Interim Potential Significant Deficiency SD-75 Re Nonconforming Terminations in CVI Corp Equipment.Initially Reported on 850213.S&W Review of QA Records Did Not Identify Lug Crimping.Next Rept by 850808
ML20127J911
Person / Time
Site: Millstone 
Issue date: 06/12/1985
From: Opeka J, Sears C
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
F0722A, SD-75, NUDOCS 8506270180
Download: ML20127J911 (2)


Text

o sp NOltTHEAST UTILITIES conor i On,c... semen street. s.rnn, connecticut

' NENUs$s Es cow P.O. BOX 270 m' oar amma ca"*'

HARTFORD, CONNECTICUT 06141-0270 k

k J

,,0. U. "UE* *' 0,'c *

(203) 66s-5000 June 12,1985 Docket No. 50-423 F0722A Dr. Thomas E. Murley Regional Administrator Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

Reference:

W. G. Counsil to T. E. Murley, F0698A, dated March 15, 1985.

Dear Dr. Murley:

Millstone Nuclear Power Station, Unit No. 3 Reporting of Potential Significant Deficiencies in Design and Construction:

Nonconforming Terminations in CVI Corporation Equipment (SD-75)

In a February 13, 1985 telephone conversation between your Mr. T. Rebelowski and our Mr. R. K. McCarthy, Northeast Nuclear Energy Company reported a potential significant deficiency in the construction of Millstone Unit No. 3 as required by 10CFR50.55(e).

The potential significant deficiency involved improper terminations found in equipment supplied by CVI Corporation. Termination deficiencies include crimps which were unacceptable per vendor's instructions, terminations crimped with the wrong tools, multiple conductors crimped in one lug, and incorrect lug size used.

The following equipment has been inspected and found to be deficient at Millstone Unit No. 3:

o HVQ* ACUS 1 A, IB,2A, IB - Engineered Safety Features Building Self-Contained Air Conditioning Units o HVR*PNLFLT J A, IB - Auxiliary Building Filtration Units o HVR*PNLFLT 2A,2B - Fuel Building Filtration Units o HVR*PNLFLT 3A, 3B - Supplementary Leak Collection and Release System Filtration Units We have determined that this condition represents a significant deficiency in the final design of Millstone Unit No. 3.

8506270180 850612 PDR ADOCK 05000423

\\

S PDR 10 4

f'.

At Northeast Utilities Service Company's request, our Architect-Engineer, Stone

& Webster Engineering Corporation, has performed a review of the Vendors QA.

and Engineering Records and found no pertinent information regarding lug crimping. Nonconformance and Disposition Reports 10916, 10828, 10996, 10926, and 10893 document inspection and rework of these deficient lugs. A 100%

inspection of the lugs in the 2 remaining CVI panels (3 HVC*PNLFLT 1 A and IB) will be performed.

We will provide you with an update on this matter by August 8,1985.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY d,S.D

3. F. Opeka' Senior Vice President By: C. F. Sears Vice President cc:

Mr. J. M. Taylor, Director Division of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555

)