ML20127J986
| ML20127J986 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 01/06/1993 |
| From: | Cline W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20127J988 | List: |
| References | |
| NUDOCS 9301260014 | |
| Download: ML20127J986 (4) | |
See also: IR 05000424/1992028
Text
_
_
_-____
<
i
gi)
.
.
m?a
b 1993
.
Docket Nos. 50-424, 50 425
License Nos. NPF-68, NPf-81
4crgta Power Company
AITN: Ik. W. G. Hairsto% 111
Senior Vice Pru.ident
Nuclear Operations
P. O. Hox 1295
Birmingham, AL 3520i
Gentlemen:
SUBJECT:
NOTICE Of V10LA110N
(NRC INSPECTION REPORT NOS. 50 424/92-28 AND 50-425/92-28)
This refers to the inspection conducted by G. B. Kuzo of this office on
November 30 - December 4, 1992.
The inspection included a review of
at.tivnios authorized for your Vogtle Electric Generating Plant.
At the
conclusion of the inspection, the findings were discussed with those members
of your staff identified in the report.
Areas examined during the inspection are identified in the report. Within
these areas. the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice).
The violation is of concern because the failure to follow
procedures for quality control of gaseous effluent monitor operability could
resuh in delays in identifying any inaccurate measurements of radionuclides
released to the environment,
further, the failure to follow your procedure
for labeling B-25 t' oxes containing soils contaminated with low concentrations
of radionuclides could result in the improper release of the radioactive waste
materials from a radioactive material storage area.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
in your
response, you should document the specific actions taken and any additional
acticns you plan to prevent recurrence.
After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
9301260014 930106
ADOCK 05000424
)
G
[hI
.- - _ _ - - _ - _ _ - _ _
__
c
s'
.
.
Georgia Power Company
2
In accordance with 10 CfR 2.790(a), a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(,I l GilO j c pit t d - -
j,
(
b(d I
l
William E. Cline, Chief
Radiological Protection and
Emergency Preparedness Branch
--
Division of Radiation Safety
and Safeguards
inclosures:
1.
2.
NRC Inspection Report
cc w/encis:
R. P. Mcdonald
Executive Vice President
Nuclear Operations
Georgia Power Company
P. O. Box 1295
Birmingham, t.'
35201
C. K. McCoy
Vice President Nuclear
Georgia Power Company
P. O. Box 1295
Birmingham, AL 35201
W. B. Shipman
General Manager, Nuclear Operations
Georgia Power Company
P. O. Box 1600
Waynesboro, GA 30830
J. A. Bailey
Manager-Licensing
Georgia Power Company
P. O. Box 1295
Birmingham, AL 35201
(cc w/encls cont'd on page 3)
--__-_-_ - _ _ _ -_
____
_ - _ _ _ - _ - - - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - - _ - _ - _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ - - - _
e
.
Geo gla Power Company
3
(cc w/encis: cont'd)
i
Nancy G. Cowles, Counsel
Office of the Consumer's
litility Council
84-Peachtree Street, NW, Suite 201
Atlanta, GA 30303-2318
Office of Planning and Budget
Room 6158
270 Washington Street, SW
Atlanta, GA 30334
Office of the County Commissioner
Burke County Commission
Waynesboro, GA 30830
Harold Rehois, Director
Department of Natural Resources
205 Butler Street, SE, Suite 1252
j
Atlanta, GA 30334
Thomas Hill, Manager
Radioactive Materials Program
Department of Natural Resources
4244 International Parkway
Suite 114
-
Atlanta, GA 30354
Attnrney General
"_;
Law Department
i
132 Judicial Building
Atlanta, GA 30334
Dan H. Smith
Vice President
Power _ Supply Operations
i
Oglethorpe Power Corporation
2100 E. Exchange Place
Tucker, GA 30085-1349
Charles A. Patrizia, Esq.
. Paul, Hastings, Janofsky & Walker
12th Floor-
-
1050-Connecticut Avenue, NW
Washington, D. C.
20036
bec w/encls:-
S._ Sparks. Ril
D.- Hood,.NRR
P. Skinner, Ril
(bcc w/encls cont'd on page 4)
.
.
. .
1
.
,
Georgia Power Company
4
(bec w/encls: cont'd)
A. Herdt, Ril
Document Control Desk
NRC Resident inspector
U.S. Nuclear Regulatory Commission
P. O. Box 572
Waynesboro, GA 30830
L
r
i
Ril:DRSS
Ril:DRSS
Ril:DRP
9 CKuzo
TDeckr
P i ner
'
i/3/92
\\///92
1/6/92-
i
l
i
b
.
j