Ril D. Hood, NRR P.. Skinner, Ri!
A. Herdt, Ril Document Control Desk NRC Resident inspector U.S. Nuclear Regulatory Commission P. O. Box-572 Waynesboro, GA 30830 0
/
\\.
/
,m RiliDRSS k!I:..
D. S RI)DRP GSalye, rs p$,w 6
n or P kinner
- W 92 V'/(/92
_\\\\ /p/92 tf *p A
\\
1 i
i Enclosure i
1.
Table B 1, the change to the position assignments for the Emergency Communications Manager and Public Information Director resulted in the assignments being identical.
E.
Appendix 8, Old Table 1, Emergency Communication Organization Assignment was deleted.
3.
Appendix 8, Section 1.0 c., the requirement for testing was deleted.
4.
Appendix 8, Section 17.0 F.1., the requirement for update and distribution was changed from annual to yearly.
f l.