ML20127J616
ML20127J616 | |
Person / Time | |
---|---|
Site: | 07106272 |
Issue date: | 06/14/1985 |
From: | Macdonald C NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
To: | |
Shared Package | |
ML20127J614 | List: |
References | |
NUDOCS 8506260725 | |
Download: ML20127J616 (5) | |
Text
%____-----_--------------------------;
" " "" ' *
- C "
CERTIFICATE OF COMPLlANCE l; ioyap" CFa n FC3 CAD 12 ACTIVE MATERIALS PACKAOES lj 1 a CERTIFICATE NUMBER b REVISICN NUMBER c PACKAGE IDENTIFICATION NUMBER d PAGE NUMBER e TOTAL NUMBER PAGES
,l 6272 9 USA /6272/B( ) 1 3 g kJ ll l 2 PREAMBLE
- a. This certificate is issued to certif y that the packaging and contents described in item 5 below, meets the apphcable safety standards set forth in Title 10 Code 5 l, of Federal Regulahons. Part 11. -Packaging of Radioactive Materials for Transport and Transportation of Radioactive Matenal Under Cer'ain Conditions " g)
I b. This certificate does not reheve the consignor from comphance with any requirement of the regulations of the U S. Department of Transportation or other N lj spphcable regulatory agencies, including the government of any country through or ento which the package will be transported k]
I O' H E Il! m==.=r>s o' * **'-======~
Ni
- ~^ CAT,eN I Ei Es ldli U.S. Ecology Protective Packaging, Inc. application El I P.O. Box 7246 dated June 24, 1974, as supplemented E" N,, Louisville, KY 40207 I E
lj 71-6272 E l c. DOCKET NUMBER kg 4 CONDITIONS This certificate is conditional upon fulfilhng the requirements of 10 CFR Part 71, as apphcable, and the conditions specified below gj s O p (a) Packaging:
f (1) liodel No.: 6272 E,
(2) Description El g!
I E!
Ei A protective overpack having a double-walled, low-carbon steel shell E I (3/16" outer wall and 20- [j foam (nominally 7" thick) thermal-shock gauge insideinsulation wall) with between rigid polyurethane the walls, gj f(j The edges of the overpack are reinforced with 10-gauge steel angles p) ll welded to the outer face of the walls and internal diagonal 14 guage Eq 1 steel plates. Overpack lid closure is provided by three,1" steel E!
I, rods which extend the full width, welded to an end plate at one end I) and secured by a pin at the other end. Enclosed within the overpack
((l y!
g is a bolted and gasketed low carbon steel inner container. The container will be either of two similar designs, M-3A or M-4 The gross weight f) g E:
l of the package is about 6,100 pounds. E:
pl E; (3) Drawings li The overpack is constructed in accordance with Mechanics Research, f( Inc., Drawing No. 121347, revised to May 21, 1970. The M-3A steel waste bin (inner container) is constructed in accordance with Argonne l
N sl' 1 National Laboratory's Drawing No. J0306-009-DE-0. The 11-4 steel waste E I bin (inner container) is constructed in accordance with Argonne National 4 Laboratory's Drawing Nos. J0306-0016-DD-00 and J0306-0017-DC-00. l l
i
.l E l!
I' l
l l
4 4i 4;
f g!
i h62607hg07106272 C ADO 5 050614 gl q PDR 6.__________________________________________.______...
- - _ - - - - _ - = _ - - _ _ _ _ - _ - _ - - - _ _ -zgr l &c + c2m u: wm v w w w c <
ggun,,,,,,,,,,,,,,,,,
l l i :
li Page 2 - Certificate No. 6272 - Revision No. 9 - Docket No. 71-6272 gl l l' N 1 I '
I i
! 5. (b) Contents l 1 N J; (1) Type and form of material p I E 1
(1) Dry, solid radioactive material within either an M-3A or M-4 j steel waste storage bin; or llN 1 E Jl (ii) Liquid analytical residues from the dissolution of spent reactor p
.q fuel rods, solidified in cement (see table, p. 3 of application *). g
! The cement is contained in 1.5-gal steel can closed with a slip It
{ cover lid. The two primary cans are packed in a secondary steel can sealed with a press fit' lid (see Figure 2 of application *). f 3
1 i
The secondaryJcontainment package / contents are placed within a p; g
1 radiation shield (lid secured with'six,1/2"-13UNC bolts with g; J welds in~ accordance with application *) centered in a D0T Specification E-3 17-C_552 gal steel drum (see Figure 1 of application *). The drum E; j is sealed with styrene-butadiene rubber gasket contained with a I standard drum closure and loaded into an M;3A steel waste bin 3
3 1
with polyurethane foam dunnage material '(Instapack 200, or l l:l gi equivalent)k ' N
~
1 . / e g!
/ n/
1, - N ; .q .
(. 5:
I;
'* Department of Energy letter dated April 15, 1983. E!
1 c .
r, t
( 3 )7 , %? E
)
3 (2)
Maximum tx, quantity ofg:n ,,rial per gckagej%
,- - - g ' ;
, 2D
- [
p:
1 The maximum weight of- thelc_ontents.(including ,dunna'ge) shall not g; exceed 3,000. pounds, and: t r 6 -! i K K p; Jl, 1
[' r' Ml ) ? f D .~ l~ Ei For the content,s'specified (in '5(b)(1)(1):
ji I e
xfRy/ ($
l;
)!
1 The thermal heat load shalljnot exce'ed ;5 watts; o'r g:
1; 'n 'i s(+ p: 1 1 For the contents specified in 5(b)(1)(ii):t;J ~
E-1 N.
3 The package is limiled to 435 cijf mixed fission products and 12 g ll fissile material. ^ i- B l s
}!i [
1! 6. (a) For any package containing water and/or organic substances which could E 1 radiolytically generate combustible gases, detennination must be made by E 1 tests and measurements or by analysis of a representative package such that E j the following criteria are met over a period of time that is twice the lg 3
expected shipment time:
i E I (1) The hydrogen generated must be limited to a molar quantity that would E I be no more than 5% by volume (or equivalent limits for other inflam- E I E mable gases) of the secondary contaiger gas void if present at STP I
] (i .e. , no more than 0.063 g-moles /f t at 14.7 psia and 70*F); or 1
I (ii) The secondary container and cask cavity must be inerted with a diluent 1 to assure that oxygen nust be limited to 5% by volume in those portions of the package which could have hydrogen greater than 5%.
{ l r!
1
.-----------------------------------------------g
- '~' C:NDITl:NS (continu1d)
E; a
Page 3 - Certificate No. 6272 - Revision No. 9 - Docket No. 71-6272 ll j1
- ] E: !
L E: '
]
E:
q 6. (continued) E: l q E:
i For any package. delivered to a carrier for transport, the secondary container l j must be prepared for shipment in the same manner in which determination for gas generation is made. Shipment period begins when the package is prepared
[!
g 5: ;
l]j (sealed) and must be completed within twice the expected shipment time. E:
j E:
1 (b) For any package containing materials with radioactivity concentration not 1 exceeding that for low specific activity material, and shipped within 10 days of preparation, or within 10 days after venting of drums or other
[l g!
g S
- secondary containers, the determination _in (a) above need not be made, and t; i the time restriction in -(a) above"do'se (not' apply. I h 7. Contents within the inne co tainer must be eith pal:ked full or must be securely
[ braced to prevent movement. , g; N' L' I;
- 8. The cover of the it-3A inner container must be secured by at least 20 bolts (5 h}d s
per side) of not<less than 5/16-inch diameter. The cover of the H-4 inner container must be secured by at least 34 bolts of,not less than 5/16-inch diameter.
E:
i:t E
'L >N
[ , .- /f< f f
i
- 9. Prior to each shipment the inner container lid. gasket must be _ inspected. The gasket must be; replaced if inspection shows sny, defects or every 12 months,
[(
g!
j whichever occurs first. '. ' 't 2_. . ! / -
E:
1 ; i . ' . M _.L E r , p:
h 10. The package auhhorized by th'is cerificate~15 hereby a'pproved 'for use under the
~
I general license provisions of 10 CFR ,671.12..
jf 2 h i 11.
m ; .
Expiration date:= ' April 30,.1990.. k ..? ;
en '
(
_ g E:
q C, ' i;' . ,? 1 J ; R:
9 '
D (' REFERENCES A s E:
4 V, ,,, ,
, E;
)
2 Protective Packaging, Inc.'ap' plication dated June 24, 1974.
- v. [
R:
-1l Supplement dated: January 28, 1975. , , , J E:
) g,
.) ,
Department of Energy, Chicago Operations Office ' supplement dated: April 15, 1983.
[
}
Department of Energy supplement dated: liay 20, 1985. l R
fl j
- 1j FOR THE U.S. NUCLEAR REGULATORY COMilISSION E E
1 E
'1! E Charles E. MacDona d, Chief h
i g i Transportation Certification Branch I Division of Fuel Cycle and E 1l Material Safety 8 1 E t
Date. JUN 141985 E g
y!
I F s! F 1! E f E II E n .. ., ,,,,,
u,,,,,,,,,,o .,,,,,,,g
_nue
e s.:r o,, UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION g E WASHINGTON, D. C. 20555
\...+J Transportation Certification Branch Approval Record Model No. 6272 Package Docket No. 71-6272 By application dated May 20, 1985, Department of Energy requested aprpoval of revised steel waste bins to be used in the Model No. 6272 package.
The previous waste bin was designated as M-3. The revised bins are designated as it-3A and M-4.
The enclosure to this Approval Record gives a physical comparison between the three bins. The bins are all of a similar construction with the revised bins having improved lid gaskets made of Neoprene with bonded corners . (The previous gasket material was weather stripping.) The M-4 bin has a lid constructed of 9-gauge carbon steel rather than 12-gauge for the M-3A.
The applicant requested that the neoprene gasket be inspected but not replaced on an annual basis. As a matter of practice, we require all reusable gaskets of this type to be replaced at least annually. No new infonnation was presented to change our position at this time.
Char es .MacDonalcf,Ih'Ief Transportation Certification Branch Division of Fuel Cycle and Material Safety, NMSS Date: M I 4 SE
4 '
'l g C0fARISON OF M-!!!, M-IIIA, ANO 54 8!!f DESIGNS ITEM 5!!!
M-! IIA
- 1. Glaensions M-a_
58-3/8" I 50-3/8" I 72-3/8" (L I W I H) Same as M-!!!
58-3/8" I 50-1/2" I 72-1/4'
- 2. Materials Walls, 12-gauge, low-carbon steel (L I V I H) and Floor Pan Same as M-III Sane as M-!!!
- 3. Materials, Ltd 12-gauge, low-carbon steel Same as 5 111 4 Ltd Bracing Angle 9-gauge low-carbon steel None Iron Mone Inside grid of 2' X 2* I 3/16" 5 Ltd Solts 20 bolts, 5/16-18 20 bolts, S/16-18 34 bolts, 5/16-18 with seal washers 6 Corner Joints 8vtt joints with continuous and Welds butt welds 3/4* wrap-around with contfrwous-filet Same as M-IttA weld on outside and 3-12 filet welds on inside.
7 Floor Pan Wrap around edges are located inside of bin and pan is welded to side bottoms at Wrap around edges are located outside Same as M-!!!A outside of bin; no inside welds, of bin god pan is welded to outside of walls with a continuous-filet weld, one-inch from bottom walls, and to bottom inside walls with a 3-12 filet wid.
8 Squareness 8 races Two angle-tron braces opposite corners of bin Four braces--4* wide I 1/2* thick, welded Sane as M-!!!A to inside walls 6' from the top.
- 9. Lifting Strap Mater- 3/4* dieneter steel strap welded to i tal and Welds flange with 3/4" weld. (Fleid welds 3/4" diameter strap welded to flange with Same as M-!!! A 3/8' welds, wre actually 3/8.")
l 10 Strap F1ance Mater-tal and Welds 12" I 12* I 3/16" thick steel welded to bin walls with 2-1/2 5/8, 1/4" 12* I 12" X 3/16" thick steel welded to Same as * !!!A thick filet welds, bin wall with 4-8 (3/16' thick) filet welds
- 11. Gasket Four-piece lid gasket (weather strip-ping 7/16" thick I la wide) One-piece (bonded corners) neoprene gasket Sane as M-IIIA 3/16" thick I 1-3/4" wide
- 12. Dravings J0317 0003 DE(CS-E-2273) J0306-0009-DE i
J0306 0016-00, J0306-0017-DC i