ML20127J719

From kanterella
Jump to navigation Jump to search
Documents Rept by a Ward of Util During 661025 Telcon,That Reactor Fabrication Rept Based on 661011 Meeting,Will Be Submitted within Two Wks
Date released: 05/20/2020 Download: ML20127J719


Summary of 661011 Meeting W/Applicant for Plant Re Field Const of NSP Primary Vessel.Attendees Listed
ML20127J730
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 10/25/1966
From: Boyd R
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
Download: ML20127J730 (5)
Documents Rept by a Ward of Util During 661025 Telcon,That Reactor Fabrication Rept Based on 661011 Meeting,Will Be Submitted within Two Wks
ML20127J715
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 10/25/1966
From: Boyd R
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
Download: ML20127J715 (1)