ML20127J505

From kanterella
Jump to navigation Jump to search
Forwards Rept, Connecticut Yankee Structural Reevaluation of Plant Structures to Address SEP Topic III-7.B Code Changes, Determining That All Structures Are Capable of Withstanding All Design Conditions Stipulated by SEP Topic
Date released: 05/20/2020 Download: ML20127J505


Connecticut Yankee Structural Reevaluation of Plant Structures to Address SEP Topic III-7.B Load Combinations Code Changes.
ML20127J539
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/30/1992
From:
HARSTEAD ENGINEERING ASSOCIATES, INC.
To:
References
TASK-03-07.B, TASK-3-7.B, TASK-RR
Download: ML20127J539 (55)
Forwards Rept, Connecticut Yankee Structural Reevaluation of Plant Structures to Address SEP Topic III-7.B Code Changes, Determining That All Structures Are Capable of Withstanding All Design Conditions Stipulated by SEP Topic
ML20127J502
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/15/1993
From: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TASK-03-07.B, TASK-3-7.B, TASK-RR
Download: ML20127J502 (5)